Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013 -2016 Transportation Improvement Program TIP Program Barrington 2013 State Traffic Commission C-4 County Road at Middle Highway TS - Recommended State Traffic Commission (STC) 2013 State Traffic Commission C-4 Middle Highway at South Lake Drive TS - Recommended State Traffic Commission (STC) Massasoit Ave Sidewalks $0.52 BP - Recommended S&D Bike/Pedestrian Program Nayatt Road (1R) Rumstick Road to Washington Road $1.00 PM - Pavement Only Pavement Management Program Page 1 of 60 Revised November 21, 2013

Transcript of Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60....

Page 1: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Barrington2013 State Traffic Commission C-4County Road at Middle Highway

TS - RecommendedState Traffic Commission (STC)

2013 State Traffic Commission C-4Middle Highway at South Lake Drive

TS - RecommendedState Traffic Commission (STC)

Massasoit Ave Sidewalks $0.52 BP - Recommended S&DBike/Pedestrian Program

Nayatt Road (1R)Rumstick Road to Washington Road

$1.00 PM - Pavement OnlyPavement Management Program

Page 1 of 60Revised November 21, 2013

Page 2: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

BristolColt State Park Bike Path $2.38 BP - RecommendedBike/Pedestrian Program

Colt State Park Street Lighting and Restoration

$0.59 EN - RecommendedEnhancement Program

Hazard Elimination - Bristol CountyHope Street (Rt. 114) at Chestnut Street

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave (Rt. 136) at Tupelo St.

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave (Rt. 136) at Bayview Ave.

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyHope Street (Rt. 114) at Market St./Miller St.

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave. (Rt. 136) at Chestnut St./Annawamscutt Drive

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyFerry Road/Roger Williams University Entrance

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave (Rt. 136) at Stop n Shop

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave (Rt. 136) at Roosevelt Drive

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave. (Rt. 136) at Gooding Ave.

TS - RecommendedHighway Safety Improvement Program (HSIP)

Page 2 of 60Revised November 21, 2013

Page 3: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

BristolHazard Elimination - Bristol CountyHope Street (Rt. 114) at State Street

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hope Street

Hope Street - Constitution to Ferry

$1.00 PM - Recommended FUT, sidewalks only

Pavement Management Program

Metacom Ave. Sidewalks $2.82 SD - RecommendedStudy & Development Program

Poppasquash Road (1R)End to Rt. 114 (Hope Street)

$3.50 PM - Recommended FUTPavement Management Program

Rt. 114 (1R)

Dyer Ave (Warren) to Washington St. (Bristol)

$3.00 PM - Recommended, sidewalks only

Pavement Management Program

Page 3 of 60Revised November 21, 2013

Page 4: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

BurrillvilleShippee Bridge # 307Route 98 over Nipmuc River

BR - RecommendedBridge Program

Tr. 107 (1R)Route 100 to 400' West of Union Ave. remaining part of Pascoag one-way circulator

$2.00 PM - RecommendedPavement Management Program

Victory Highway

Route 7 to 0.5 miles south. C-2, Phase III

$0.50 PM - Recommended, Reduced Scope

Pavement Management Program

Victory HighwayMain Street to Rt. 107 (East Ave.) Phase I & II

$1.00 PM - RecommendedPavement Management Program

Page 4 of 60Revised November 21, 2013

Page 5: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Central FallsBlackstone River Bicycle FacilitySegment 3B - Branch Street Cumberland Town Hall

BR - Recommended S&DBike/Pedestrian Program

Blackstone River Bicycle FacilitySegment 3A - Pawtucket Landing to Branch Street

BP - Recommended S&DBike/Pedestrian Program

Dexter StreetRt. 122 (Lonsdale Ave.) to Goff Ave

$1.30 PM - RecommendedPavement Management Program

Rail - Fixed Guideway

Pawtucket/Central Falls Commuter Rail Station

$4.50 TR - Recommended, Final Design

Transit Program

Page 5 of 60Revised November 21, 2013

Page 6: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

CharlestownADA Projects

South County Trail (Rt. 2) - Carolina Back Road (Rt 112) to Old Mill Lane will add waterline under sidewalk and fix drainage problem on Indian land.

