Projects Moniruzzaman Moni, MASc. Unit: 406, 120 McIntosh Road, V1X7E8 Email: [email protected] Kelowna, British Columbia, Canada. Cellular: 2503005033 Project summary: Design Engineer Public Works Department Dhaka, Bangladesh June 2011 – July 2015 For this organization I have designed near about 50 reinforced concrete Buildings. A very few of them are given below: Project title: “Construction of 15 storied plus single basement Reinforced Concrete Building for 500 Bed Gazipur Sadar Hospital, Gazipur, Bangladesh” Responsibilities: Preliminary design to support the architect. Cost estimation and preparation of bill of quantity Wind load calculation as per ASCE 7-05 using finite element software ETABS. Seismic analysis of this building as per IBC 2003 using finite element software ETABS. Technical notes for this building. Design of 1400mm thick Mat Foundation by using finite element software SAFE. Design of superstructure (Column, beam and slab). Check for joint shear and strong column weak beam. Supervise cad technologists to prepare the working drawing and submitted to the supervisor. Project title: “Construction of 14 storied plus double basement Reinforced Concrete Building for National Institute of Laboratory Medicine, Sher E Baglanagar, Dhaka, Bangladesh” Responsibilities: Preliminary design to support the architect. Cost estimation and prepare bill of quantity. Design of precast test pile. Supervise pile load test. Wind Load calculation as per ASCE 7-05 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Technical specification for this building. Design of Mat Foundation with pile caps. Design of superstructure (Ramp, Column, beam and slab). Check for joint shear and strong column weak beam. Supervise cad technologists to prepare the working drawing and submitted to the supervisor. Project title: “Seismic assessment and retrofitting design of 6 storied reinforced garments Factory Building, Dhaka, Bangladesh” Responsibilities: Prepare as built architectural drawing and structural drawing. Perform non destructive ultra sonic pulse velocity test to get information about the concrete. Perform destructive test (core test). Perform carbonation test. Seismic assessment of the building by using spread sheet. Retrofitting design of the garment building including foundation, column jacketing, and shear wall by using spread sheet. Supervise to prepare the preliminary drawing. Project title: “Construction of 8 storied plus double basement Reinforced Concrete Building for Doctor Dormitory at BSMMU, Dhaka, Bangladesh” Responsibilities: Preliminary design to support the architect. Cost estimation and prepare bill of quantity.

description

project description

Transcript of Projects of Moniruzzaman.moni

Page 1: Projects of Moniruzzaman.moni

Projects

Moniruzzaman Moni, MASc. Unit: 406, 120 McIntosh Road, V1X7E8 Email: [email protected] Kelowna, British Columbia, Canada. Cellular: 2503005033

Project summary:

Design Engineer Public Works Department Dhaka, Bangladesh June 2011 – July 2015

For this organization I have designed near about 50 reinforced concrete Buildings. A very few of them are given below:

Project title: “Construction of 15 storied plus single basement Reinforced Concrete Building for 500 Bed Gazipur Sadar Hospital, Gazipur, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Cost estimation and preparation of bill of quantity Wind load calculation as per ASCE 7-05 using finite element software ETABS. Seismic analysis of this building as per IBC 2003 using finite element software ETABS. Technical notes for this building. Design of 1400mm thick Mat Foundation by using finite element software SAFE. Design of superstructure (Column, beam and slab). Check for joint shear and strong column weak beam. Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Project title: “Construction of 14 storied plus double basement Reinforced Concrete Building for National Institute of Laboratory Medicine, Sher E Baglanagar, Dhaka, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Cost estimation and prepare bill of quantity. Design of precast test pile. Supervise pile load test. Wind Load calculation as per ASCE 7-05 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Technical specification for this building. Design of Mat Foundation with pile caps. Design of superstructure (Ramp, Column, beam and slab). Check for joint shear and strong column weak beam. Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Project title: “Seismic assessment and retrofitting design of 6 storied reinforced garments Factory Building, Dhaka, Bangladesh”

Responsibilities: Prepare as built architectural drawing and structural drawing. Perform non destructive ultra sonic pulse velocity test to get information about the concrete. Perform destructive test (core test). Perform carbonation test. Seismic assessment of the building by using spread sheet. Retrofitting design of the garment building including foundation, column jacketing, and shear wall by using spread

sheet. Supervise to prepare the preliminary drawing.

Project title: “Construction of 8 storied plus double basement Reinforced Concrete Building for Doctor Dormitory at BSMMU, Dhaka, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Cost estimation and prepare bill of quantity.

Page 2: Projects of Moniruzzaman.moni

Page 2 of 6 Moniruzzaman Moni, MASc.

