20 STANWIX STREET, 10rH FLOOR PITTSBURGH, PENNSYLVANIA 15222 June 22, 2015 To: DISTRIBUTION Dorothy M. Alke Vice President, Environmental Projects 412.642.2562 Telephone 412.642.3008 Fax [email protected] Re: Quarterly Inspection and Maintenance Report - Second Quarter 2015 Lemon Lane Landfill, Bloomington, Monroe County, Indiana This letter report summarizes the quarterly inspection and maintenance activities completed at the Lemon Lane Landfill site during the second quarter of 2015. This report has been prepared in accordance with procedures and reporting requirements outlined in the June 2001 RCRA Cap Inspection and Maintenance Plan (CIMP) prepared by CBS Corporation. The quarterly inspection was performed on June 10, 2015. A copy of the Inspection and Routine Maintenance Report is attached. All maintenance needs identified during the inspection will be addressed as soon as possible. Routine maintenance activities for this quarter included cap mowing and herbicide treatment, as well as periodic inspections of site fencing and monitoring wells. No non-routine maintenance activities were performed in this quarter. The 2015 third quarter inspection at Lemon Lane Landfill is scheduled for the second week of September. If you have questions regarding this report, please contact Pat Kneip at (513) 791-4418. Dorothy M. Alke Vice President, Environmental Projects . BP:15-0026 Attachment

Transcript of QUARTERLY INSPECTION AND MAINTENANCE REPORT- … · Lane Landfill site during the second quarter of...

Page 1: QUARTERLY INSPECTION AND MAINTENANCE REPORT- … · Lane Landfill site during the second quarter of 2015. This report has been prepared in accordance with procedures and reporting

~CBS 20 STANWIX STREET, 10rH FLOOR PITTSBURGH, PENNSYLVANIA 15222

June 22, 2015

To: DISTRIBUTION

Dorothy M. Alke Vice President, Environmental Projects

412.642.2562 Telephone 412.642.3008 Fax

[email protected]

Re: Quarterly Inspection and Maintenance Report - Second Quarter 2015 Lemon Lane Landfill, Bloomington, Monroe County, Indiana

This letter report summarizes the quarterly inspection and maintenance activities completed at the Lemon Lane Landfill site during the second quarter of 2015. This report has been prepared in accordance with procedures and reporting requirements outlined in the June 2001 RCRA Cap Inspection and Maintenance Plan (CIMP) prepared by CBS Corporation.

The quarterly inspection was performed on June 10, 2015. A copy of the Inspection and Routine Maintenance Report is attached. All maintenance needs identified during the inspection will be addressed as soon as possible.

Routine maintenance activities for this quarter included cap mowing and herbicide treatment, as well as periodic inspections of site fencing and monitoring wells.

No non-routine maintenance activities were performed in this quarter.

The 2015 third quarter inspection at Lemon Lane Landfill is scheduled for the second week of September.

If you have questions regarding this report, please contact Pat Kneip at (513) 791-4418.

Dorothy M. Alke Vice President, Environmental Projects . BP:15-0026

Attachment

Page 2: QUARTERLY INSPECTION AND MAINTENANCE REPORT- … · Lane Landfill site during the second quarter of 2015. This report has been prepared in accordance with procedures and reporting

DISTRIBUTION Tom Alcamo, USEPA Region 5 Jessica Fliss, IDEM Simon Baker, MCHD John Langley, CBU

cc: John Bassett, AECOM Jeff Litka, Tetra Tech EM, Inc. Neill Vaughan, PSARA BP Files

Page 3: QUARTERLY INSPECTION AND MAINTENANCE REPORT- … · Lane Landfill site during the second quarter of 2015. This report has been prepared in accordance with procedures and reporting

ATTACHMENT 1

Inspection and Routine Maintenance Report Non-Routine Maintenance Report

Second Quarter 2015 Lemon Lane Landfill, Bloomington, Monroe County, Indiana

Page 4: QUARTERLY INSPECTION AND MAINTENANCE REPORT- … · Lane Landfill site during the second quarter of 2015. This report has been prepared in accordance with procedures and reporting

LEMON LANE LANDFILL

• =A= QUARTERLY INSPECTION AND MAINTENANCE REPORT

~ TI!OINOLOGil!S, JNC.