HW - On list to be prioritized by Governor's Commission on Disabilities

Highway Program

Columbia Heights $0.43 EN - RecommendedEnhancement Program

Old Post Road - Rt. 1A (1R) - C-2US Rt. 1 to US Rt. 1

$1.50 PM - Recommended FUTPavement Management Program

US Rt. 1Oyster Drive to South Kingstown T/L

$5.00 PM - RecommendedPavement Management Program

Page 6 of 60Revised November 21, 2013

Page 7: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

CoventryAnthony Village Initiative $0.32 EN - RecommendedEnhancement Program

Bike Route Signage BP - General line item for signage included

Bike/Pedestrian Program

Hopkins Hollow Road (1R)From Pole 17 Roaring Brook to Pole 1 Sand Hill Road

FY 2012Pavement Management Program

Rt. 102 (1R) C-3Harkney Hill Rd to Old Plainfield Pike

$2.00 PM - RecommendedPavement Management Program

Rt. 116Washington St. to Gervais Rd.

$0.80 PM - RecommendedPavement Management Program

Trestle Trail, East Section Log Bridge Road to the CT border

$4.00 BP - RecommendedBike/Pedestrian Program

Trestle Trail, West Section Town Farm Road to Log Bridge Road

$5.90 BP - RecommendedBike/Pedestrian Program

Page 7 of 60Revised November 21, 2013

Page 8: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Cranston2013 State Traffic Commission C-3Atwood Ave. at Walnut Grove Ave.

TS - RecommendedState Traffic Commission (STC)

2014 State Traffic Commission C-3Plainfield St. at Atwood Ave.

TS - RecommendedState Traffic Commission (STC)

Cranston Street Enhancements Cranston

$1.20 HW - Recommended FUTHighway Program

Hazard Elimination - Central Reservoir and Park Avenue

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Central Route 2 ramp and Route 5

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Central Route 10 and Route 2 Ramps

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Central Reservoir and Aqueduct Avenue

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Central Phenix and Scituate Ave/Wayland

TS - RecommendedHighway Safety Improvement Program (HSIP)

High Hazard Ramps - Interstate C-1 (Long Term) Plainfield Pike at Independence Way (Walmart Plaza)

TS - RecommendedHighway Safety Improvement Program (HSIP)

I-295 Safety and Bridge Contract - 1CWilbur Ave. to South of Scituate Ave. Bridges

$6.00 IN - Recommended FUTInterstate Program

I-95 Resurfacing Contract - 5Route 113 to North of Thurbers Ave. Curve

$20.00 IN - RecommendedInterstate Program

Page 8 of 60Revised November 21, 2013

Page 9: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

CranstonMeshanticut Interchange, Bridge Contract #3Bridges # 820, # 821, # 245, # 246, # 490, # 491 bridges carrying Rte 2 and West Natick Rd. in Warwick, near the malls.

$5.00 BR - RecommendedBridge Program

Pontiac Ave./Sockanosset Cross Rd. IntersectionLane configuration, minor widening, upgrade of signal timing and cabinets

$3.00 TS - RecommendedStudy & Development Program

Reservoir Ave. (1R)Park Ave. to Sockanosset Cross Rd

$4.00 PM - RecommendedPavement Management Program

Route 6/Route 10 Interchange SD - RecommendedStudy & Development Program

Rt. 2 Bald Hill/New LondonWest Natick Rd. to Rt. 37

$2.50 PM - RecommendedPavement Management Program

Rt. 37Natick Ave to US Rt. 1 (Post Rd.)

$3.00 PM - RecommendedPavement Management Program

Rt. 5 C-1C-1 Mayfield Ave. to Rt. 95

$4.50 HW - RecommendedHighway Program

Page 9 of 60Revised November 21, 2013

Page 10: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Cumberland2012 State Traffic Commission C-2Mendon Road at Davenport's Restaurant

TS - RecommendedState Traffic Commission (STC)

Blackstone Canal $0.40 EN - RecommendedEnhancement Program

Blackstone River Bicycle FacilitySegment 3A - Pawtucket Landing to Branch Street

BP - Recommended S&DBike/Pedestrian Program

Blackstone River Bicycle FacilitySegment 3B - Branch Street Cumberland Town Hall

BR - Recommended S&DBike/Pedestrian Program

Broad Street Improvements SD - RecommendedStudy & Development Program

Hazard Elimination North - Contract 3High Street at Dexter

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination North - Contract 4Mendon Road at Scott Road

