A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning,...

download A Strategy for Consulting Engineers to   Develop Infrastructure Projects by using   Master Planning, Funding Institutions and   Public Private Partnerships (PPP’s)

of 18

Transcript of A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning,...

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    1/18

    GAMA

    2010

    AStrategyforConsultingEngineerstoAStrategyforConsultingEngineerstoDevelopInfrastructureProjectsbyusingDevelopInfrastructureProjectsbyusing

    MasterPlanning,FundingInstitutionsandMasterPlanning,FundingInstitutionsand

    MOMBASAGAMA2010MOMBASAGAMA2010

    PublicPrivatePartnerships(PPPs)PublicPrivatePartnerships(PPPs)

    JonathanCornishJonathanCornishKV3EngineersKV3Engineers

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    2/18

    GAMA

    2010

    ContentsContentsBackgroundBackground

    ProjectDevelopmentPhasesProjectDevelopmentPhases

    ResourcesRequiredResourcesRequired

    IdentifyingProjectsIdentifyingProjects

    FundingInstitutionsFundingInstitutions

    PublicPrivatePartnerships(PPPs)PublicPrivatePartnerships(PPPs)

    ConclusionConclusion

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    3/18

    GAMA

    2010

    BackgroundBackground

    Africaso ortunitAfricaso ortunit

    Infrastructureconstraint,14Infrastructureconstraint,14-- 50%valueofexportsare50%valueofexportsaretransportcostsversus8.6%forotherdevelopingtransportcostsversus8.6%forotherdevelopingcountriescountries

    PossiblecausesPossiblecauses-- governance,institutionalcapacity,governance,institutionalcapacity,funding,overrelianceondonororganisations,etc.funding,overrelianceondonororganisations,etc.

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    4/18

    GAMA

    2010

    EconomictransformationEconomictransformationandaccountabilityandaccountability

    EconomicGrowth5%EconomicGrowth5%

    ncome mprove ncome mprove

    Povertydownto51%fromPovertydownto51%from

    58%58%

    20democraciesversus3in20democraciesversus3inthe1980sthe1980s

    GrowthinDevelopmentGrowthinDevelopmentFundingInstitutions(DFIs)FundingInstitutions(DFIs)DBSAandDBSAandAfDBAfDB

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    5/18

    GAMA

    2010

    Backgroundcont.Backgroundcont.Withagrowingdemandinresources,bettergovernanceWithagrowingdemandinresources,bettergovernanceandfundin bein available:andfundin bein available:

    NosignificantprogresshasbeenmadeinregionalandinterNosignificantprogresshasbeenmadeinregionalandinterregionalcoregionalco--operationandinfrastructuredeliveryoperationandinfrastructuredelivery

    Projectsgenerallyhavenotbeenplanned,investigated,scoped,Projectsgenerallyhavenotbeenplanned,investigated,scoped,prioritised,bankablestudiesundertaken,fundingsecuredorprioritised,bankablestudiesundertaken,fundingsecuredor

    budgetedforbudgetedforTheresultisthatanumberofBankableprojectsdonotTheresultisthatanumberofBankableprojectsdonotgettotheprocurementphasewhichimpactsnegativelygettotheprocurementphasewhichimpactsnegativelyondownstreamconsultingengineers.ondownstreamconsultingengineers.

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    6/18

    GAMA

    2010

    OpportunityforConsultingEngineersOpportunityforConsultingEngineers

    Mi ratin u thevaluechaintoincludePro ectMi ratin u thevaluechaintoincludePro ect

    DevelopmentintotheirserviceofferingDevelopmentintotheirserviceofferingMarketdifferentiatorversuscommodityMarketdifferentiatorversuscommodity

