Proposed SWG-LIR Work Proposed SWG-LIR Work Plan Plan 2012-2013 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012, 2:00 p.m.

Transcript of Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for...

Page 1: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Proposed SWG-LIR Work PlanProposed SWG-LIR Work Plan2012-2013 2012-2013

Mr. Thomas RojasCo-Convener, SWG-LIR

1st WG-GIC Meeting for 2012Audio Visual Room, BOI Penthouse

30 March 2012, 2:00 p.m.

 

 

Page 2: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

OUTLINEOUTLINEBackground

- PDP Chapter 3 - Business Sector Memo to the President

- Arangkada Philippines 2010- WG-GIC Workshops > Sector Writeshop > Planning Workshop

Proposed SWG-LIR Work Plan for 2012-2013

Meeting of PDF Secretariats of WG-DLG and WG-GIC

Page 3: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

BackgroundBackground2011-2016 Philippine Development Plan (PDP) signed by

President Aquino in March 2011; formally released to the public in May 2011

2011-2016 PDP Chapter 3: Competitive Industry and Services Sectors Strategic Goals:

- Improved business environment- Increased productivity and efficiency- Enhanced Consumer Welfare

Page 4: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

BackgroundBackground

Business Sector Memo to the President

Arangkada Philippines 2010

Sector Writeshop on Assessing Competitiveness Issues, 03 June 2011

WG-GIC Planning Workshop, 28 July 2011

Page 5: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Proposed SWG-LIR Work Plan Proposed SWG-LIR Work Plan for 2012-2013for 2012-2013

Four (4) Themes/Areas of Concern

Streamlining local and national regulatory processes

Promoting local economic strategies conducive to investment

Improving information support for business matching and investment promotion

Addressing consumer-related issues

Page 6: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Theme 1: Streamlining Local and Theme 1: Streamlining Local and National Regulatory ProcessesNational Regulatory Processes

Roll out standards on BPLS to targeted LGUs - Capacity building and coaching support provided

to expanded target LGUs - BPLS advocacy and marketing program developed - Improved online BPLS support (e.g. Help

Desk and Helpline - Monitor compliance of LGUs to standards under

BPLS streamlining - Certification system of BPLS coaches - Implement robust M&E system

Page 7: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Theme 1: Streamlining Local and National Theme 1: Streamlining Local and National Regulatory ProcessesRegulatory Processes

Support the expansion of the Philippine Business Registry (PBR)

Assist LGUs in BPLS automation (component 2 of BPLS Streamlining Program) for interconnectivity with the PBR- Knowledge products on BPLS

automation (e.g. toolkits, training materials)

- Survey on e-readiness/BPLS automation

- Deployment of e- BPLS system/software and capacity building to target LGUs

Page 8: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Theme 1: Streamlining Local and National Regulatory Theme 1: Streamlining Local and National Regulatory ProcessesProcesses

Set up an Incentive system for BPLS reformed LGUs

- Outbound and inbound investment/trade missions

- Business-friendly LGUs

Assist LGUs in reforming inspection system - Distribute knowledge products in setting

up business-friendly local inspection system (toolkits, training materials) - Conduct training/capacity building

Page 9: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Theme 1: Streamlining Local and National Regulatory Theme 1: Streamlining Local and National Regulatory ProcessesProcesses

Formulate reforms in securing construction permits- Creation of a Technical Working Group

(TWG)/MOA between DPWH, DILG and DTI- Recommendations on the streamlining of

construction permits- Knowledge products in streamlining the

construction permitting system (e.g. toolkits, training materials)

- Capacity building to LGUs on reforming construction permitting system

Page 10: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Theme 1: Streamlining Local and National Regulatory Theme 1: Streamlining Local and National Regulatory ProcessesProcesses

Undertake Regulatory Impact Assessment (RIA) - Implement recommendations of the ADB Study on

RIA

Review and formulate reforms in land titling- Undertake study- Knowledge products- Capacity building

Expand the use of the Business One-Stop-shops (BOSS)- Assess BOSS experiences- Implement recommendations to further enhance the

current BOSS procedures

Page 11: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Theme 2: Promoting Local Theme 2: Promoting Local Economic Economic Strategies for Strategies for InvestmentInvestment

Review national laws and local regulations - Ensure consistency in incentive-giving

laws with local tax code and Local Investment and Incentives Code (LIIC)

- Review special permits for tourism and agribusiness required by LGUs

Pursue Alternative Dispute Resolution (ADR) to settle disputes between national and local agencies as alternative to filing cases/going to courts- Develop ADR mechanism per sector

Page 12: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Theme 2: Promoting Local Economic Theme 2: Promoting Local Economic Strategies Strategies for Investmentfor Investment

Strengthen the newly-created Local Economic and Investment Promotion Offices (LEIPOs)- Develop template knowledge

products and training materials to capacitate LEIPOs

- Establish the institutional linkages among regional office of NGAs like DTI, DILG, NEDA and LEIPOs

Page 13: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Encourage LGUs to participate in PPP and other modalities for local infrastructure development

- Roll out revised PPP/BOT manual for local governments and key cities to support rapid implementation of infrastructure projects in support of priority sectors e.g., tourism, agribusiness- Improve farm-to-market roads, postharvest facilities

Theme 2: Promoting Local Economic Strategies for Investment

Page 14: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Implement programs to assist MSMEs - Microfinance

- Microinsurance

Strengthen LGUs’ agricultural extension and training services for farmers

Theme 2: Promoting Local Economic Strategies for Investment

Page 15: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Theme 3: Improving Information Support Theme 3: Improving Information Support for Business Matching and for Business Matching and Investment Promotion Investment Promotion

Assist LGUs in generating information for promoting investments

- Use of LGU business registration information for business matching

- Methodology for quick area-based information/statistics, proxy statistics to measure provincial GDP/ to gauge local economic activity

- Develop with business groups framework for regular private sector (e.g. local chambers and LGU interaction to discuss issues and plans on investment-related projects)

Page 16: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,

Theme 4: Address Theme 4: Address Consumer- Related Consumer- Related Issues Issues

Strengthen standard setting (harmonized with international standards) and implementation at the local level- Scoping exercise- Review standards for tourism facilities

(initial focus on transport and hotels)Undertake case studies for Palawan

and Bohol

Page 17: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,