TS - RecommendedHighway Safety Improvement Program (HSIP)

Howard Road Bridge #459Bridge and Immediate Approaches

$1.00 BR - RecommendedBridge Program

I-295 Safety and Lighting Contract - 2ERoute 7 to MA State Line

$4.00 IN - Recommended FUTInterstate Program

Manville Landing Funded through EarmarkEnhancement Program

Newel Bridge #204 $1.50 BR - RecommendedBridge Program

Page 10 of 60Revised November 21, 2013

Page 11: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

CumberlandPark East Drive $2.90 PM - Recommended FUTPavement Management Program

Page 11 of 60Revised November 21, 2013

Page 12: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

East GreenwichArterials - Contract 2 (US Route 1, RI Route 3)Division Street to Grandview Rd./Clemente Dr.

$1.00 TS - RecommendedArterial Traffic Signal Synchronized Systems

Division Street Bridge #760 $3.00 BR - RecommendedBridge Program

East Greenwich Bicycle Network, East Greenwich Multi-Use pathFrom Crompton Avenue (E. Greenwich) to Forge Road (Warwick). This is part of an overall 40 mile Bicycle network that links an on-road bicycle route with an off road multi-use path along Greenwich Cove.

FY 2012Bike/Pedestrian Program

Maskerchugg River Bridge Multi-Use Path

$0.50 BP - RecommendedBike/Pedestrian Program

Middle Road Bridge # 761Middle Road Bridge Over Rt. 4

$1.00 BR - RecommendedBridge Program

Post Road ReconstructionC-1 & C-2 Franklin Road to School Street. Shopping Center Intersection outside project limits added to the project

$12.00 HW - Recommended FUTHighway Program

Route 4 US Rt. 1 (Tower Hill Road) and Route 403 to Oak Hill Road and I-95

$3.00 PM - RecommendedPavement Management Program

Route 4 & I-95 InterchangeHP- 974

SD - RecommendedSAFETEA-LU Earmarks

STC - Division Street ImprovementsRte. 2 to NEIT Entrance

$1.10 FY 2012State Traffic Commission (STC)

Page 12 of 60Revised November 21, 2013

Page 13: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

East Providence2013 State Traffic Commission - C-4Willett Ave. @ Forbes St. - install wheelchair ramps at crosswalk

TS - RecommendedState Traffic Commission (STC)

2013 State Traffic Commission - C-4Willett Ave. @ 548 Willett Ave. - install wheelchair ramps at crosswalk

TS - RecommendedState Traffic Commission (STC)

Coles Bridge # 134200' N & S of Bridge along Pawtucket avenue

$1.50 BR - RecommendedBridge Program

East Shore ExpresswayRt. 114 (Wampanoag Trail) to I-195

$2.00 PM - RecommendedPavement Management Program

Hazard Elimination - East Bay C-21) Highland Ave (Rt 6)/Catamore Blvd, 2) Pawtucket Ave (Rt 1A)/Waterman Ave

$1.00 TS - RecommendedHighway Safety Improvement Program (HSIP)

Henderson Bridge # 600 RehabilitationBridge and Immediate Approaches

BR - Recommended FUTBridge Program

Horton Farm Bridge #472 $1.50 BR - RecommendedBridge Program

I-195 Resurfacing and SafetyEast Shore Expressway to MA State Line

$1.50 IN - RecommendedInterstate Program

India Point Power Lines E. Prov.East Providence

EN - Recommended FUTEnhancement Program

McCormick Quarry Bridge #476 $3.50 BR - RecommendedBridge Program

Newman Ave. Bridge # 224 Bridge ReplacementApproximately 110' on west side of bridge and to the MA State line on east side of bridge

$2.00 BR - RecommendedBridge Program

Page 13 of 60Revised November 21, 2013

Page 14: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

East ProvidencePawtucket Ave. Sidewalk Reconstruction

Taunton Ave. to Veterans Memorial Parkway

$2.15 HW - On list to be prioritized by Governor's Commission on Disabilities

Highway Program

Pawtucket Avenue Bridge #471 $3.00 BR - RecommendedBridge Program

Pomham Rocks LightFriends of Pomham Rocks

$0.10 EN - RecommendedEnhancement Program

Roger Williams AvenueRuth Street to N. Broadway

SD - RecommendedStudy & Development Program

Rosa Larisa Memorial Park $0.10 EN - RecommendedEnhancement Program

Taunton Avenue (1R)From Pawtucket Avenue to the Massachusetts State Line

$1.50 PM - RecommendedPavement Management Program

Taunton Avenue Restriping/Road DietC-1

$0.50 FY 2012State Traffic Commission (STC)

