PW Engineering Introduction

20
1

description

engineering

Transcript of PW Engineering Introduction

1

Contents

• About us

• Quality policy, HSE & Environment policy

• Organizational structure

• Profile, capabilities & services

• Experience

• Contact details

EN ISO 9001:2008

Certificate Reg. No 20 100 112006707

EN ISO 14001:2004

Certificate Reg. No 20 104 112006708

OHSAS 18001:2007

Certifícate Reg. No 20 116 112006709

2

PWE 07/12/2012

• Pureworld Engineering - industrial engineering company operating across Western and Eastern Europe and the Middle East. The parent Company of Pureworld Engineering is JMG Investments, based in Switzerland.

• Pureworld focuses primarily on oil & gas and power related activities and is a leader in the provision of engineering and procurement services with distinctive capabilities in the design of projects with technological competencies.

• Pureworld’’’’s endeavor towards excellence in construction quality, safety, performance, employee satisfaction and social responsibility has enabled it to be the a trusted company for Engineering and Procurement services.

• Pureworld has partnerships with a number of major international EPC firms.

About us

3

PWE 07/12/2012

• Core competencies are basic engineering, detail engineering and procurement assistance.

• Engineering and project management for the oil and gas, power, biofuels and renewable energy, minerals and process industries.

• Working as a team for more than 20 years.

• Company structure covers all disciplines involved in the development of industrial projects.

• Strong team for Plant 3D CAD Modeling.

• Cooperating with other engineering companies worldwide as a sub-contractor, with experience in multi-office jobs.

About us

4

PWE 07/12/2012

Quality Management System

•Pureworld’s general management has set up a Quality Management System in compliance with ISO 9001 standard. •This QMS system is configured to continually improve its effectiveness at each stage of the work cycle, and to ensure the involvement and professional development of personnel at all levels.•All Pureworld employees are responsible for developing and delivering a high quality products and services.

HSE & Environment policy

• Pureworld designates as essential corporate objectives a continuous improvement of the HSE policy in our a activities.

• We are committed to the health and welfare of persons, the safety of plants and the prevention of the environment.

• Our activity is in compliance with OHSAS 18001.• Pureworld is committed to leading the industry in

minimizing the impact of its activities on the environment, complying ISO 14001.

Quality policy, HSE & Environment policy

EN ISO 9001:2008

Certificate Reg. No 20 100 112006707

EN ISO 14001:2004

Certificate Reg. No 20 104 112006708

OHSAS 18001:2007

Certificate Reg. No 20 116 112006709 5

PWE 07/12/2012

Corporate structure

PW Engineering

DUBAI

PW Engineering

EUROPE

ICARE Procurement

Services

CH / DUBAI

PW Engineering

ROMANIA

International EPC

Firm Partnerships

PW Engineering /

Local Partner

ABU DHABI

PMC Project Based

Structures

Legal structures

Partnerships

6

PWE 07/12/2012

Operational structure

7

PWE 07/12/2012

Profile, capabilities & servicesindustries / services provided

� Upstream an downstream

� Petrochemical and Chemical Plants

� Industrial Processes

� Power Generation

� Environmental

� Feasibility & Concept Studies

� HAZOP Studies

� Basic Engineering

� Detail Design

� Environmental Studies and Projects

� Revamping, Modification and Retrofitting Plants

� Evaluation of Plant and Assets

� Project Management

� Field Supervision

� Project Controls (Cost Control, Planning and

Scheduling)

� Assistance for Authorities Permits

� Assistance for Pre-commissioning,

Commissioning and Start-up Activities

8

PWE 07/12/2012

PROCESS

� Feasibility & Concept Studies

� HAZOP Studies

� Process and Environmental Studies

� Basic Engineering

� Process Simulation

� Process Flow Diagram PFD

� Piping and Instrument Diagram P&ID

� Hydraulic Studies

� Safety Analysis

� Thermal and Hydraulic Rating of Heat Exchangers Fired

Heaters

� Surge and Pulsation Analysis

� Operating Manuals

Profile, capabilities & servicesexpertise

INSTRUMENTATION AND CONTROL

� P&ID Control System Definition

� Instrument Data Base Management

� Field Instrument Data Sheet (Sizing)/Specification/Requisition

� DCS/ESD/F&G/Metering System Management/Supervision

� Package Specification and Vendor Document and Drawing

Review

� Instrumentation Detail Design Document and Drawings, as

follows

� Hook-up Drawings and Material Take-off

� Loop and Wiring Diagrams

� Layout Drawings for Field Instruments, Control and Technical

Room, Analyzer House, etc.