    LeadingrolethroughMasterPlanning,FundingLeadingrolethroughMasterPlanning,Funding

    InstitutionsandPPPsInstitutionsandPPPs

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    7/18

    GAMA

    2010

    ProjectDevelopmentPhasesProjectDevelopmentPhasesPhase Title Description

    1 EnablingEnvironment Legislation,regulatory,capacity

    2 ProjectDefinition IDofoutputs,prioritisation,partners,planningandpre-feasibilitystudies

    3 ProjectFeasibility Organisational,administration,financialmodelling,economicstudies,technical,engineeringandenvironmentalstudies

    4 ProjectStructuring PPPoptions,projectfinance,legal,technicalandengineeringactivities

    5 TransactionSupport Projectfinancing,legal,technicalandprocurement

    6 Post-Support Monitoring,evaluation,refinancing

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    8/18

    GAMA

    2010

    ProjectDevelopmentSkillsProjectDevelopmentSkills

    En ineerin ,business/financial,strate ic,lateralthinkin En ineerin ,business/financial,strate ic,lateralthinkin

    andnetworkingandnetworkingProjectIntelligenceandknowledgeonDFIsandfundingProjectIntelligenceandknowledgeonDFIsandfundinginstitutionsinstitutions

    TargetsectornetworkingTargetsectornetworkingRecommendationRecommendation ProjectDevelopmentChampionandProjectDevelopmentChampionandmatrixstructurematrixstructure

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    9/18

    GAMA

    2010

    IdentifyingProjectsIdentifyingProjects

    Traditionall challen in andrisk to rivatesectorandTraditionall challen in andrisk to rivatesectorand

    DFIsDFIsMoneygoeswheremoneyknows,knowwhattheMoneygoeswheremoneyknows,knowwhatthefunderswantandwhatriskstheyareconcernedaboutfunderswantandwhatriskstheyareconcernedabout

    KeyRiskKeyRisk-- ProjectmustbepartofaMasterPlanProjectmustbepartofaMasterPlanMasterPlanDemonstratesMasterPlanDemonstrates-- Planning,investigation,Planning,investigation,prioritisation,scopingandevenbudgetinginsomeprioritisation,scopingandevenbudgetinginsomeinstances.instances.

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    10/18

    GAMA

    2010

    MasterPlanningMasterPlanning

    DefinitionDefinition-- MasterPlanningisdefinedastheprincipalstrategicMasterPlanningisdefinedastheprincipalstrategic

    instrumentguidingallfutureplanning,management,investment,instrumentguidingallfutureplanning,management,investment,developmentandimplementationdecisionsdevelopmentandimplementationdecisions

    MasterplanningisablueprintoffutureprojectsrequiringfurtherMasterplanningisablueprintoffutureprojectsrequiringfurtherdevelopmentdevelopment

    FundingforMasterPlanningisavailablefromvariousfundingFundingforMasterPlanningisavailablefromvariousfundingagenciesagencies

    RecommendationRecommendation UseMasterPlanningtoidentifyasolidproject,UseMasterPlanningtoidentifyasolidproject,thathaspoliticalbacking,arevenuestreamandbankabilitythathaspoliticalbacking,arevenuestreamandbankabilitypotential.potential.

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    11/18

    GAMA

    2010

    FundingInstitutionsFundingInstitutions-- TypesTypesMultilateralAgenciesMultilateralAgencies FundingFundingcomesfrommulti le overnmentsandcomesfrommulti le overnmentsand

    nonnon--governmentsourcesandisgovernmentsourcesandisdistributedtomanydifferentcountriesdistributedtomanydifferentcountries(WorldBank)(WorldBank)

    BilateralAgenciesBilateralAgencies GovernmentGovernment

    AgenciesinasinglecountrywhichAgenciesinasinglecountrywhich

    provideaidtodevelopingcountriesprovideaidtodevelopingcountries(DevelopmentBanksandExport(DevelopmentBanksandExportCreditAgencies)CreditAgencies)

    CommercialandInvestmentBanksCommercialandInvestmentBanksDrivenbycreditandROEDrivenbycreditandROE

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    12/18

    GAMA

    2010

    FundingInstitutionsFundingInstitutions RisksRisksProjectDevelopmentkeyrisks:ProjectDevelopmentkeyrisks:

    PoliticalriskPoliticalrisk PossibleadversegovernmentactionPossibleadversegovernmentaction

    egu a oryr s egu a oryr s a awsapp ya awsapp y

    EnvironmentalriskEnvironmentalrisk PossibleadverseenvironmentalconsequencesPossibleadverseenvironmentalconsequences

    ForeignExchangeriskForeignExchangerisk AreproceedsconvertibleandistherecurrencyavailableAreproceedsconvertibleandistherecurrencyavailable

    CreditriskCreditrisk CantheprojectservicedebtCantheprojectservicedebt

    SupplyriskSupplyrisk IfuncertainlongtermagreementsIfuncertainlongtermagreements

    MarketriskMarketrisk OffOff--takeagreementsorgovernmentguaranteestakeagreementsorgovernmentguarantees

    CompletionriskCompletionrisk TurnkeyprojectsTurnkeyprojects TechnologyriskTechnologyrisk ProvenbutcompetitiveProvenbutcompetitive

    OperationsandMaintenanceriskOperationsandMaintenancerisk Longtermrisk,operatorsandfundingarekeyLongtermrisk,operatorsandfundingarekey

    InfrastructureriskInfrastructurerisk Accesstoroads,rail,portsandpowergridsAccesstoroads,rail,portsandpowergrids

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    13/18

    GAMA

    2010

    FundingInstitutionsFundingInstitutions

    FundsrarelyrequestedbyengineeringconsultantsFundsrarelyrequestedbyengineeringconsultants

    AprojectthatformspartofaMasterPlan,satisfiesfundersriskAprojectthatformspartofaMasterPlan,satisfiesfundersriskrequirementsandismotivatedproperlyhasagoodchanceofbeingrequirementsandismotivatedproperlyhasagoodchanceofbeingfundedfunded

    RecommendationRecommendation-- Selectafewfundersthatoperateinyoursector,Selectafewfundersthatoperateinyoursector,

    aregeographicallycloseandposenolanguagebarriers.Networkingaregeographicallycloseandposenolanguagebarriers.Networkingandintelligencegatheringiskey.andintelligencegatheringiskey.

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    14/18

    GAMA

    2010

    PublicPrivatePartnerships(PPPs)PublicPrivatePartnerships(PPPs)

    DefinitionDefinition-- Thisisdefinedasa5Thisisdefinedasa5--30yearpartnershipcontractbetween30yearpartnershipcontractbetween governmentan t epr vatesector nper orm ngan nst tut ona unct ongovernmentan t epr vatesector nper orm ngan nst tut ona unct on

    wheresubstantialrisk,eitherfinancial,technicaloroperational,iswheresubstantialrisk,eitherfinancial,technicaloroperational,is

    transferredtothepartythatcanbestmanageit.transferredtothepartythatcanbestmanageit.

    ThePPPprojectprocesstypicallyfollowsthefollowingcycle:ThePPPprojectprocesstypicallyfollowsthefollowingcycle: InceptionInception GovernmentregisterstheprojectwithNationalTreasurysPPPunitGovernmentregisterstheprojectwithNationalTreasurysPPPunit

    FeasibilityStudyFeasibilityStudy GovernmentappointsprivatesectoradvisorstodoafeasibilitystudyonGovernmentappointsprivatesectoradvisorstodoafeasibilitystudyonthemostappropriatemechanismforprocuringtheprojectthemostappropriatemechanismforprocuringtheproject

    ProcurementProcurement IfthefeasibilitystudyshowsthataPPPisaviableoption,governmentinvitesIfthefeasibilitystudyshowsthataPPPisaviableoption,governmentinvitesthemarkettosubmitbidsfortheinfrastructureprojectthemarkettosubmitbidsfortheinfrastructureproject

    ImplementationImplementation TheprojectisimplementedonceasuitablebidderhasbeenchosenandaTheprojectisimplementedonceasuitablebidderhasbeenchosenandaPPPagreementsigned.PPPagreementsigned.