Ten Mile River Greenway, Segments 1-4 $2.50 BP - RecommendedBike/Pedestrian Program

Page 14 of 60Revised November 21, 2013

Page 15: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

ExeterIntersection Improvements - Rt. 3 and Rt. 102 SouthC-5

$0.50 TS - RecommendedState Traffic Commission (STC)

Teft Hill Trail Bridge #592 $2.50 BR - RecommendedBridge Program

Page 15 of 60Revised November 21, 2013

Page 16: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

FosterRt. 102 (1R) C-3Harkney Hill Rd to Old Plainfield Pike

$2.00 PM - RecommendedPavement Management Program

Page 16 of 60Revised November 21, 2013

Page 17: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

GlocesterReuben Mason House Restoration Glocester Heritage Society

$0.10 EN - RecommendedEnhancement Program

Route 94Foster T/L to US Rt. 44

$4.00 PM - Recommended FUTPavement Management Program

Rt. 44 (1R)C-3B - RIDOT Maintenance Facility to West Greenville

$3.75 PM - RecommendedPavement Management Program

Page 17 of 60Revised November 21, 2013

Page 18: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

HopkintonAshaway Rd./ Rt. 216 $2.50 FY 2012Pavement Management Program

Laurel St./Maxson St.Laurel - Potter Hill Road to Rt. 216 (High Street) & Maxon Street - Laurel to Rt. 3 (Main Street)

$0.70 PM - RecommendedPavement Management Program

Wood River Bridge #261Bridge and Immediate Approaches

FY 2012Bridge Program

Woodville RoadRt. 3 to Switch Road

$3.00 PM - RecommendedPavement Management Program

Page 18 of 60Revised November 21, 2013

Page 19: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

JamestownBike Access - Jamestown Bridge BP - Recommended S&DBike/Pedestrian Program

Ice Road Bike Path BP - Recommended S&DBike/Pedestrian Program

Jamestown-Verrazano Bridge #800 $2.00 BR - RecommendedBridge Program

Narragansett Ave. PavementEnd to Southwest Aveneu

$0.50 PM - RecommendedPavement Management Program

Walcott Ave - Sidewalk and Curbing

Hamilton Ave to Fort Wetherill State Park

$0.18 HW - On list to be prioritized by Governor's Commission on Disabilities

Highway Program

Page 19 of 60Revised November 21, 2013

Page 20: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Johnston2013 State Traffic Commission C-4Plainfield St. at Atwood Ave.

TS - RecommendedState Traffic Commission (STC)

2014 State Traffic Commission C-4Plainfield St. crosswalks at Willow Street and Pocasset St.

TS - RecommendedState Traffic Commission (STC)

Central Avenue/Sunset Avenue (1R)Atwood Avenue (Route 5) to Killingly Street

$1.00 PM - RecommendedPavement Management Program

Hartford Ave. (Rt. 6A) ReconstructionC-2 Atwood Ave to Killingly Street with Landscaping

$6.25 HW - RecommendedHighway Program

Hazard Elimination - North (C-3)Hartford and Bishop Hill

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - North (C-3)Hartford Avenue and Hopkins

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - North (C-3)Greenville Ave and Killingly St

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - North (C-3)Hartford and Rollingwood

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - North (C-3)Hartford and Reservoir

TS - RecommendedHighway Safety Improvement Program (HSIP)

High Hazard Ramps - Interstate C-1 (Long Term) Plainfield Pike at Comstock Pkwy

TS - RecommendedHighway Safety Improvement Program (HSIP)

High Hazard Ramps - Interstate C-1 (Long Term) Plainfield Pike at I-295 SB Ramps

TS - RecommendedHighway Safety Improvement Program (HSIP)

Page 20 of 60Revised November 21, 2013

Page 21: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

JohnstonHigh Hazard Ramps - Interstate C-1 (Long Term) Plainfield Pike at I-295 NB Ramps

