Public Meeting Boards I75 Connector Study Project Item Number: 7-249 County and Route: Jessamine and Madison, US27/I-75 Connector Study Project Description: Feasibility study of construction of US27/I-75 Connector Project Manager Contact information (Cabinet): Stuart Goodpaster, District 7, 859- 246-2355, [email protected] Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126, [email protected] Other contacts: Randy Turner, KYTC D7, 859-246-2355, [email protected] Approximate dates: November 20, 2007 Comments (number of people reached, effectiveness of the technique, what you would do differently, etc.): A total of 244 people signed in at the meeting, which was an open house format. The display boards were arranged around the room. The boards contained the following information: study background, existing conditions, environmental maps, and study area maps for public drawing of potential corridors.

Transcript of Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information...

Page 1: Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126,

Public Meeting Boards I75 Connector Study Project Item Number: 7-249 County and Route: Jessamine and Madison, US27/I-75 Connector Study Project Description: Feasibility study of construction of US27/I-75 Connector Project Manager Contact information (Cabinet): Stuart Goodpaster, District 7, 859-246-2355, [email protected] Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126, [email protected] Other contacts: Randy Turner, KYTC D7, 859-246-2355, [email protected] Approximate dates: November 20, 2007 Comments (number of people reached, effectiveness of the technique, what you would do differently, etc.): A total of 244 people signed in at the meeting, which was an open house format. The display boards were arranged around the room. The boards contained the following information: study background, existing conditions, environmental maps, and study area maps for public drawing of potential corridors.

Page 2: Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126,

WELCOME!

to the

US 27 to Interstate 75 Corridor Scoping Study

Open House Format

November 20, 2007

4:00 – 8:00 PM

Please Register

Page 3: Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126,

Open House Orientation

The Kentucky Transportation Cabinet needs your input on the US 27 to Interstate 75 Corridor Study.

Please Visit Each Station to Get Involved

• Station 1: Study Background Information

• Station 2: Existing Highway System Conditions

• Station 3: Existing Environmental Information

• Station 4: Input on Issues, Goals & Corridors

• Station 5: Written and Oral Recorded Comments

Page 4: Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126,

Study Purpose

Study Purpose:• To Examine the Need for and Feasibility of a New Corridor from

US 27 to I-75 in Jessamine, Fayette, and Madison Counties

The Study Will …

• Focus on Area Between US 27 to Interstate 75– No Corridor Extensions Beyond US 27 or Interstate 75.

• Analyze Alternative Corridors from 1,000 feet to 2,000 feet wide– Will Not Recommend a Final Roadway Alignment– Will Examine a No Build Option

• Determine Economic Feasibility– For Design, Right of Way, Utility, & Construction Phases

Page 5: Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126,

Study Area

Page 6: Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126,

Study Process / Schedule

Identify Issues and Establish Identify Issues and Establish Project Purpose and NeedProject Purpose and Need

Develop Alternative CorridorsDevelop Alternative Corridors

Evaluate Alternative CorridorsEvaluate Alternative Corridors

Recommend Alternative(s) Recommend Alternative(s) CorridorsCorridors

MonthsMonths00

33

66

99

12 12 -- 1515

WE ARE HERE

Publ

ic In

vol v

emen

tPu

bli c

Invo

l vem

ent

Page 7: Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126,

ST300

ST627

ST1678 ST3364

ST89

ST1939

ST1923

ST922

ST1156

ST595

ST1961

ST57

ST1194

ST954

ST977

ST1973

ST388

ST1966

ST1971

ST499

ST15

ST876

ST3371

ST1268

ST29

ST374

ST1681

ST1981

ST563

ST974

ST3248

ST1150

ST3370

ST1977

ST39

ST2004

ST590

ST4

ST1541

ST1960

ST3378

ST169

ST1969

ST1967

ST33

ST3055

ST1273 ST1295ST52

ST1355

ST1970

ST1985

ST1978

ST1617

ST2881

ST1886

ST1131

ST3377

ST78

ST152

ST1912ST3246

ST418

ST1962

ST1267

ST753

ST2888

ST1975

ST938

ST1972

ST859

ST1983

ST1980

ST1353

ST1425

ST1984

ST34

ST342

ST1976

ST3375

ST2113

ST3109

ST341 ST1963

ST1958

ST2328

ST1805

ST3247

ST3433

ST6171

ST1247

ST2865

ST2344

ST563

ST21

ST1247

ST39

ST3364

ST1927

ST3371

ST595

ST1876

ST1973

ST374

ST169

ST39

ST1268

ST169

ST1981

ST52

ST1958

£¤68

Truck NetworksTruck Networks

LEXINGTON

BEREA

RICHMOND

NICHOLASVILLE

WILMORE

£¤421

£¤25

£¤68

£¤27

£¤60

£¤421

£¤60

£¤27

£¤25

£¤27

§̈¦75

§̈¦75

§̈¦64

§̈¦75

§̈¦64

§̈¦75

§̈¦75²

0 5 102.5 Miles

LegendTRUCK ROUTES

Federal Designated Truck RouteState Designated Truck RouteCounty BoundaryCorporate Boundary

