OVERVIEW Review of completed projects Update on large construction projects Update on remaining...

13
SCHOOL CONSTRUCTION UPDATE November 4, 2015

Transcript of OVERVIEW Review of completed projects Update on large construction projects Update on remaining...

Page 1: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

SCHOOL CONSTRUCTION UPDATE November 4, 2015

Page 2: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

OVERVIEW

Review of completed projects

Update on large construction projects

Update on remaining projects

Page 3: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

COMPLETED PROJECTS Athletic Complexes $12M

Mat-Su Day School $12.4M

Valley Pathways $22.5M

Big Lake ES Reno Ph I $2.2M

Houston/Palmer Jr MS Lockers $335K

Flooring Replacements Ph I $2M

Palmer HS Mechanical Upgrades $5.5M

Trapper Creek ES Roof $1M

Swanson ES Ext Upgrades $200K

Willow ES Roof $1.3M

Joe Redington Sr MS/HS $65M

CTHS Addition $16M

Houston HS Exterior Siding $600K

ADA Upgrades District Wide $1.5M

Washroom Upgrade District Wide $800K

Palmer HS, Palmer Jr MS, Cottonwood Creek ES, Pioneer Peak ES Roofs $3.8M

Page 4: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

DENA’INA ES $26.5M Design: Bettisworth North

Construction: FE Const.

44,224 SF

K through 5 school Work started April 2015 Approx. 50% complete

Occupy fall 2016

Page 5: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

DENA’INA ES

ExteriorInterior

Page 6: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

IDITAROD ES $25.2M Design: MCG

Construction: Collins

50,605 SF replacement school

Work started May 2015 Approx. 55% complete Occupy fall 2016

Page 7: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

IDITAROD ES Exterior Interior

Page 8: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

FRONTERAS CHARTER SCHOOL $6.9M Contractor: Howdie Const.

Funded by USDA loan and $500K from MSB

Foundation complete and framing is in progress

Access road from Seward Meridian is in place

Construction schedule is to occupy Jul/Aug 2016

Page 9: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

FRONTERAS CHARTER SCHOOLFraming in Progress

Page 10: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

ATHLETIC FIELD IMPROVEMENTS $6.4M Play court upgrades at Finger Lake, Snowshoe, Larson,

Glacier View and Houston High completed in 2014

Summer 2015 work completed: - Su-Valley HS synthetic track - Palmer Jr MS track and new bleachers - Glacier View ice rink upgrades, softball field upgrades, new water line, fencing and ADA parking- Iditarod ball field improvements

Spring 2016: Install Iditarod softball/baseball turf in-fields

Page 11: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

ADDITIONAL PROJECTS Back-Up Generators, District Wide $2.6M - Design: AMC Engineering, 1oo% design - Base bid includes Wasilla MS, Wasilla HS and Palmer HS - MSBSD approved 3 manufactures and will be advertised this month

Big Lake ES Renovation Ph II $800K, and ADA Parking Upgrades $200K

- Work includes flooring, lighting, washroom partitions, and parking lot - Flooring and parking lot were complete prior to school start - Bathroom partitions are near completion - Lighting is currently advertised with bids due December 1

District Wide HVAC Upgrades $7.1M - Design: PDC Engineers, Contractor: Wirtanen Construction - Scope includes upgrading building controls from pneumatic to direct digital controls and is approximately 40% complete - Work will continue into the 2017 school year

Page 12: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

ADDITIONAL PROJECTS cont. District Wide Energy Upgrades $3.1M (Gym Lighting and Windows) - Design: Architects Alaska, Construction: Haakenson Electric -- New LED Gym lighting: Wasilla HS, Burchell, Houston MS, Cottonwood Creek, Pioneer Peak, Larsen, Shaw, and Snowshoe, Big Lake, Willow, Swanson, Sherrod, and Goose Bay are complete -- Palmer Jr MS gym lighting will be complete this month - Partial window replacements at 18 schools will be advertised this winter for summer 2016 construction

Flooring Replacements $200K (funded by flooring bond balance) - Scope includes new poured rubber gym flooring at Sherrod, Swanson and Pioneer Peak Elementary Schools - Work will occur over Christmas and spring breaks

Roof Bond Balance $800K - Replace Sutton ES roof summer 2016

Page 13: OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.

QUESTIONS