TS - RecommendedHighway Safety Improvement Program (HSIP)

High Hazard Ramps - Interstate C-1 (Long Term) Plainfield Pike at Simmonsville Avenue

TS - RecommendedHighway Safety Improvement Program (HSIP)

I-295 Safety and Bridge Contract - 1CWilbur Ave. to South of Scituate Ave. Bridges

$6.00 IN - Recommended FUTInterstate Program

Simonsville Bridge # 326Simonsville Ave over Simmons Brook. Immediate Approaches only

$1.00 BR - RecommendedBridge Program

US Rt. 6 - Scituate/JohnstonI-295 to Danielson Pike

$6.00 PM - RecommendedPavement Management Program

Windsor Ave (1R)Steere Rd. to Greenville Ave.

$1.00 PM - RecommendedPavement Management Program

Woonasquatucket River Heritage Trail Johnston

$0.20 EN - Recommended FUTEnhancement Program

Page 21 of 60Revised November 21, 2013

Page 22: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Lincoln2012 State Traffic Commission C-2Smithfield Ave. at Meader St.

TS - RecommendedState Traffic Commission (STC)

2012 State Traffic Commission C-2Jenckes Hill Road at the Lincoln Middle School

TS - RecommendedState Traffic Commission (STC)

2012 State Traffic Commission C-2Front Street at the Lonsdale Fire Station

TS - RecommendedState Traffic Commission (STC)

2013 State Traffic Commission C-4George Washington Hwy @ Old River Road

$0.50 TS - RecommendedState Traffic Commission (STC)

Blackstone Canal $0.40 EN - RecommendedEnhancement Program

Hazard Elimination North - Contract 3Route 99 SB at Route 146 Ramps

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination North - Contract 3Breakneck and Route 146 Ramps

TS - RecommendedHighway Safety Improvement Program (HSIP)

I-295 Safety and Lighting Contract - 2ERoute 7 to MA State Line

$4.00 IN - Recommended FUTInterstate Program

Lincoln Landing Enhancement Project Lincoln

$0.04 EN - RecommendedEnhancement Program

Louisquisset Pike Bridge #276 $5.00 BR - RecommendedBridge Program

Old River Road - Albion/ManvilleSchool Street to Sayles Hill Road

$2.50 PM - Recommended FUTPavement Management Program

Page 22 of 60Revised November 21, 2013

Page 23: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

LincolnRailroad Street (1R)Main Street to Old River Road, Main Street to Woonsocket City Line (Old River Road)

$3.13 PM - RecommendedPavement Management Program

Route 126Pawtucket C/L to Woodland Street

$1.00 PM - Recommended FUTPavement Management Program

Route 146Rt. 95 to Sherman Ave

$6.50 PM - RecommendedPavement Management Program

Route 146 Freeway Guide SignsRoute 146

TS - RecommendedSigning

Rt. 116/146 Interchange Reconstruction146 Mainline & Mainline Bridge #176

$6.25 HW - Recommended FUTHighway Program

School street (1R)Main St. to Rt. 126

$2.50 HW - Recommended FUTPavement Management Program

Page 23 of 60Revised November 21, 2013

Page 24: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Little ComptonMeeting House LaneRt. 77 (West Main Rd.) to South of Commons Road

$0.70 PM - Recommended FUTPavement Management Program

Snell RoadEast Main Road to Long Highway

$0.70 PM - RecommendedPavement Management Program

Page 24 of 60Revised November 21, 2013

Page 25: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Middletown2014 State Traffic Commission C-6

C-6, East Main Road at Aquidneck Ave

$0.50 TS - Recommended (Study Only)

State Traffic Commission (STC)

Aquidneck Ave. ReconstructionEast Main to Green End

SD - RecommendedStudy & Development Program

Burma Road SD - RecommendedStudy & Development Program

Hazard Elimination - Newport CountyGreen End Avenue and Aquidneck

$1.50 TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Newport County C-2West Main Road at Forest Ave.

TS - RecommendedHighway Safety Improvement Program (HSIP)

J.T. Connell HighwayAdm. Kalbfus Rotary to E. Main Rd./Coddington Hwy

SD - RecommendedStudy & Development Program

Newport Dinner Train Island Shuttle Rail ImprovementsNewport, Middletown, Portsmouth

FY 2012CMAQ

Reconstruction of Two Mile Corner (Rts. 138 & 114)East Main Road - Bailey Brook to West Main Road; West Main Road - East Main Road to Coddington Hwy.

