Public Private Partnerships (PPP’s)……
Why BIM should be mandatory!!!
Andy Bradley
• Not just Scottish…. Glaswegian!
• 1 wife, 3 kids, no dog, no hair, no boat (yet)
• Still plays “real” football….
• First true love Celtic
• Australasia Health Leader
• Qld & NT Building Services & ESD Leader
• 20 years experience in delivery of major projects around the globe – over 50 procured via PPP
• Likes dressing up as a cowboy….
Arup | Who We Are
We are truly global. From 90 offices in 35 countries, our 10,000 planners, designers, engineers and consultants deliver projects with creativity and passion.
Beijing National Swimming Centre
AIA & Be Awards 2005
Marina Bay Sands
BIM Process Innovation Award 2010
AAMI Stadium Melbourne
BIM Process Innovation Award 2008
Marina Bay Bridge Singapore
Analysis & Design Award 2007
Sydney Opera House
BIM Process Innovation Award 2008
Botanical Gardens Stone Sculpture
Consult Australia
So, what is PPP……?
Public Private PartnershipPFI
Private
Finance
Initiative
P3s
PFI
Public Sector
+
Private Sector=
PFI
Fund
+
Design
+
Construct
+
Operate (25-60 years)
=
Current Market
2020 Market
$7.5 trillion
$71 trillion…
How big is this PPP thingy????
Who pays what……?
YOU!!!!!(Monthly rent)
What do you pay?
Operational
costs per month
Construction
costs per month
Traditional Govt
Procured Asset
PPP Procured
Asset
What’s the outcome?
• High Quality Facilities
• Well Maintained
Facilities
• Monthly Payments
• Slightly higher bills…
Why does it cost more?
• PPP Co has to price risk
• PPP Co has to make profit
• PPP Co has to deliver
benchmarked quality service
• Govt. probably didn’t spend
enough in first place….
All very interesting….
What has this to do
with BIM????
Is it just like love….????
Can BIM conquer all????
Erm, no….
But it can help deliver….
Cost Effective
Design,
Construction &
Operation
BIM can help…. • Improve design process
• Facilitate smart construction
• Reduce construction waste
• Reduce construction capital cost
• Provide a true asset register
• Facilitate real Planned
Preventative Maintenance
(PPM)
• Reduce operational costs
REDUCE OUR MONTHLY BILLS!!!!
• Site coordination time reduced
• Design changes reduced
• Site installation time reduced
• Energy efficiency guaranteed
Traditional Design Process Design for Prefabrication - BIM
• Installation risk reduced
• Designer time increased
• Site Waste reduced
• Construction emissions
reduced
Concept Design10%
Scheme Design15%
Design Development25%
Contract Documentation
15%
Construction35%
Column1
Concept Design15%
Scheme Design20%
Design Development
35%
Contract Documentation
20%
Construction10%
Column1Design
Design
BIM functions
• Costing - BoQs
• Programming
• Equipment to have technical
information embedded
• Name and reference/asset
number
• Design info i.e. design flow
rates, heat outputs
• Full technical specification
Environmental
conditions for
monitoring
against
benchmarks
Design
Hong Kong International Airport
Design: Example
Mark Hawley | Project Director | Airport Authority Hong Kong
‘…. we see the midfield concourse as
the start of our, Airport Authority Hong Kong, BIM journey
into achieving FM & asset interaction ….’
Midfield Development Integrated Systems
Existing Infrastructure Modifications
Design Realised
Design Realised
Design Realised
Case Study – Queen Elizabeth, UK
• 1,300 beds
• PFI (PPP UK-Stylie)
• Very fast programme
• Very low Energy Target
• Very high Penalties….
Queen Elizabeth Hospital, Birmingham UK, 1300 Beds
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
• Steel Frame
• Unitised, High Performance Cladding System
• Riser Modules
• GRP Modules (Pods)
• Modular Plantrooms
• Integrated Modular Wall
• Flat Packed Theatres
• Modular Wiring
• Multi-Service Corridor Modules
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
Case Study – Queen Elizabeth, UK
The Result????
• More cost efficient building
• Plant area only 11% of gross building area
• Project handed over 6 months early
• Quality very high standard
• Early unitary payment…. Good profit
• Lower monthly costs!!!
• PPP – A Big Success Story!!!!!