PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 ADDENDUM NO. 4 INVITATION TO BID WASHINGTON COUNTY ADMINISTRATION COMPLEX: FIRST FLOOR RENOVATION CONTRACT NO.: AC-FFR-221-28 DATE: Thursday, September 4, 2014 BIDS DUE: Wednesday, September 10, 2014 2:00 P.M. (DST/Local Time) To Bidders: This Addendum is hereby made a part of the Contract Documents on which all bids will be based and is issued to correct and clarify the original documents. Please acknowledge receipt of this Addendum at the appropriate space on the Proposal Form. This Addendum consists of eight (8) pages and fourteen (14) attachments. NOTE: All bidders must enter the County Administration Building through the front door, 100 West Washington Street entrance, and must use the elevator to access the Purchasing Department to submit their bid. Alternate routes are now controlled by a door access system. SPECIFICATIONS ITEM NO. 4.01: SECTION 05520 – HANDRAILS AND RAILINGS; ADD Article 2.4 as follows; “2.4 STAINLESS STEEL RAILING SYSTEM COMPONENTS (Exterior) A. Pipe: Schedule 40 stainless steel pipe, Type 316. B. Rails and Posts: 1 1/2 inch diameter steel tubing; welded joints. C. Posts: 1 1/2 inch diameter steel tubing welded joints. D. Fittings: Elbows, T-shapes, wall brackets, escutcheons; machined steel suitable for flush welding. E. Mounting: Fixed brackets and flanges, with steel brackets for embedding in concrete. Prepare backing plate for mounting in wall construction. WWW.WASHCO-MD.NET 100 West Washington Street, Room 320 | Hagerstown, MD 21740-4748 | P: 240.313.2330 | F: 240.313.2331 | Hearing Impaired: 7-1-1

Transcript of PURCHASING DEPARTMENT DIVISION OF BUDGET &...

Page 1: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE

PUR-1261 ADDENDUM NO. 4

INVITATION TO BID WASHINGTON COUNTY ADMINISTRATION COMPLEX:

FIRST FLOOR RENOVATION CONTRACT NO.: AC-FFR-221-28

DATE: Thursday, September 4, 2014 BIDS DUE: Wednesday, September 10, 2014 2:00 P.M. (DST/Local Time) To Bidders:

This Addendum is hereby made a part of the Contract Documents on which all bids will be based and is issued to correct and clarify the original documents.

Please acknowledge receipt of this Addendum at the appropriate space on the Proposal Form. This Addendum consists of eight (8) pages and fourteen (14) attachments. NOTE: All bidders must enter the County Administration Building through the front door, 100 West Washington Street entrance, and must use the elevator to access the Purchasing Department to submit their bid. Alternate routes are now controlled by a door access system. SPECIFICATIONS ITEM NO. 4.01: SECTION 05520 – HANDRAILS AND RAILINGS; ADD Article 2.4 as

follows;

“2.4 STAINLESS STEEL RAILING SYSTEM COMPONENTS (Exterior)

A. Pipe: Schedule 40 stainless steel pipe, Type 316.

B. Rails and Posts: 1 1/2 inch diameter steel tubing; welded joints.

C. Posts: 1 1/2 inch diameter steel tubing welded joints.

D. Fittings: Elbows, T-shapes, wall brackets, escutcheons; machined steel suitable for flush welding.

E. Mounting: Fixed brackets and flanges, with steel brackets for embedding in concrete. Prepare backing plate for mounting in wall construction.

WWW.WASHCO-MD.NET

100 West Washington Street, Room 320 | Hagerstown, MD 21740-4748 | P: 240.313.2330 | F: 240.313.2331 | Hearing Impaired: 7-1-1

Page 2: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

F. Exposed Fasteners: Flush countersunk screws or bolts; consistent with design of railing.

G. Splice Connectors: Steel concealed spigots, welding collars.

H. Cable Rail: ASTM A492, Type 316 stainless steel cable, 3/16” diameter, 1x19 construction with stainless steel turnbuckles, terminals, and hardware as recommended by the manufacturer.”