� Main and Secondary Cable Routing and Cable List

� FAT and SAT Activities

� Intrinsic Safety System Documentation

9

PWE 07/12/2012

PIPING

� Equipment Layout

� Piping and Equipment Layout Studies

� Analysis of allowable forces & moments on equipment

nozzles

� Pipe stress analysis (static, dynamic & seismic above

ground & underground)

� Standard & Special supports; Special items (Expansion

joints; Spring support, etc.)

� Piping Material Take Off

� Isometric & General Arrangements

� PDS & PDMS 3D Modeling Equipment, Pipes, Supports

(over 30 years cumulated experience of the people as 3D

software users)

� Model review (30%, 60%, 90%)

� Clash check analysis

MECHANICAL

� Static Equipment calculation: Mechanical design, anchor

bolts, Weights for columns, Drums, Heat Exchangers,

Fired Heaters, Tanks

� Rotating Machines: Process Pumps, Compressors

� Specification, Datasheets, Inquire & Requisition, Bid

Analysis

� Sketches & Guide drawings for: Nozzles orientation, Clips

for piping, supports and platforms

� Detailed Drawings & Vendor document Review

� Remaining Lifetime Assessment

� Insulation & Painting take-off

� Shop/Site Technical Assistance

Profile, capabilities & servicesexpertise

10

PWE 07/12/2012

STEEL STRUCTURES

� Main steel Structure guide drawings

� Static and dynamic analysis for wind & seismic loads

� Platform & miscellaneous steel work drawings

� Steel structure shop drawings and follow-up

� Material take-off

� Load capacity analysis and expertise for steel structures

CIVIL

� Layouts

� Static and dynamic analysis for wind & seismic loads

� Detail design for:

� Concrete structures

� Foundation and structure reinforcement and

formwork

� Roads and pavement

� Sewerage and water drainage

� Plumbing and water supply

� Material take-off

� Field supervision

� Load capacity analysis and expertise for existing buildings

and concrete structures

Profile, capabilities & servicesexpertise

11

PWE 07/12/2012

ELECTRICAL

� Studies and calculations (short circuit level, cable sizing,

cable ampacity)

� Consumer list and load balance

� General one-line diagram

� Diagrams (switchboards & MCC single line, schematic

diagrams)

� Hazardous area classification

� Specifications/Data sheets, Inquires, Requisition, Bid

Analysis

� Substation detailed layout

� Cable list

� Lighting, Earthing, Lightning, Communication system

� Heat tracing system

� Installation drawings, details and material take-off

Profile, capabilities & servicesexpertise

12

PWE 07/12/2012

Pureworld will provide experienced personnel to support Project Managers in the areas of network scheduling, cost control, earned values, change control. For this purpose we use PRIMAVERA/Microsoft Project.

1. Initial - the schedule will be based on milestone schedule and will be create for the support of execution phase.

2. Progress Reporting - provide weekly/monthly reports, with the following content:�Progress status actual vs. planned�Progress “S” curve�Description of the work performed during previous period / Description of the work to be done during next period�Document control register�Project Schedule�Awaited information/hold points and Need List�Change Order status�Invoicing status

3. The planning documents are prepared by the Project Controls/Planning Engineer, based on information provided by the Leads of the Engineering/Design Disciplines.�Milestones Schedule�Time Schedule level I – Overall Project Schedule / Time Schedule level II – detailed by discipline�Time Schedule level III – detailed at package levelThe Schedule is presenting the project milestones, all key activities with corresponding start/completion dates and durations, the critical path and float.The Project schedule is periodically updated with actual values and it is attachment to the Monthly Report.