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    15/18

    GAMA

    2010

    PPPsPPPs

    Initiativeis rowin Initiativeis rowin SouthAfrica,SouthAfrica,Mozambi ue,Mozambi ue,

    Uganda,Kenya,ZambiaandNigeriaUganda,Kenya,ZambiaandNigeriaCanbedoneinmultiplesectorsCanbedoneinmultiplesectors-- hospitals,governmenthospitals,governmentbuildings,gameparkconcessions,railsystems,buildings,gameparkconcessions,railsystems,municipalbulkinfrastructureandfleetmanagementmunicipalbulkinfrastructureandfleetmanagement

    RobustframeworktodeliverlargeprojectsRobustframeworktodeliverlargeprojects

    PPPsarecomplex,expensiveandtimeconsumingtoPPPsarecomplex,expensiveandtimeconsumingtogettofinancialclosure,thusnotaneasywayout!!gettofinancialclosure,thusnotaneasywayout!!

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    16/18

    GAMA

    2010

    PPPsPPPs

    Traditionall mana ementconsultantsandauditin firmsTraditionall mana ementconsultantsandauditin firms

    haveoccupiedthisspacehaveoccupiedthisspaceHighfeesandchallengingworkcanbefoundinthisHighfeesandchallengingworkcanbefoundinthissectorsector

    ThereareopportunitiesforconsultingengineerstoskillThereareopportunitiesforconsultingengineerstoskillthemselvesandtakealeadingroleasTAs(TransactionthemselvesandtakealeadingroleasTAs(Transaction/TechnicalAdvisors)/TechnicalAdvisors)

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    17/18

    GAMA

    2010

    ConclusionConclusionInfrastructuredeliveryisslowandgovernmentsgenerallydon'thavetheInfrastructuredeliveryisslowandgovernmentsgenerallydon'thavetheskillsorcapacitytogetprojectstobankablelevelwhichimpactsnegativelyskillsorcapacitytogetprojectstobankablelevelwhichimpactsnegatively

    onour n us ryonour n us ry

    ConsultingengineersarewellpositionedtotakealeadingroleintheprojectConsultingengineersarewellpositionedtotakealeadingroleintheprojectdevelopmentsectorwithvariousvalueaddingstrategiesthatweretoucheddevelopmentsectorwithvariousvalueaddingstrategiesthatweretouchedon:on:

    DevelopingskillstooperateintheProjectDevelopmentsectorDevelopingskillstooperateintheProjectDevelopmentsector

    HowtoidentifylowriskprojectsusingmasterplanningHowtoidentifylowriskprojectsusingmasterplanning

    UnderstandingfundersandwhatisimportanttothemUnderstandingfundersandwhatisimportanttothem

    PPPframeworksasapossibledeliveryvehiclePPPframeworksasapossibledeliveryvehicle

    WiththeskillsthatConsultingEngineershave,moreprojectswillbeWiththeskillsthatConsultingEngineershave,moreprojectswillbeidentified,prioritised,bankablestudiesundertakenandfundingsecuredidentified,prioritised,bankablestudiesundertakenandfundingsecured

    whichwillaccelerateAfricasdevelopment.whichwillaccelerateAfricasdevelopment.

    MOMBASAGAMA2010MOMBASAGAMA2010

  • 7/30/2019 A Strategy for Consulting Engineers to Develop Infrastructure Projects by using Master Planning, Funding Institutions and Public Private Partnerships (PPPs)

    18/18

    GAMA

    2010

    ThankyouThankyou

    JonathanCornish,JonathanCornish,B.TechB.Tech.Eng(.Eng(IndInd),MBL),MBL

    TechnicalDirectorInternationalTechnicalDirectorInternational

    KV3Engineers,SouthAfricaKV3Engineers,SouthAfrica

    [email protected]@kv3.co.za

    MOMBASAGAMA2010MOMBASAGAMA2010