ITEM NO. 4.02: SECTION 06651 – SOLID SURFACE FABRICATIONS; ADD this section

in its entirety. (Attachment No. 1 to this Addendum) ITEM NO. 4.03: SECTION 12498 – ROLLER SHADES; REVISE as follows; a. Article 1.1, Paragraph A; REVISE to read

“A. Section Includes: 1. Shade Type 1: Manually operated interior roller-screen solar shades as indicated in schedule at end of section.” b. Article 2.2, Paragraph B; DELETE this paragraph in its entirety. c. Article 2.3, Paragraph A; REVISE to read

“A. Fascia: 1. Continuous removable extruded aluminum fascia that

attaches to shade mounting brackets without the use of adhesives, magnetic strips, or exposed fasteners.

2. Fascia shall be able to be installed across two or more shade bands in one piece.

3. Fascia shall fully conceal brackets, shade roller and fabric on the tube.

4. Provide bracket / fascia end caps where mounting conditions expose outside of roller shade brackets.”

d. Article 3.6; ADD the following “A. Shade Type 1- All new first floor exterior curtainwall/

windows installed under this contract.”

ITEM NO. 4.04: SECTION 17150 – DATA, VOICE AND VIDEO SYSTEMS, Article 1.5; ADD Paragraph C as follows;

“C. A TE Connectivity (formerly Tyco Electronics) 25 Year Performance warranty can only be provided and certified by an authorized ND&I (NETWORKING Design and Installation contractor). The bidding contractor must provide proof they hold current ND&I status prior to the contract being awarded as a pre-qualification.” ITEM NO. 4.05: SECTION 17860 – ACCESS CONTROL SYSTEM, Article 1.7, Paragraph

3; ADD Item ‘f’ as follows; “f. Contractor shall be pre-qualified as a Genetec Certified Installer and must be able to make components work into a live system.”

Page 3: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

DRAWINGS ITEM NO. 4.06: DRAWING CS-2 – WALL TYPES, ABBREVIATIONS & DRAWING

INDEX; REVISE in accordance with attached Sketch SK-CS-2-1 dated 9/3/14 (Attachment No. 2 to this Addendum).

ITEM NO. 4.07: DRAWING A1.3 – ROOF PLAN; DELETE this sheet in its entirety and

REPLACE with Revised Sheet A1.3, dated 9/3/14 (Attachment No. 3 to this Addendum).

ITEM NO. 4.08: DRAWING A1.4 – ROOF DETAILS; REVISE as follows; a. DELETE all references to ‘EPDM’. The roof is a single ply

membrane as indicated in the specifications. b. Detail 13/A1.4; REVISE in accordance with Attached Sketch SK-

A1.4-1 dated 9/3/14 (Attachment No. 4 to this Addendum.) ITEM NO. 4.09: DRAWING A2.1 – ROOM FINISH SCHEDULE; REVISE as follows; a. Room 1512; REVISE Wall A to read “W2” and Wall B to read “W4”. b. Room 1513; REVISE Wall A to read “W2” and Wall D to read “W4”. ITEM NO. 4.10: DRAWING A6.1 – PART. PLANS & INTERIOR ELEVS.; DELETE this

sheet in its entirety and REPLACE with Revised Sheet A6.1, dated 9/3/14 (Attachment No. 5 to this Addendum).

ITEM NO. 4.11: DRAWING A6.2 – CASEWORK ELEVS & DETAILS; DELETE this

sheet in its entirety and REPLACE with Revised Sheet A6.2, dated 9/3/14 (Attachment No. 6 to this Addendum).

ITEM NO. 4.12: DRAWING E1.2 – FIRST FLOOR PLAN- GENERAL POWER; DELETE

this sheet in its entirety and REPLACE with Revised Sheet E1.2, dated 9/3/14 (Attachment No. 7 to this Addendum).

ITEM NO. 4.13: DRAWING E1.4 – FIRST FLOOR PLAN- POWER; DELETE this

sheet in its entirety and REPLACE with Revised Sheet E1.4, dated 9/3/14 (Attachment No. 8 to this Addendum).

ITEM NO. 4.14: DRAWING E2.1 – FIRST FLOOR PLAN- LIGHTING NEW WORK;

DELETE this sheet in its entirety and REPLACE with Revised Sheet E2.1, dated 9/3/14 (Attachment No. 9 to this Addendum).

Page 4: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

ITEM NO. 4.15: DRAWING E3.3 – SECOND FLOOR PLAN- FIRE ALARM; DELETE this sheet in its entirety and REPLACE with Revised Sheet E3.3, dated 9/3/14 (Attachment No. 10 to this Addendum).