Project control

13

PWE 07/12/2012

PMC capabilities

� Our PMC capability ensures the achievement of high standards of Safety, Quality and Timely Delivery, maintaining costs within budget for complex projects

� In this role Pureworld supervises all aspects of the project and assumes Single Point Responsibility for timely delivery of Engineering, Procurement and Construction (EPC), including:

� Implement Project Control and Project Management tools designed to ensure project outcome, delivery and enable open Reporting

� Achieve Clients expectations, and manage client’s costs and downsides so as to deliver the expected Project Margin

� Undertake Procurement activities to ensure alignment of incentives, and compliance to standards, timeframe and cost by all parties

� Deliver Construction

� Achieve high standards of Safety and Quality

� Finally, achieve Timely Delivery for the full scope of the EPC Contract

14

PWE 07/12/2012

PMC capabilities

� Our project management helps overcome:

� Experience gaps

� Resource constraints

� Time pressure encountered with complex projects

� Customers benefit from:

� Access to third party master service agreements

� A comprehensive management system

� Our significant experience

� This is achieved through:

� Competent Project Director - answerable for the entire PMC delivery process.

� Supported by highly skilled and experienced Project Managers

� Business KPI targets

� Independent team monitoring Project Outcome, reporting directly to CEO

� Project based Report system that provides visibility and transparency - for ‘real time’analysis

� Comprehensive Project Execution Plan covering all critical areas of the Project15

PWE 07/12/2012

REFERENCES LIST

Experience

Client Project name Project location Scope

Rompetrol Petromidia RefineryParticulate emission reduction at FCC plant ROMPETROL

RAFINARERomania Pre-feasibility Study

Litwin PEL - Lamprell New LNG plant Djibouti 3D modelling

ADCO Abu Dhabi

Litwin PEL - Lamprell

Engineering Services for miscellaneous PMRFs BAB

BATCH – 4 UAE Engineering & Design

GASCO Abu Dhabi

Litwin PEL - LamprellEPC of Habshan Oily Water Sump UAE Engineering & Design

GASCO Abu Dhabi

Litwin PEL - LamprellStress vibration analysis & pipe supports adequacy study UAE Engineering & Design

Enereco Italy Various Upstream projects Irak Engineering & Design

Enereco Italy Process Specification Preparation Turkmenistan Engineering

Enereco Italy Process Specification Preparation Kazahstan Engineering

OMV Petrom

Enreco ItalyOMV Petrom Surface Facilities Development Program Romania Authority Engineering

OMV Petrom

Enreco ItalyOMV Petrom Surface Facilities Development Program Romania

Feed, Basic Engineering & Detail

Design Services

ERAS France Various Oil & Gas projects France Detail Design Services

16

PWE 07/12/2012

Client Project name Project location Scope

Coffeyville Refinery - CCR Platformer Unit Gasoline

Hydrotreater USA - COFFEYVILLE, KANSAS Engineering & Design

Placid Refinery - New Gasoline Hydrotreater Unit USA - TULSA Engineering & Design

Sinclair Refinery - Gasoline Hydrotreater Unit USA - SINCLAIR, TULSA Engineering & Design

P&ID'S updating for Ethoxylation Unit Revamp USA - CLARIANT CLEAR LAKE Detail Design

Fortron Industries - DB6 Expansion USA - WILMINGTON Detail Design

Tesoro Salt Lake City Benzene Reduction USA - SALT LAKE CITY Engineering & Design

Celanese/Bishop Facility - Weak Formaldehyde

Recovery Unit USA - BISHOP TEXAS Detail Design

Hydrocracker Unit, Kherson Ukraine Basic Engineering Services

Hydrotreater Unit, Gdansk Poland Basic Engineering Services

Hydrotreater Unit, Fort Hills Oil Sands Canada Basic Engineering Services

Hydrotreater Unit, CPC RDS Taiwan Basic Engineering Services

LC Finner Unit, North West Canada Basic Engineering Services

Hydrocracker Unit, Nizhnekamsk Tatarstan Basic Engineering Services

Hydrocracker Unit, Engen South Africa Basic Engineering Services

DHC & MHC Hydrocracker Unit, Jubail Saudi Arabia Basic Engineering Services

Hydrocracker and Hydrotreater Unit, Tuape, Rosneft Russia Basic Engineering Services

LC Finner Unit, Caltex Korea Basic Engineering Services

Hydrocracker Unit, MOL Hungary Basic Engineering Services

Hydrocracker Unit and Hydrogen Plant, Komsomolsk Russia Basic Engineering Services