Source: KY Transportation Cabinet, KY Office of Geographic Information, KY Infrastructure Authority

LIMITATION OF LIABILITY: HDR, Inc. acknowledges the inherent limitations of GIS products.HDR, Inc. and the providers of the source data make NO WARRANTY ORREPRESENTATIONS OF ANY KIND, INCLUDING, BUT NOT LIMITED TO, THE WARRANTIESOF MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE, NOR ARE ANY SUCHWARRANTIES TO BE IMPLIED, WITH RESPECT TO THE PRODUCTS, FURNISHED HEREIN.

US 27 to I-75 Corridor Scoping StudyTruck Networks

Page 8: Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126,

ST300

ST627

ST1678 ST3364

ST89

ST1939

ST1923

ST922

ST1156

ST595

ST1961

ST57

ST1194

ST954

ST977

ST1973

ST388

ST1966

ST1971

ST499

ST15

ST876

ST3371

ST1268

ST29

ST374

ST1681

ST1981

ST563

ST974

ST3248

ST1150

ST3370

ST1977

ST2004

ST590

ST4

ST1541

ST1960

ST3378

ST169

ST1969

ST1967

ST33

ST3055

ST1273 ST1295ST52

ST1355

ST1970

ST1985

ST1978

ST1617

ST2881

ST1886

ST1131

ST3377

ST78

ST152

ST1912ST3246

ST418

ST1962

ST1267

ST753

ST2888

ST1975

ST938

ST1972

ST859

ST1983

ST1980

ST1353

ST1425

ST1984

ST34

ST342

ST1976

ST3375

ST2113

ST3109

ST341 ST1963

ST1958

ST2328

ST1805

ST3247

ST6171

ST1247

ST2865

ST2344

ST563

ST21

ST1247

ST39

ST3364

ST1927

ST3371

ST595

ST1876

ST1973

ST374

ST39

ST1268

ST169

ST1981

ST52

ST1958

800

200

600

700

900

600

400

600

100

500

100

900

700600

3100

3100

3600

6300

57004500

18001000

1400

4400

1500

6500

1500

2200

3300

3600

1200

25001300

53100

65400

65900

53700

391004160034300

44800

37300

2660010300

31900

5530037100

19200

12800

100

400

900100

2800

2500

62200

13800

30600

£¤68

LEXINGTON

BEREA

RICHMOND

NICHOLASVILLE

WILMORE

£¤421

£¤25

£¤68

£¤27

£¤60

£¤421

£¤60

£¤27

£¤25

£¤27

§̈¦75

§̈¦75

§̈¦64

§̈¦75

§̈¦64

§̈¦75

§̈¦75²

0 5 102.5 Miles

Source: KY Transportation Cabinet, KY Office of Geographic Information, KY Infrastructure Authority

LIMITATION OF LIABILITY: HDR, Inc. acknowledges the inherent limitations of GIS products.HDR, Inc. and the providers of the source data make NO WARRANTY ORREPRESENTATIONS OF ANY KIND, INCLUDING, BUT NOT LIMITED TO, THE WARRANTIESOF MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE, NOR ARE ANY SUCHWARRANTIES TO BE IMPLIED, WITH RESPECT TO THE PRODUCTS, FURNISHED HEREIN.

Legend2007 Average Daily TrafficInterstateUS HWYState RouteState RouteCounty BoundaryCorporate Boundary

ST1268

4500

3400

1300

38700

27700

2180016400

11400

10300

3800

7600

2670025000

20200

24600

Nicholasville

The 2007 Average Daily Traffic (ADT) is based on the most recent actual counts provided by the KYTC; where possible, 2007 actual counts were used. ADTs not collected in 2007 were factored usinghistorical growth rates for the count station.