ITEM NO. 4.16: DRAWING E4.1 – ELECTRICAL SCHEDULE, DETAILS & RISERS;

DELETE this sheet in its entirety and REPLACE with Revised Sheet E4.1, dated 9/3/14 (Attachment No. 11 to this Addendum).

ITEM NO. 4.17: DRAWING E4.2 – PANEL BOARDS; DELETE this sheet in its entirety and

REPLACE with Revised Sheet E4.2, dated 9/3/14 (Attachment No. 12 to this Addendum).

ITEM NO. 4.18: DRAWING TE1.2 – FIRST FLOOR PLAN- TELECOM; DELETE this

sheet in its entirety and REPLACE with Revised Sheet TE1.2, dated 9/3/14 (Attachment No. 13 to this Addendum).

ITEM NO. 4.19: DRAWING TE2.1 – FIRST FLOOR PLAN- SECURITY; DELETE this

sheet in its entirety and REPLACE with Revised Sheet TE2.1, dated 9/3/14 (Attachment No. 14 to this Addendum).

QUESTIONS: ITEM NO. 4.20: Inquiry: During a site visit I noticed above the drop ceiling in various

locations / floors, that sections of drywall covering the wooden floor joist is missing. Will the drywall be patched / replaced / installed to achieve the correct rating or should sprinkler protection be installed throughout above ceiling?

Response: Bidders shall include in their bid 1,000 sf of 1/2” gyp. bd. to be patched above the ceiling of the 3rd floor of 120 W. Washington St. Sprinkler heads shall be turned up to include the exposed wood structure above the ceiling on the 2nd floor east side of 120 W. Washington Street.

ITEM NO. 4.21: Inquiry: In Room #113 Comm. Mtg. Room, there is a raised platform. That room is to receive carpet tile. We need a drawing showing how to treat the step edge and riser. You can’t bend carpet tile over the step edge.

Response: The floor finish at the raised platform will be broadloom carpet in the same line as the specified carpet tile.

ITEM NO. 4.22: Inquiry: When may we expect a schedule for the Roller Shades 12498? The specification states (TBD).

Response: This has been addressed in this Addendum.

ITEM NO. 4.23: Inquiry: Are the steel columns at existing canopy and s.s. rail w/cable at existing retaining wall shown on south elevation A3.1 to be by separate contract?

Page 5: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

Response: The steel columns shall be 4” x 4” x 1/4” galv. tubes with a welded connection to the exiting steel canopy framing. The base shall set on the existing concrete retaining wall and anchored with four (4) 3/4” x 6” epoxy anchors, each column. Base plate and connection plate shall be 1/2” minimum. The stainless steel rail has been addressed in this Addendum.

ITEM NO. 4.24: Inquiry: The “Old Section” of the building, at the pre-bid walk thru, it was mentioned that areas to receive VCT and Carpet would need new ¼” underlayment. We need a spec for the desired underlayment.

Response: Areas scheduled to receive carpet or VCT on existing wood framed substrates shall be overlayed with 1/8” luan sheathing and prepared in accordance with the manufacturer’s installation instructions. Areas scheduled to receive ceramic/porcelain tile shall be prepared in accordance with Section 09310.

ITEM NO. 4.25: Inquiry: Specification 07540 Reinforced Single Ply Membrane

Roofing-Says the approved membrane system is a Sarnafil S327L Mechanically Fastened Roof System. Drawings show EPDM membrane. Please advise.

Response: This has been addressed in this Addendum. ITEM NO. 4.26: Inquiry: Roof plan A1.3 legend A refers to drawing A7.1/A7.2. Detail

A can’t be located on the drawings and drawings A7.1/7.2 aren’t included with the documents. Please clarify.

Response: This has been addressed in this Addendum. ITEM NO. 4.27: Inquiry: Roof plan A1.3 doesn’t show details 19, 20, 23, 41, 34A, &,

41 shown on drawing A1.4. Where do the details apply on roof plan drawing A1.3?

Response: These are shown as generic conditions which may be required if uncovered field conditions require modifications to the design of the roof system.

ITEM NO. 4.28: Inquiry: Detail 13/A1.5 new roof system shows 3” of insulation. Note

10 on drawing A1.5 states 4” and the specifications states 4”. Please clarify. Response: This has been addressed in this Addendum.