Wind Load calculation as per ASCE 7-05 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of 1050mm thick Mat Foundation. Design of superstructure (Ramp, Column, beam and slab). Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Project title: “Construction of 10 storied residential reinforced concrete building for Doctor Dormitory at Mohakhali, Dhaka, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of shallow foundation (isolated and combined). Design for soft-story Check for joint shear and strong column weak beam. Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Project title: “Construction of sheikh fazilatunnesa mujib Eye Hospital at Gopalganj, Dhaka, Bangladesh”

Responsibilities:

24 nos 6-storied reinforced concrete building has been designed in this project. Preliminary design to support the architect. Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of shallow foundation (isolated and combined). Design of super structure including column, beam, deck slab and floor slab Supervise cad technologists to prepare the working drawing and submitted to the supervisor. Supervise the site time to time and provide guideline when difficulties arise. Ensure quality control of the construction.

Project title: “Project for capacity development on natural disaster resistant techniques of construction and retrofitting for public building”

Responsibilities:

Worked as a team member of working team-2. Assist to write “Seismic Design Manual for new Building in Bangladesh”, “Seismic Assessment and Design Manual

for Existing Building in Bangladesh” with Japan International Cooperation Agency (JICA).

Project title: “Construction of 8 storied reinforced concrete hospital building funded by World Bank at Madaripur, Bangladesh”

Responsibilities: Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of joint precast pile foundation. Design of superstructure including column, beam and slab. Check for joint shear and strong column weak beam. Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Project title: “Construction of 8 storied reinforced concrete hospital building funded by World Bank at Madaripur, and Kurigram Bangladesh”

Responsibilities: Wind Load calculation as per ASCE 7-05 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of joint precast pile foundation. Design of superstructure including column, beam and slab. Check for joint shear and strong column weak beam. Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Page 3: Projects of Moniruzzaman.moni

Page 3 of 6 Moniruzzaman Moni, MASc.

Project title: “Construction of 6 nos 8 storied reinforced concrete hospital building at Naogan, Vola, Borguna, Hobiganj, Nilfamari, Tongi Bangladesh”

Responsibilities: Wind Load calculation as per UBC 1994/ASCE 7-05 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of different type’s foundation for different building depending on the soil investigation reports. Design of superstructure including column, beam and slab. Check for joint shear and strong column weak beam. Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

As a proprietor and principal structural design engineer of this company, I designed different types of structures including residential and commercial reinforced concrete buildings, steel buildings and heavy machine foundation, Analysis and design of self supported communication towers and poles and guyed masts as per BS 8100, EIA 222 F and TIA 222 G. I also reviewed geotechnical reports and design different types foundation for different types of structures and Performed seismic assessment and retrofitting design for reinforced concrete buildings. I have participated negotiation meeting with the clients to get projects as team leader as well as team members in different projects. Some of my notable jobs are described in below:

Project title: “Construction of 6 storied industrial steel building at Gazipur for Insignia Studio, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of shallow foundation, pedestal columns, grade beam, base plate and anchor bolts. Design of steel beam and column as well as beam column joints as per AISC LRFD 99. Supervise the cad technologists to prepare the tender drawing.

Project title: “Construction of 2 storied industrial steel building at Gazipur for hatim Industry, Bangladesh”

Responsibilities: Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of shallow foundation, pedestal columns, grade beam, base plate and anchor bolts. Design of steel beam, bracing and column as well as beam column joints as per AISC LRFD 99. Supervise the cad technologists to prepare the tender drawing.

Project title: “Construction of 2 storied Commercial steel building at Uattara Dhaka for Insignia Studio, Bangladesh”

Responsibilities: Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of shallow foundation, pedestal columns, grade beam, base plate and anchor bolts. Design of steel beam and column as well as beam column joints as per AISC LRFD 99. Supervise the cad technologists to prepare the tender drawing.

Project title: “Construction of 2 storied Commercial steel building at Uattara Dhaka for Insignia Studio, Bangladesh”

Responsibilities: Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of shallow foundation, pedestal columns, grade beam, base plate and anchor bolts. Design of steel beam and column as well as beam column joints as per AISC LRFD 99. Supervise the cad technologists to prepare the tender drawing.

Project title: “Construction of self supported communication steel tower for operator Grameenphone, ROBI, Teletalk and vendor Mizan Construction Company, Bangladesh”

Responsibilities:

Principal Structural Prudential Consultants Dhaka, Bangladesh August 2006 – July

Page 4: Projects of Moniruzzaman.moni

Page 4 of 6 Moniruzzaman Moni, MASc. Design of roof top (12m, 15m, 18m and 20m) and green field tower (25m, 32m, 37m, 41m, 42m, 52m, 62m) as per BS

8100, EIA 222 F and TIA 222 G. Design of base plate and holding down bolts. Preparation of line drawings. Preparation of design reports. Preparation of cost estimate Supervise the cad technologists to prepare the erection and fabrication drawing.