INSPECTOR: f11-r' l<l'-lff>~~ 1 ~ {r:>AOAj DATE: 6flo/J$ AFFILIATION(S): __ ~-----

rJ/4 OTHER PARTIES:

GENERAL SITE INSPECTION - (identify specific location of any areas requiring maintenance)

Yes No Routine Maintenance Comments -1. Are perimeter fences in good condition? 'fi . D /Vo t >Sve.5'

2. Are gates and locks in good condition? iz1 D rJo I S5 U (.'$'

3. Are warning signs intact and visible: ~ D "'~ is.s:v ~.5 a fll"b fV\- d w 1 ..a:, tA/r\('L~~

4. Does Cap need to be mowed? D li LAS'i"' c..re~i<

'

5. Is there surface debris or sediment on/in: ii Perimeter channels? 0 /\f o ,,_ ~.SU<!,.5

Perimeter channel crossings (North & East)?O ~ No 1 ~s vf:..J'

Retention pond outlet at Sargent's Pond? 0 · ~ tJa •S$v~S

6. Is there evidence· of burrowing animals 5~t-\.... {t;d':> (5,.,1 '"'-> t~~u) on Cap or along fence line? D

7. Any areas on Cap where grass is sparse and D ~ f\/o i-t5ve .S soil bare?

8. Was standing water observed on the Cap? 0 f/O ~f>~ve..f

9. Is there adequate drainage around the Cap? ~ 0 N(') J~S'..Je5

10. Are access roads in need of maintenance? 0 fVO ,,~J~.f

G:\Lemon Lana LandHll\Quarterty Cap lnspectlon\LLQuarter1ylnspForm_2011.doc Page 1 of 3

Page 5: QUARTERLY INSPECTION AND MAINTENANCE REPORT- … · Lane Landfill site during the second quarter of 2015. This report has been prepared in accordance with procedures and reporting

GENERAL SITE INSPECTION (continued)

Yes No

11. Are there areas of erosion on the Cap that need repair?

12. Are there areas of erosion around the Cap that need repair?

13. Are there tire ruts on or around the Cap that need repair?

14. Are there areas of differential settlement on the Cap that need to be repaired or need further inspection?

15. Is rip-rap needed In any of the perimeter channels or retention pond?

16. Is there a noticeable concentration of weeds along fence line, perimeter channel or retention pond?

0

0

0

D

D

17. Is the retention pond inlet structure and I associated rip rap clear of debris and sediment?"lll

18. Is the retention pond embankment free of trees and erosion?

19. Are piezometer and monitoring well locking caps in place?

20. Are bollards, concrete pads, and well casings intact?

G:\Lemon Lane Landfill\Quarterly Cap lnspectlon\LLQuarterlylnspForm_2011.doc

0

0

0

0

0

TECHNOLOGIES, INC

Routine Maintenance Comments

H~ri...s~ c::.' t> 6 -rri...<'..(1-r""~~ ~cw~bv~"" FDl'v' -V-}·h1 i..r66-~

Date: {, / i iJ j l S

Page 2 of 3

Page 6: QUARTERLY INSPECTION AND MAINTENANCE REPORT- … · Lane Landfill site during the second quarter of 2015. This report has been prepared in accordance with procedures and reporting

NON·ROUTINE MAINTENANCE REPORT: Lemon Lane Landfill; 'iNO Quarter 20.!§

TEOINOLOGIES, INC.

Inspection Item Number(s) Additional Comment I Maintenance Performed

Date _ _ _ _____ _

Inspection Item Number(s) Additional Comment I Maintenance Performed

Date ____ ____ _

Inspection Item Number(s) Addltional Comment I Maintenance Performed

Date ________ _

Inspection Item Number(s) Additional Comment f Maintenance Performed

Date_. ---------

Date:_b~._,,_/ t_d_,.f_1.S_

G:\Lemon Lane Landfill\Quarterly Cap lnspecttonlLLQuarter1ylnspForm_2011.doe Page3 of 3