Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
Projects Overview
Volker Mertens, CERN, 10. 7. 2001
Outline:
LTI + CNGS overviews (schematic)
Beam parameters + machine cycles
Planning / installation + (LTI) commissioning phases
Layouts + optics (incl. warm line for LHC sector test)
Main challenges
Instead of a summary ...
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
= excavated
http://proj-cngs.web.cern.ch/proj-cngs/05/2005
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
CNGS flight path, main components @ CERN
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
TT41 optics
target
05/2005
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
SPS cycles (interleaved with slow extr. or LHC filling)
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
2001 2002 2003 2004 2005
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
http://proj-lti.web.cern.ch/proj-lti/
• combined length 5.6 km
• over 700 room-temperature magnets (74 recup’d)
04/2006
04/2004
TI 2
TI 8
TI 2 / TI 8 overall layout, milestones
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
Machine cycles, bunch structure, filling pattern
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
Beam parameters
Momentum GeV/c 450 400
Emittance norm’d m rad 3.5 12
Bunch intensity nom (ult) 1011 p 1.1 (1.7) 0.115 (0.167)
Cycle intensity nom (ult) 1013 p 2.4 (4.9) 4.8 (7)
Bunch spacing ns 25 5
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
2001 2002 2003 2004 2005 2006
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
Gen. appr.: installation + commissioning in 3 phases
1. SPS extraction / TT40 (up to TED400353)
2. Transfer line TI 8 (up to TED87765)
3. LHC injection (up to TDI (no, up to IP 8 !))
disentangle work + pot. problems; build upon previous experience
as from 04/2004
late 2003
early 2003
debug full-size installationset up trajectory correctioncheck behaviour of line (time-dependent effects ?)measure optical characteristicstest new software (basic debugged ingredients of definitive system)
test extraction equipmenttest extraction performance / check for SPS errors (p-to-p repr., drifts ?)testbed for bulk equipment control (MS, PO, BI, VAC, …)testbed for new software (could still do with temporary solutions)
set up injection equipment
learn to work with new software (seamless link with LHC BI,
preparation for integration with LHC first turns (inj. osc., orbit FB, ...)access + safety systems fully functionalinterlocks primordial (at least at higher intensities)
http://cern.web.cern.ch/CERN/Divisions/SL/publications/chamx2001/PAPERS/6-6-vm.pdf
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
SPS (new fast) east extraction TI 8 + CNGS
0
40
80
120
3969 3985 4001 4017 4033 4049 4065S (m)
x (
mm
)
MSE1-6MKE 1-5 TPSG
early 2003
1
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
access gallery
TT40
TT41
TI 8
ECA4
SPS
TT40
STOP
TEDchicane
early 2003
link tunnel (TA42)
access gallery to neutrino target area (TA41)
1
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001s(m)
D(m
)
Transfer line TI 8
TED
2
late 2003
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
LHC injection layout (schematic)
TCDD
3
as from 04/2004
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
Provisions for sector test (temporary warm line)
• « replace LHC » between MKI and IP8 by warm line
• install injection elements definitively
• reproduce geometry (replace D1 and D2 by small bends)
• match to TI 8 and arc optics
• use TI 2 material (magnets, supplies, vacuum, …)
• locate supplies in UA87• definitive vacuum ch. ?
STOP
arc
TI 8
D1’ D2’
Q
courtesy: A. Verdier
IP8
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
Aperture of main dipoles in TI 8 (1:1 view)
Tz, tz ...
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
Aperture of main dipoles in TI 8 (enlarged view)
25 mm
chamber thickness
tolerances + errors
beam sizebeam size + dispersionbeam size + dispersion + trajectory error
- over ~ 1.5 km of dipoles (+ quadrupoles)
- if BPM / corrector system works well
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
TI 2 + TI 8 + TT41 1 new SPS (w/o RF, all usual ingredients + their controls)
Beam parameters (energy, intensity, emittance)
Apertures ( good observation, trajectory correction, interlocks)
Required delivery precisions (on CNGS target, on LHC orbit) +
Efficiency (LHC injection good observation, feedbacks ?)
High demands on (early) operational availability + throughput
Operational rigour (“fine-tuning” settings, bypassing interlocks, skipping a step in a sequence: know well what you’re doing, follow the checklists !)
Control system + BI need to be ready early (conc. on understanding TL + LHC)
Access system + interlocks must be capable to handle varying conditions safely and efficiently (multi-cycling, instant access)
Logistics (amount of material, manpower sharing, time/access sharing)
No cutting-edge technology
No problems from multi-pass
Main challenges
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
What should this review achieve ?- Identify the systems that will be needed to control LTI and CNGS equipment - Examine the interfaces between these systems and the SPS and LHC accelerator controls - Identify areas where new initiatives are required
- Clarify controls responsibilities and milestones at all levels Clarify basic HW questions:- Location of electronics- Type + number of front ends- Network connections- Cables (to order + find space for)- ...
Define who does what and when:- Decision on the approach- Software writing- Coordination + follow-up
Instead of a summary ...
And, finally, if I could wish (or recommend) something:
Think about lifespan of operation (15 yrs ?)
Please no last minute rush - if you can avoid it.
Sector test is good test bed for LHC and new SW - try to make best use of it.
Projects Overview / V. Mertens / LTI and CNGS Controls Review / 10. 7. 2001
Reminds me of a “bottle”-neck we once had in LEP…