ITEM NO. 4.29: Inquiry: Detail 1/A1.5 isn’t shown on the roof plan A1.3. Where does

detail 1/A1.5 apply? Response: This has been addressed in this Addendum.

ITEM NO. 4.30: Inquiry: Specification 10170 – Toilet Partitions, Page 2, Paragraph 2.1

– Please provide information not detailed on drawings. Response: A color selection will be made from the manufacturer’s standard line of finishes. Acceptable manufacturers of HDPE partitions are Scranton Products, Global Partitions, and Hadrian Partitions.

Page 6: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

ITEM NO. 4.31: Inquiry: Identify the parking and dumpster locations for the GC and

sub-contractors. Response: Contractor parking/ staging area is indicated in Section 01500, Article 1.12.

ITEM NO. 4.32: Inquiry: Drawing A1.1 shows using wall type W-7 at exterior of room

number 1406. Wall schedule has no wall type W-7 please provide. Response: This has been addressed in this Addendum.

ITEM NO. 4.33: Inquiry: Are roller shades pockets to be located at each window?

Response: No. Fascias are required per this Addendum. ITEM NO. 4.34: Inquiry: At Alt for window glazing will there need to be window

pockets and shades? Response: No. The alternate is for curtainwall and glazing only.

ITEM NO. 4.35: Inquiry: The answer 3.36 in Addendum 3 is not sufficient. The

question was if the drawings would be provided pre-bid for use in bidding the project. Having them after the fact for the design and permit portion does not resolve trying to clarify what is existing to price the project. We should be provided an as built of the existing above ceiling conditions or you need to guarantee a minimum of 18” clear above ceiling to be assumed in our bid to make this work. It is not realistic to expect a subcontractor (or GC) to have to spend days with several people doing an above ceiling survey to determine the routes they need to take to make the system work and avoid existing conditions. This would be impossible to do with only (2) 1 hour walkthroughs of the project.

Response: CAD files of only the building plans have been developed. There are no Building Sections or Wall Sections available. Assume there is adequate clearance above the ceiling for installation of the sprinkler system. If field conditions do not permit installation, the sprinkler design will have to be modified accordingly.

ITEM NO. 4.36: Inquiry: The fact that you plan to occupy the spaces where we are to

run new sprinkler and fire alarm, much less the Alternate price which calls for the removal and reinstallation of the aluminum windows, it is not very realistic for these areas to remain occupied. Can you please define better how this coordination is to occur.

Response: Work will need to occur in the occupied spaces outside of normal business hours.

ITEM NO. 4.37: Inquiry: Considering that the majority of the ceilings in the occupied

areas look brand new, what percentage of ceiling tile should we figure replacing for the reinstallation of what we will have to demo to make this

Page 7: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

work occur. Will the fire marshall allow these spaces to remain occupied when we will likely be removing large areas of ceiling to perform this work?

Response: Assume that all of the ceiling tile will need to be replaced. ITEM NO. 4.38: Inquiry: Will the bid date on this project be extended. There is not

near enough time to properly evaluate this project to have it bid when scheduled. A minimum of two additional weeks would be required.

Response: There is no plan to extend the bid date at this time. ITEM NO. 4.39: Inquiry: Who will be relocating the existing free-standing safes that are

in the new space 1302A – Storage? Response: The free standing safes are to be removed & disposed of by the Contractor.

ITEM NO. 4.40: Inquiry: Please provide the existing terrazzo layout that is to remain so

we can figure which areas we need to fill. Most of these areas are presently covered up by carpet and can not be evaluated.

Response: The limits of the existing terrazzo according to our field survey are indicated on the demolition plan (D1.1) by note #16. Areas which need to be filled are represented by notes #3 and #17.

ITEM NO. 4.41: Inquiry: Are we to remove all the filler board and pour back at the first

floor level. Many places have been patched. If so, these areas need to be identified to determine quantities.

Response: Areas which need to be filled are represented by notes #3 and #17.

ITEM NO. 4.42: Inquiry: Is glycol also required in the chiller system, and if so, what

should we calculate for the amount in the existing building? Response: The existing chiller does not contain glycol.

ITEM NO. 4.43: Inquiry: Please provide the pocket schedule addressed in the Roller

Shade specification. We cannot determine which windows are to receive this condition.

