R2E @ Pt5 - RadWG meeting. Presenting a concept Prepared by M Gastal & S Maridor. UJ56 Shielding Option. R562. UJ56. VERS UJ56. F. DELSAUX. 1500. ENVIRON 18 M HT LIBRE 2600 mm. CHICANE. VERS UJ57. UJ56 Shielding Option. BLINDAGE UJ56. COMPLEMENT BRIQUETTES ACIER HAUTEUR 600mm. - PowerPoint PPT Presentation

Transcript of R2E @ Pt5 - RadWG meeting

Page 1: R2E @  Pt5 -  RadWG  meeting

[email protected] 1

R2E @ Pt5 - RadWG meetingPresenting a conceptPrepared by M Gastal & S Maridor

25/03/2010

Page 2: R2E @  Pt5 -  RadWG  meeting

CERN, February 9th Extended R2E Seminar & Workshop PreparationCERN, February 9th Extended R2E Seminar & Workshop Preparation

F. DELSAUXENVIRON 18 MHT LIBRE 2600 mm

CHICANE

UJ56

1500

R562

VERS UJ56

VERS UJ57

UJ56 Shielding Option

2

Page 3: R2E @  Pt5 -  RadWG  meeting

CERN, February 9th Extended R2E Seminar & Workshop PreparationCERN, February 9th Extended R2E Seminar & Workshop Preparation

BLINDAGE UJ56

MUR FIXE ACIERHAUTEUR 2000mm

COMPLEMENTBRIQUETTES ACIERHAUTEUR 600mm

BLINDAGE ACIERDEMONTABLEEP. 400mmHAUTEUR 2000mm

MONORAIL

RAIL DE MANUTENTIONDES BLOCS DE BLINDAGE

300mm

800mm

300mm

400mmxz view

UJ56 Shielding Option

F. DELSAUX

3

Page 4: R2E @  Pt5 -  RadWG  meeting

[email protected] 425/03/2010

UJ56 1st floor

Compensators

24 racks

Page 5: R2E @  Pt5 -  RadWG  meeting

[email protected] 525/03/2010

UJ56 Gnd Floor

Page 6: R2E @  Pt5 -  RadWG  meeting

[email protected] 6

Issues in the UJ56Shielding effectiveness GND Floor ~10

Shielding effectiveness 1st Floor ~2

25/03/2010

Page 7: R2E @  Pt5 -  RadWG  meeting

[email protected] 7

Issues in the UJ56Shielding effectiveness GND Floor ~10

Shielding effectiveness 1st Floor ~2

25/03/2010

Page 8: R2E @  Pt5 -  RadWG  meeting

[email protected] 8

Goal and initial idea• Goal: Find a permanent solution to relocate

the electronics in the UJ56• Limitation: For some equipment the cable

length is critical (compensators)• Idea: Find some room in the USC55 if not

detrimental to CMS

25/03/2010

Page 9: R2E @  Pt5 -  RadWG  meeting

[email protected] 9

Very first draft proposal

• Move all or part of the EL safe room on the ground floor of the UJ56 into the USC55

• Lower the power converters from the 1st floor of the UJ56 to the ground floor and build adequate shielding

• Move all remaining racks from the 1st floor of the UJ56 into the USC55 (Cryogenics, WIC, Timing, Remote-Reset, UPS, Access Control, Network, AUG control, Electrical Distribution (Control), GSM, Fire/ODH)

25/03/2010

Page 10: R2E @  Pt5 -  RadWG  meeting

[email protected] 10

39racks

25/03/2010

Page 11: R2E @  Pt5 -  RadWG  meeting

[email protected] 11

UJ56 Gnd Floor

Area taken by power convertors→ integration to be studied

Shilding

25/03/2010

Page 12: R2E @  Pt5 -  RadWG  meeting

[email protected] 1225/03/2010

Page 13: R2E @  Pt5 -  RadWG  meeting

[email protected] 13

• 5 transformers could be brought up and housed in a surface building together with other CMS electrical equipment (eg 3 MVA UPS)

• All or part of the UJ56 safe room could be relocated in the freed area

25/03/2010

Page 14: R2E @  Pt5 -  RadWG  meeting

[email protected] 14

Service Area L-2

5 x 2MVA transformer to beRelocated on the surface

USC55

25/03/2010

Page 15: R2E @  Pt5 -  RadWG  meeting

[email protected] 15

Footprint of the UJ56 safe room→ Intergration to be studied

Service area L-2

USC55

25/03/2010

Page 16: R2E @  Pt5 -  RadWG  meeting

[email protected] 16

Footprint of the UJ56 safe room→ Intergration to be studiedService area L-2

USC55

25/03/2010

Page 17: R2E @  Pt5 -  RadWG  meeting

[email protected] 17

USC55 Footprint of the UJ56 safe room→ Intergration to be studiedService area L-2

25/03/2010

Page 18: R2E @  Pt5 -  RadWG  meeting

[email protected] 18

• 2 candidate areas to relocate the 24 racks from UJ56– Preferred option: Top of CV room– Back up: part of underground control room

25/03/2010

Page 19: R2E @  Pt5 -  RadWG  meeting

[email protected] 19

Top Of CV roomArea available for UJ56 racks

USC55

25/03/2010

Page 20: R2E @  Pt5 -  RadWG  meeting

[email protected] 20

Underground Ctrl room

USC55 24 racks (uj56 du 1er )→ Integration to be studied

25/03/2010

Page 21: R2E @  Pt5 -  RadWG  meeting

[email protected] 21

• Relocate UJ56 racks in USC55 control area• Existing floor beams already suitable

• If need be, build a second floor to house a control room

25/03/2010