$5.64 HW - RecommendedHighway Program

RI*STARS Aquidneck Island C-3East Main Road at Turner Road

TS - RecommendedRI*STARS

RI*STARS Aquidneck Island C-5West Main Road/Broadway at Admiral Kalbfus Road/Miantonomi Ave.

TS - RecommendedRI*STARS

Page 25 of 60Revised November 21, 2013

Page 26: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

MiddletownSafety Improvements Vally Rd./Green End Ave./Aquidneck Ave. Intersections

FY 2012Study & Development Program

West Main Rd C-2, includes West Main Rd. left turn lanes, Raytheon & Union St. C-2 John Kesson Lane (Middletown) to Locust Avenue (Portsmouth) - 2 miles

$6.50 PM - Recommended FUTPavement Management Program

West Main Road - Left Turn Lanes

Raytheon to Forest Avenue, incorporating into a 1R project

Combined with West Main Rd. C-2 Project

Study & Development Program

Page 26 of 60Revised November 21, 2013

Page 27: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Narragansett2012 State Traffic Commission C-2Point Judith Road at Knowlesway

TS - RecommendedState Traffic Commission (STC)

2012 State Traffic Commission C-2Ocean Road at Knowlesway

TS - RecommendedState Traffic Commission (STC)

2012 State Traffic Commission C-2Point Judith Road at Woodruff Road/ S. Pier Rd.

TS - RecommendedState Traffic Commission (STC)

Boston Neck Road Beautification - South $0.25 EN - Recommended FUTEnhancement Program

Bridgetown RoadUS Rt.1 to Rt. 1A

$1.00 PM - Recommended FUTPavement Management Program

Great Island Bridge $3.00 BR - RecommendedBridge Program

Ocean Road Beautification - Phase I & II $0.62 EN - RecommendedEnhancement Program

South County Bike Path Extension $1.55 BP - Recommended S&DBike/Pedestrian Program

South Pier Road ReconstructionRt. 108 (Point Judith Road) to Boone Street

$1.30 PM - RecommendedPavement Management Program

Page 27 of 60Revised November 21, 2013

Page 28: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Narragansett Indian TribeCrandall Farm Restoration $0.15 EN - RecommendedEnhancement Program

Page 28 of 60Revised November 21, 2013

Page 29: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

New ShorehamCorn Neck Road Shared Roadway Signage BP - General line item for

signage includedBike/Pedestrian Program

Ocean AvenueBeach Avenue to Bridge Gate Square (Corn Neck Road)

$0.40 PM - RecommendedPavement Management Program

Southeast Light Museum Rehab $0.60 EN - RecommendedEnhancement Program

West Side Road - Sidewalks BP - Recommended S&DBike/Pedestrian Program

Page 29 of 60Revised November 21, 2013

Page 30: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

NewportBroadway (1R)Washington Square to Bliss Road modified to Farewell to Bliss Road

FY 2012Pavement Management Program

Goat Island Bridge #697Includes New Utility/Pedestrian Bridge Adjacent to Existing Bridge

$16.71 BR - Recommended FUTBridge Program

J.T. Connell HighwayAdm. Kalbfus Rotary to E. Main Rd./Coddington Hwy

SD - RecommendedStudy & Development Program

Ocean Avenue Seawall SD - RecommendedStudy & Development Program

Pell Bridge AccessBridge Approaches/Ramps (Admiral Kalbfus to America's Cup)

$11.06 HW - RecommendedHighway Program

RI*STARS Aquidneck Island C-2West Main Rd./Broadway at Admiral Kalbfus Rd/Miantonomi Ave.

TS - RecommendedRI*STARS

RI*STARS Aquidneck Island C-2Memorial Blvd. between America's Cup Ave. & Old Beach Rd.

TS - RecommendedRI*STARS

RI*STARS Aquidneck Island C-2America's Cup Ave. corridor, between Bridge St. & Memorial Blvd.