Response: This has been addressed in this Addendum.

END OF ADDENDUM

Attachments: No. 1 – Section 06651- Solid Surface Fabrications No. 2 – Sketch SK-CS-2-1, dated 9/3/14 No. 3 – Revised Sheet A1.3, dated 9/3/14 No. 4 – Sketch SK-A1.4-1, dated 9/3/14 No. 5 – Revised Sheet A6.1, dated 9/3/14 No. 6 – Revised Sheet A6.2, dated 9/3/14 No. 7 – Revised Sheet E1.2, dated 9/3/14 No. 8 – Revised Sheet E1.4, dated 9/3/14

Page 8: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

No. 9 – Revised Sheet E2.1, dated 9/3/14 No. 10 – Revised Sheet E3.3, dated 9/3/14 No. 11 – Revised Sheet E4.1, dated 9/3/14 No. 12 – Revised Sheet E4.2, dated 9/3/14 No. 13 – Revised Sheet TE1.2, dated 9/3/14 No. 14 – Revised Sheet TE2.1, dated 9/3/14

By Authority of:

Karen R. Luther, CPPO Director of Purchasing BOARD OF COUNTY COMMISSIONERS OF WASHINGTON COUNTY, MARYLAND

Page 9: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

Wash. Co. Administration Complex SOLID SURFACE FABRICATIONS 06651-1 First Floor Renovations

SECTION 06651 - SOLID SURFACE FABRICATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the contract, including general and supplementary conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following horizontal and trim solid surface product types: 1. Lavatory tops with undermount bowls 2. Countertops

B. Related Sections include the following: 1. Section 06100 – Rough Carpentry 2. Section 15450- Plumbing Fixtures and Trim 3. Division 16- Electrical

W 1.3 DEFINITION

A. Solid surface is defined as nonporous, homogeneous material maintaining the same composition throughout the part with a composition of acrylic polymer, aluminum trihydrate filler and pigment.

1.4 SUBMITTALS

A. Product data: 1. For each type of product indicated.

B. Shop drawings: 1. Show location of each item, dimensioned plans and elevations, large-scale

details, attachment devices and other components. a. Show full-size details, edge details, thermoforming requirements,

attachments, etc. b. Show locations and sizes of furring, blocking, including concealed

blocking and reinforcement specified in other Sections. c. Show locations and sizes of cutouts and holes for plumbing fixtures,

faucets, soap dispensers, waste receptacle and other items installed in solid surface.

C. Samples:

1. For each type of product indicated. a. Submit minimum 6-inch by 6-inch sample in specified gloss.

b. Cut sample and seam together for representation of inconspicuous seam. c. Indicate full range of color and pattern variation.

2. Approved samples will be retained as a standard for work.

D. Product data: 1. Indicate product description, fabrication information and compliance with

specified performance requirements.

E. Fabricator/installer qualifications:

ahouse
Typewritten Text
Addendum No. 4 Attachment No. 1
Page 10: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

06651-2 SOLID SURFACE FABRICATIONS Wash. Co. Administration Complex First Floor Renovations

1. Provide copy of certification number.

F. Manufacturer certificates: 1. Signed by manufacturers certifying that they comply with requirements.

G. Maintenance data: 1. Submit manufacturer’s care and maintenance data, including repair and

cleaning instructions. a. Maintenance kit for finishes shall be submitted.

2. Include in project closeout documents.

1.5 QUALITY ASSURANCE

A. Qualifications: 1. Shop that employs skilled workers who custom fabricate products similar to

those required for this project and whose products have a record of successful in-service performance.

B. Fabricator/installer qualifications:

1. Work of this section shall be by a certified fabricator/installer, certified in writing by the manufacturer.

C. Applicable standards:

1. Standards of the following, as referenced herein: a. American National Standards Institute (ANSI) b. American Society for Testing and Materials (ASTM) c. National Electrical Manufacturers Association (NEMA)

2. Fire test response characteristics: a. Provide with the following Class A (Class I) surface burning

characteristics as determined by testing identical products per UL 723 (ASTM E84) or another testing and inspecting agency acceptable to authorities having jurisdiction: 1) Flame Spread Index: 25 or less. 2) Smoke Developed Index: 450 or less.

