Proposed Transition Phases and Groupings
-
Upload
sarah-dejesus -
Category
Documents
-
view
19 -
download
0
description
Transcript of Proposed Transition Phases and Groupings
© 2012 IBM CorporationOSLC Steering Committee private
OSLC Member Section
Scope Draft Converge Final
Core 3.0
Change Management 3.0
Configuration Management
Requirements Management 3.0
Asset Management 3.0
Quality Management 3.0
Architecture Management 3.0
Estimation and Measurement
PLM/ALM
Automation 3.0
Performance Monitoring 3.0
Resource Reconciliation 3.0
Event Monitoring 3.0
Change and Configuration Management TC
Quality and Automation Management TC
Linked Data Platform WG
Technical Architecture TC
Project and Portfolio Management TC
Requirements and Architecture Mgnt TC
Integrated Service Management TC (DMTF?)
1a
1b
0
2a
2b
2c
3
4
Once Member Section is created and Core is transitioned, domains transition independently
Domain Specific / Other Standards Body 5
1
Proposed Transition Phases and Groupings