See Detail Map

Detail Map

US 27 to I-75 Corridor Scoping Study2007 Traffic Volumes

US 27 to I-75 Corridor Scoping Study

Page 9: Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126,

ST300

ST627

ST1678 ST3364

ST89

ST1939

ST1923

ST922

ST1156

ST595

ST1961

ST57

ST1194

ST954

ST977

ST1973

ST388

ST1966

ST1971

ST499

ST15

ST876

ST3371

ST1268

ST29

ST374

ST1681

ST1981

ST563

ST974

ST3248

ST1150

ST3370

ST1977

ST2004

ST590

ST4

ST1541

ST1960

ST3378

ST169

ST1969

ST1967

ST33

ST3055

ST1273 ST1295ST52

ST1355

ST1970

ST1985

ST1978

ST1617

ST2881

ST1886

ST1131

ST3377

ST78

ST152

ST1912ST3246

ST418

ST1962

ST1267

ST753

ST2888

ST1975

ST938

ST1972

ST859

ST1983

ST1980

ST1353

ST1425

ST1984

ST34

ST342

ST1976

ST3375

ST2113

ST3109

ST341 ST1963

ST1958

ST2328

ST1805

ST3247

ST6171

ST1247

ST2865

ST2344

ST563

ST21

ST1247

ST39

ST3364

ST1927

ST3371

ST595

ST1876

ST1973

ST374

ST39

ST1268

ST169

ST1981

ST52

ST1958

£¤68

LEXINGTON

BEREA

RICHMOND

NICHOLASVILLE

WILMORE

£¤421

£¤25

£¤68

£¤27

£¤60

£¤421

£¤60

£¤27

£¤25

£¤27

§̈¦75

§̈¦75

§̈¦64

§̈¦75

§̈¦64

§̈¦75

§̈¦75²

0 5 102.5 Miles

LegendLOS A-CLOS DLOS ELOS FLOS Cannot Be CalculatedInterstateUS HWYState RouteState RouteCounty BoundaryCorporate Boundary

Source: KY Transportation Cabinet, KY Office of Geographic Information, KY Infrastructure Authority

LIMITATION OF LIABILITY: HDR, Inc. acknowledges the inherent limitations of GIS products.HDR, Inc. and the providers of the source data make NO WARRANTY ORREPRESENTATIONS OF ANY KIND, INCLUDING, BUT NOT LIMITED TO, THE WARRANTIESOF MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE, NOR ARE ANY SUCHWARRANTIES TO BE IMPLIED, WITH RESPECT TO THE PRODUCTS, FURNISHED HEREIN.

US 27 to I-75 Corridor Scoping Study2007 Level of Service

Page 10: Public Meeting Boards I75 Connector Study · 2018-05-04 · Project Manager Contact Information (Consultant): Shawn Dikes with PB Americas, Inc. (Louisville office) 502-456-2126,

ST300

ST627

ST1678 ST3364

ST89

ST1939

ST1923

ST922

ST1156

ST595

ST1961

ST57

ST1194

ST954

ST977

ST1973

ST388

ST1966

ST1971

ST499

ST15

ST876

ST3371

ST1268

ST29

ST374

ST1681

ST1981

ST563

ST974

ST3248

ST1150

ST3370

ST1977

ST2004

ST590

ST4

ST1541

ST1960

ST3378

ST169

ST1969

ST1967

ST33

ST3055

ST1273 ST1295ST52

ST1355

ST1970

ST1985

ST1978

ST1617

ST2881

ST1886

ST1131

ST3377

ST78

ST152

ST1912ST3246

ST418

ST1962

ST1267

ST753

ST2888

ST1975

ST938

ST1972

ST859

ST1983

ST1980

ST1353

ST1425

ST1984

ST34

ST342

ST1976

ST3375

ST2113

ST3109

ST341 ST1963

ST1958

ST2328

ST1805

ST3247

ST6171

ST1247

ST2865

ST2344

ST563

ST21

ST1247

ST39

ST3364

ST1927

ST3371

ST595

ST1876

ST1973

ST374

ST39

ST1268

ST169

ST1981

ST52

ST1958

£¤68

LEXINGTON

BEREA

RICHMOND

NICHOLASVILLE

WILMORE

£¤421

£¤25

£¤68

£¤27

£¤60

£¤421

£¤60

£¤27

£¤25

£¤27

§̈¦75

§̈¦75

§̈¦64

§̈¦75

§̈¦64

§̈¦75

§̈¦75²

0 5 102.5 Miles

Source: KY Transportation Cabinet, KY Office of Geographic Information, KY Infrastructure Authority

LIMITATION OF LIABILITY: HDR, Inc. acknowledges the inherent limitations of GIS products.HDR, Inc. and the providers of the source data make NO WARRANTY ORREPRESENTATIONS OF ANY KIND, INCLUDING, BUT NOT LIMITED TO, THE WARRANTIESOF MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE, NOR ARE ANY SUCHWARRANTIES TO BE IMPLIED, WITH RESPECT TO THE PRODUCTS, FURNISHED HEREIN.

LegendCrash Rate Below Average for Road TypeCrash Rate Exceeds Average for Road TypeCrash Rate Exceeds Critical Crash Rate for Road TypeInterstateUS HWYState RouteCounty BoundaryCorporate Boundary

US 27 to I-75 Corridor Scoping StudyCrash Rates by Segments