1.6 DELIVERY, STORAGE AND HANDLING

A. Deliver no components to project site until areas are ready for installation. B. Store components indoors prior to installation. C. Handle materials to prevent damage to finished surfaces.

1. Provide protective coverings to prevent physical damage or staining following installation for duration of project.

1.7 WARRANTY

A. Provide manufacturer’s warranty against defects in materials. 1. Warranty shall provide material and labor to repair or replace defective

materials. 2. Damage caused by physical or chemical abuse or damage from excessive heat

will not be warranted.

B. Optional Installed Warranty: 1. To qualify for the optional Installed Warranty, fabrication and installation must

Page 11: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

Wash. Co. Administration Complex SOLID SURFACE FABRICATIONS 06651-3 First Floor Renovations

be performed by a DuPont Certified Fabrication/Installation source who will provide a brand plate for the application.

2. This warranty covers all fabrication and installation performed by the

certified/approved source subject to the specific wording contained in the Installed Warranty Card.

C. Manufacturer’s warranty period:

1. Ten years from date of substantial completion.

1.8 MAINTENANCE

A. Provide maintenance requirements as specified by the manufacturer.

PART 2 PRODUCTS 2.1 MANUFACTURERS

A. Manufacturers: 1. Subject to compliance with requirements, provide products by one of the

following: a. DuPont Corian (basis of design). b. Wilsonart c. Formica

2.2 MATERIALS

A. Solid polymer components 1. Cast, nonporous, filled polymer, not coated, laminated or of composite

construction with through body colors meeting ANSI Z124.3 or ANSI Z124.6, having minimum physical and performance properties specified.

2. Superficial damage to a depth of 0.010 inch (.25 mm) shall be repairable by sanding and/or polishing.

B. Thickness: 1/2 inch C. Edge treatment:

1. No Drip

D. Backsplash: Applied- 4” Height x full width of counter E. Sidesplash: Applied- 4” Height x full depth of counter F. Performance Characteristics:

Property Typical Result Test Tensile Strength 6,000 psi ASTM D 638 Tensile Modulus 1.5 x 10-6 psi ASTM D 638 Tensile Elongation 0.4% min. ASTM D 638 Flexural Strength 10,000 psi ASTM D 790 Flexural Modulus 1.2 x 10-6 psi ASTM D 790 Hardness >85 Rockwell “M” Scale

ASTM D 785

Page 12: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

06651-4 SOLID SURFACE FABRICATIONS Wash. Co. Administration Complex First Floor Renovations

56 Barcol Impressor ASTM D 2583

Thermal Expansion 3.02 x 10-5 in./in./°C ASTM D 696 (1.80 x 10-5 in./in./°F)

Gloss (60° Gardner) 5–75 (matte—highly polished) ANSI Z124 Light Resistance (Xenon Arc) No effect NEMA LD 3-2000

Method 3.3 Wear and Cleanability Passes ANSI Z124.3 & Z124.6 Stain Resistance: Sheets Passes ANSI Z124.3 & Z124.6 Fungus and Bacteria Resistance Does not support microbial growth ASTM G21&G22 Boiling Water Resistance No visible change NEMA LD 3-2000 Method 3.5 High Temperature Resistance No change NEMA LD 3-2000

Method 3.6 Izod Impact 0.28 ft.-lbs./in. of notch ASTM D 256 (Notched Specimen) (Method A) Ball Impact No fracture—1⁄2 lb. ball: NEMA LD 3-2000 Resistance: Sheets 1⁄4" slab—36" drop Method 3.8

1⁄2" slab—144" drop Weatherability ∆E*94<5 in 1,000 hrs. ASTM G 155 Specific Gravity † 1.7 Water Absorption Long-term ASTM D 570

0.4% (3⁄4") 0.6% (1⁄2") 0.8% (1⁄4")

Toxicity 99 (solid colors) Pittsburgh Protocol 66 (patterned colors) Test (“LC50”Test)

Flammability All colors ASTM E 84, (Class I and Class A) NFPA 255 &

UL 723 Flame Spread Index <25 Smoke Developed Index <25 † Approximate weight per square foot: 1⁄4" (6 mm) 2.2 lbs., 1⁄2" (12.3 mm) 4.4 lbs. Shapes meet or exceed the ANSI Z124.3 and ANSI Z124.6 standards for plastic sinks and

lavatories. NEMA results based on the NEMA LD 3-2000 W 2.3 ACCESSORIES

A. Joint adhesive: 1. Manufacturer’s standard one- or two-part adhesive kit to create inconspicuous,

nonporous joints.