Project title: “Construction of braced communication pole for operator Grameenphone, ROBI, Teletalk and vendor Mizan Construction Company, Bangladesh”

Responsibilities: Design of roof top braced pole (6m, 9m, 12m) as per EIA 222 F and TIA 222 G. Design of base plate and holding down bolts. Preparation of line drawings. Preparation of design reports. Preparation of cost estimate Supervise the cad technologists to prepare the erection and fabrication drawing.

Project title: “Construction of guyed mast for operator ROBI, Teletalk and vendor Mizan Construction Company, Bangladesh”

Responsibilities: Design of guyed mast (25m, 35m, 50m and 75m) as per BS 8100, and TIA 222 G. Design of base plate and holding down bolts. Preparation of line drawings. Preparation of design reports. Preparation of cost estimate Supervise the cad technologists to prepare the erection and fabrication drawing.

Project title: “Construction of 10 storied residential reinforced concrete building at Gazipur for Insignia Studio, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of Shallow foundation (Isolated and combined footing). Design for soft-story Check for joint shear and strong column weak beam. Supervise the cad technologists to prepare the working drawing.

Project title: “Construction of 9 storied residential reinforced concrete building at Uattara Dhaka for Cubeinside, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of Mat foundation. Design for soft-story Check for joint shear and strong column weak beam. Supervise the cad technologists to prepare the working drawing.

Project title: “Construction of 9 storied residential reinforced concrete building at Uattara Dhaka for Cubeinside, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.

Page 5: Projects of Moniruzzaman.moni

Page 5 of 6 Moniruzzaman Moni, MASc.

Design of Mat foundation. Design for soft-story Check for joint shear and strong column weak beam. Supervise the cad technologists to prepare the working drawing.

Project title: “Construction of 4 Nos. 9 storied residential reinforced concrete building at Uattara Dhaka for SBDL, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per IBC 2003 using finite element software ETABS. Design of different foundation depending on sub soil investigation report. Design for soft-story Check for joint shear and strong column weak beam. Supervise the cad technologists to prepare the working drawing.

Project title: “Seismic assessment and retrofitting design of 8 storied reinforced commercial Building, Dhaka, Bangladesh”

Responsibilities: Prepare as built architectural drawing and structural drawing. Perform non destructive ultra sonic pulse velocity test to get information about the concrete. Perform destructive test (core test). Perform carbonation test. Seismic assessment of the building by using spread sheet. Retrofitting design of the garment building including foundation, column jacketing, and shear wall by using spread

sheet. Supervise to prepare the preliminary drawing.

Contributed in different projects related to risk assessment. Design 4, 6 and 8 storied reinforced concrete building as per CSA A23.3 standard located in Vancouver for a research

project. Design 4, 6 and 8 storied braced steel frame as per CSA S16-09 standard considering building is located in Vancouver

for a research project. Seismic response modification factor, seismic vulnerability assessment, and progressive collapse analysis by using

smart material for reinforced concrete buildings. Worked as a teaching assistant for different undergraduate courses.

Project title: “Construction of 366m long pre-stressed concrete girder bridge over the river surma at sylhet, Bangladesh for roads and high ways department.”

Responsibilities:

Dead load and live load calculation for 50m and 36m span pre-stressed girder. Wind load and seismic load analysis for the bridge pier as per AASHTO LRFD 6th edition. Design the sub-structure as an assistant of a senior engineer. Supervise the cad technologists to prepare the working drawing.

Project title: “Construction of 3100m long hybrid (RCC and Pre-stressed) intersection overpass at Kuril, Dhaka, Bangladesh for roads and high ways department.”

Responsibilities: Work as an assistant to write the feasibility study reports. Dead load and live load calculation for 60m rcc box girder by using SAP Bridge module.

Research Assistant and Teaching Assistant

The University of British

Columbia

Okanagan, Canada September 09-May 11

Structural Design Acumen Consulting Dhaka, Bangladesh May 2005 – August

Page 6: Projects of Moniruzzaman.moni

Page 6 of 6 Moniruzzaman Moni, MASc.

Dead load and live load calculation for 30m pre-stressed girder by using spread sheet. Wind load and seismic load analysis for the over pass pier as per AASHTO LRFD 6th edition. Design the sub-structure as an assistant of a senior engineer. Supervise the cad technologists to prepare the working drawing.

Project title: “Construction of 4 storied reinforced concrete garments factory building at Gazipur, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per UBC 1994 using finite element software ETABS. Design of cast in situ pile foundation.

Project title: “Construction of 12 storied plus two basement reinforced concrete commercial building at Dhaka, Bangladesh”

Responsibilities:

Preliminary design to support the architect. Wind Load calculation as per UBC 1994 using finite element software ETABS. Seismic Analysis of this building as per UBC 1994 using finite element software ETABS. Design of mat foundation, ramp, basement wall.

.