TS - RecommendedRI*STARS

Southern Thames StreetMemorial to Ann Street

$0.45 EN - RecommendedEnhancement Program

Thames Street and Spring Street Streetscape ImprovementsThames - Memorial to Wellington, Spring - Morton to Memorial

SD - RecommendedStudy & Development Program

Page 30 of 60Revised November 21, 2013

Page 31: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

North Kingstown2012 State Traffic Commission C-2Davisville Roundabout

TS - RecommendedState Traffic Commission (STC)

Clarence L. Hussey Memorial Bridge #11Bridge carrying 1A over Wickford Cove

FY 2012Bridge Program

Hazard Elimination - SouthRoute 2 and 102 (Oatleys)

TS - RecommendedHighway Safety Improvement Program (HSIP)

Jamestown Bridge Bicycle/Pedestrian AccessRt. 1A in North Kingstown to Narragansett Avenue

BP - Recommended S&DBike/Pedestrian Program

Jamestown-Verrazano Bridge #800 $2.00 BR - RecommendedBridge Program

Post Road ReconstructionC-1 & C-2 Franklin Road to School Street. Shopping Center Intersection outside project limits added to the project

$12.00 HW - Recommended FUTHighway Program

Post Road Reconstruction - includes Bike Study Wickford to QuonsetMaxwell Drive to West Main Street, in conjunction with sewer project, road diet, on street bike lanes, new sidewalks in existing ROW, streetscape

$3.00 PM - RecommendedPavement Management Program

Route 1/4West Allenton Road Intersection

SD - RecommendedStudy & Development Program

Route 4 & I-95 InterchangeRt. 1 to Oak Hill Rd, Rt. 403 to I-95

$3.00 PM - RecommendedPavement Management Program

Rt. 403 RampsPost Rd. to West Davisville Road

$2.88 HW - Recommended FUTHighway Program

Page 31 of 60Revised November 21, 2013

Page 32: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

North KingstownSmith CastleSmith Castle Association

$0.18 EN - RecommendedEnhancement Program

Page 32 of 60Revised November 21, 2013

Page 33: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

North Providence2013 State Traffic Commission C-4Mineral Spring Ave. at Central St.

TS - RecommendedState Traffic Commission (STC)

2013 State Traffic Commission C-4Waterman Ave. at Greystone Ave.

TS - RecommendedState Traffic Commission (STC)

Hazard Elimination - Metro NorthMineral Spring at Charles Street

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Metro NorthMineral Spring at Cooper

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Metro NorthMineral Spring at 146 SB Ramps

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Metro NorthMineral Spring at 146 NB Ramps

TS - RecommendedHighway Safety Improvement Program (HSIP)

Route 146Rt. 95 to Sherman Ave

$6.50 PM - RecommendedPavement Management Program

Route 146 Freeway Guide SignsRoute 146

TS - RecommendedSigning

Woonasquatucket Avenue (1R)Smith Street (Route 44) to Fruit Hill Road

$2.50 PM - RecommendedPavement Management Program

Page 33 of 60Revised November 21, 2013

Page 34: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

North Smithfield2013 State Traffic Commission C-3North Main St. at Mechanic St.

TS - RecommendedState Traffic Commission (STC)

Blackstone River Bicycle FacilitySegment 8B - Truman Dr. to MA S/L

BP - Recommended S&DBike/Pedestrian Program

Branch River Bridge #108 Bridge ReplacementBridge and Immediate Approaches

$1.00 BR - RecommendedBridge Program

Central Street Bridge #449 Rehabilitation50' on each side of bridge

$1.00 BR - RecommendedBridge Program

Hazard Elimination - North (C-3)St. Paul at Great Rd.

TS - RecommendedHighway Safety Improvement Program (HSIP)

Route 104Rt. 7 to Rt. 5

$0.80 PM - Recommended FUTPavement Management Program

Route 146 Freeway Guide SignsRoute 146

TS - RecommendedSigning

Rt. 146 at Sayles Hill RoadSayles Hill Road at Rt. 146

SD - RecommendedHighway Safety Improvement Program (HSIP)

Slatersville Stone Arch Bridge #273Route 5 over Branch River

$4.00 BR - RecommendedBridge Program

Union Village RR Bridge #107Over P&W RR Tracks

$1.50 BR - RecommendedBridge Program

Page 34 of 60Revised November 21, 2013

Page 35: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Pawtucket2012 State Traffic Commission C-2Newport Ave. at Beverage Hill Ave.