B. Sealant: 1. Manufacturer’s standard mildew-resistant, FDA-compliant, NSF 51-compliant

(food zone — any type), UL-listed silicone sealant in colors matching components.

C. Sink/lavatory mounting hardware:

1. Manufacturer’s standard bowl clips, panel inserts and fasteners for attachment of undermount sinks/lavatories.

D. Conductive tape:

1. Manufacturer’s standard aluminum foil tape, with required thickness, for use

Page 13: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

Wash. Co. Administration Complex SOLID SURFACE FABRICATIONS 06651-5 First Floor Renovations

with cutouts near heat sources.

E. Insulating felt tape: 1. Manufacturer’s standard for use with conductive tape in insulating solid surface

material from adjacent heat source.

2.4 FACTORY FABRICATION

A. Shop assembly 1. Fabricate components to greatest extent practical to sizes and shapes

indicated, in accordance with approved shop drawings and manufacturer’s printed instructions and technical bulletins.

2. Form joints between components using manufacturer’s standard joint adhesive without conspicuous joints.

a. Reinforce with strip of solid polymer material, 2" wide. 3. Provide factory cutouts for plumbing fittings and bath accessories as indicated

on the drawings. 4. Rout and finish component edges with clean, sharp returns.

a. Rout cutouts, radii and contours to template. b. Smooth edges. c. Repair or reject defective and inaccurate work.

W 2.5 FINISHES

A. As selected from the manufacturer’s standard color chart. B. Finish: Matte- Gloss range of 5-20

PART 3 EXECUTION 3.1 EXAMINATION

A. Examine substrates and conditions, with fabricator present for compliance with requirements for installation tolerances and other conditions affecting performance of work.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Install components plumb, level and rigid, scribed to adjacent finishes, in accordance with approved shop drawings and product data. 1. Provide product in the largest pieces available. 2. Form field joints using manufacturer’s recommended adhesive, with joints

inconspicuous in finished work. a. Exposed joints/seams shall not be allowed. 3. Reinforce field joints with solid surface strips extending a minimum of 1 inch

on either side of the seam with the strip being the same thickness as the top. 4. Cut and finish component edges with clean, sharp returns. 5. Rout radii and contours to template. 6. Anchor securely to base cabinets or other supports. 7. Align adjacent countertops and form seams to comply with manufacturer’s

written recommendations using adhesive in color to match countertop. 8. Carefully dress joints smooth, remove surface scratches and clean entire

Page 14: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

06651-6 SOLID SURFACE FABRICATIONS Wash. Co. Administration Complex First Floor Renovations

surface. 9. Install countertops with no more than 1/8-inch (3 mm) sag, bow or other

variation from a straight line.

B. Applied backsplashes and sidesplashes: 1. Install applied sidesplashes using manufacturer’s standard color-matched

silicone sealant. 2. Adhere applied sidesplashes to countertops using manufacturer’s standard

color-matched silicone sealant.

C. Integral sinks/counters: 1. Provide solid surface materials bowls and/or lavatories sinks with overflows in

locations shown on the drawings. 2. Secure sinks and lavatory bowls to tops using manufacturer’s recommended

sealant, adhesive and mounting hardware to maintain warranty. WRIT 3.3 REPAIR

A. Repair or replace damaged work which cannot be repaired to architect’s satisfaction.

3.4 CLEANING AND PROTECTION

A. Keep components clean during installation. B. Remove adhesives, sealants and other stains.

END OF SECTION

Page 15: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 2
Page 16: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 3
Page 17: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 4
Page 18: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM

D

C

B

A

D

C

B

A

C

B

A

D

C

A

C

B

A

B

C

A

ahouse
Typewritten Text
Addendum No. 4 Attachment No. 5
Page 19: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 6
Page 20: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 7
Page 21: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 8
Page 22: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 9
Page 23: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 10
Page 24: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 11
Page 25: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 12
Page 26: PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCEwashco-md.net/purchasing/pdf/PUR-1261/PUR-1261_add4.pdf · PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PUR-1261 . ADDENDUM
ahouse
Typewritten Text
Addendum No. 4 Attachment No. 13