Isodewaxing Unit, Taneko Russia Basic Engineering Services

Hydrocracker Unit, Mazeikin Lithuania Basic Engineering Services

Ethylene Plant, Tianjin China Basic Engineering Services

Ethylene Plant, Zhenhai China Basic Engineering Services

FCC Unit, Paradip, INDMAX India Basic Engineering Services

FCC Unit, BRPL, INDMAX India Basic Engineering Services

CHEVRON LUMMUS GLOBAL

(CLG)

LUMMUS TECHONLOGY

MUSTANG ENGINEERING

REFERENCES LIST

Experience

17

PWE 07/12/2012

REFERENCES LIST

Client Project name Project location Scope

Jet Fuel Htdrotreating (Petromidia refinery) Romania Engineering & Design

Piping revamp in FCC unit (Petromidia refinery) Romania Engineering & Design

FCC cooling towers revamp (Petromidia refinery) Romania Engineering & Design

Hydrogen purification unit (Petromidia refinery) Romania Engineering & Design

Upgrading Loading and Transfer Capacity of

Petromidia 9 Berth (Petromidia refinery) Romania Engineering & Design

Gasoline Specification Improvement Project GSIP -

Izmir refinery Turkey Engineering & Design

Oxygenate Tanks, Loading and Transfer System Turkey Engineering & Design

SP1BIS PROJECT Algeria Engineering & Design

Leuna - MMA Project Germany Engineering & Design

Lavan FEED Project Iran Engineering & Design

BATEMAN KAZAKSTAN

PKKR -Kumkol South EOR Project - Hydrocarbon

Miscible Flood Kazakhstan Front End Engineering Design

ENERECO - Italy Pancevo Refinery Serbia Basic Engineering Services

SAINT GOBAIN - ISOVER Minearl Wool Unit Romania Engineering & Design

PENSPEN INTERNATIONAL

Vibration Study and Stress analysis for 14" Header to

H2S Strippers UAE

PETROSTAR IDO Flowstation Electrical & Instrumentaion Building Nigeria Engineering & Design

KNORR - UNILEVER Aeration Unit Romania Engineering & Design

Design of HP Flare KO Drum Vessels (Mechanical

Calculation & Shop Drawings Nigeria Engineering & Design

Design of Atmospheric KO Drum Vessel (Mechanical

Calculation & Shop Drawings Nigeria Engineering & Design

JACOBS France Pirelli Unit - Feasibility Study Romania

OMV - PETROM Stress analysis - Arpechim refinery Romania Engineering

ROMINSERV - ROMPETROL GROUP

ALCON Nigeria

TUPRAS

LITWIN FRANCE

Experience

18

PWE 07/12/2012

Software capabilities

GENERAL PROCESS ELECTRICAL CIVIL&STRUCTURAL INSTRUMENTATION MECHANICAL PIPING/STRESS CAD PROJECT CONTROL DATABASE REMOTE

Microsoft Windows HYSIS SKM PowerTools Foundation 3D SP Intrumentation (INTOOLS) Caesar II PDS Microsoft Project Oracle CITRIX

Microsoft Office PROII Groundmat DSAnchor InstruCalc FEPipe PDMS Primavera SQL

Microsoft Outlook HTRI ETAP Combined 3D PipePlus AutoCad

Microsoft Server AFT Impulse Visual Lighting MAT 3D PCC-Red Bag NozzlePro NavisWorks

ChemCAD AmpCalc Isogen Microstation

SP P&ID LitePro MathCAD

Calculux Descon Brace

Visual DesconWin

CEAG SAP2000

TraceCalc® Pro

CalcWare

19

PWE 07/12/2012

PW Engineering ROMANIA

Address: 1A Eroilor Square, Ploiesti, Prahova, RomaniaPhone: +40 344 148 004E-mail: [email protected]

Office locations & contacts

EN ISO 9001:2008

Certificate Reg. No 20 100

112006707

EN ISO 14001:2004

Certificate Reg. No 20 104

112006708

OHSAS 18001:2007

Certificate Reg. No 20 116

112006709

PW Engineering DUBAI

Address: P.O. Box 31291, Al Jazeera Al Hamra, Ras Al KhaimahPhone: +97 150 225 53 08E-mail: [email protected]

PW Engineering EUROPE

Address: Chemin des Couleuvres, 8B, 1297 Tannay, Switzerland

Phone: +41 22 960 7180E-mail: [email protected]

Web: www.pureworld-engineering.com

20

PWE 07/12/2012