TS - RecommendedState Traffic Commission (STC)

Blackstone NavigationBlackstone Valley Tourism Council

$0.04 EN - RecommendedEnhancement Program

Blackstone River Bicycle FacilitySegment 3B - Branch Street Cumberland Town Hall

BR - Recommended S&DBike/Pedestrian Program

Blackstone River Bicycle FacilitySegment 3A - Pawtucket Landing to Branch Street

BP - Recommended S&DBike/Pedestrian Program

Dexter StreetRt. 122 (Lonsdale Ave.) to Goff Ave

$1.30 PM - RecommendedPavement Management Program

Division Street Bridge $0.10 BR - Recommended FUTBridge Program

Exchange Street EnhancementsPawtucket

$0.50 EN - RecommendedEnhancement Program

Hazard Elimination - East Bay C-1Central Ave/George R. Bennet Hwy

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - East Bay C-1Lonsdale Ave (Rt 122)/Weeden St

TS - RecommendedHighway Safety Improvement Program (HSIP)

I-95 Resurfacing Contract - 6Westminister Street Overpass to MA State Line

$18.00 IN - RecommendedInterstate Program

Main Street ConversionHigh St. to Broad St.

SD - RecommendedStudy & Development Program

Page 35 of 60Revised November 21, 2013

Page 36: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

PawtucketMineral Spring Avenue (1R)North Providence C/L to Conant St.

FY 2012Pavement Management Program

Pawtucket River Bridge #550I-95 over Pleasant St., Taft St., & Seekonk River

$20.00 MP - RecommenedMajor Projects

Rail - Fixed Guideway

Pawtucket/Central Falls Commuter Rail Station

$4.50 TR - Recommended, Final Design

Transit Program

Slater Mill Phase II Pawtucket

$0.50 EN - RecommendedEnhancement Program

Page 36 of 60Revised November 21, 2013

Page 37: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

PortsmouthBurma Road =====

SD - RecommendedStudy & Development Program

East Main Rd. - Includes Town CenterTurnpike to Hedley

$15.00 HW - RecommendedHighway Program

East Main Road Sidewalks

Turnpike Road to Boyds Lane

$1.84 HW - On list to be prioritized by Governor's Commission on Disabilities

Highway Program

Hazard Elimination - Newport CountyStub Toe Lane and East Main Rd

TS - RecommendedHighway Safety Improvement Program (HSIP)

Island Shuttle Train FY 2012CMAQ

Route 24 Freeway Guide SignsRoute 24

TS - RecommendedSigning

Rt. 114 C-3Locust Ave to Rt. 24 - 2 miles

$3.50 PM - RecommendedPavement Management Program

Rt. 114 C-4 including intersections at West Main Road @ Hedley Street and Cory's Lane

SD - RecommendedStudy & Development Program

Sakonnet River Bridge #250Main Bridge Non-GARVEE Funding

$16.00 MP - RecommenedMajor Projects

Sprague Street Sidewalks to High School BP - Recommended S&DBike/Pedestrian Program

Page 37 of 60Revised November 21, 2013

Page 38: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

PortsmouthWest Main Rd C-2, includes West Main Rd. left turn lanes, Raytheon & Union St. C-2 John Kesson Lane (Middletown) to Locust Avenue (Portsmouth) - 2 miles

$6.50 PM - Recommended FUTPavement Management Program

Page 38 of 60Revised November 21, 2013

Page 39: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

ProvidenceAllen's Avenue Arterial Traffic Signal System

$1.50 TS - RecommendedArterial Traffic Signal Synchronized Systems

Blackstone Valley BikewaySegment 1A - Providence India Point Park to Pitman Street

$1.50 BP - RecommendedBike/Pedestrian Program

Broadway Ramp Overpass (Tobey Street) Bridge #509

$5.00 BR - RecommendedBridge Program

Central Avenue/Sunset Avenue (1R)Atwood Avenue (Route 5) to Killingly Street

PM - RecommendedPavement Management Program

Dean St. Bridge # 776Bridge Rehabilitation with Intersection Improvements

$4.00 BR - RecommendedBridge Program

Downtown Sidewalks - ADA Project

C-3

$2.00 HW - On list to be prioritized by Governor's Commission on Disabilities

Highway Program

Elmwood Avenue Arterial Traffic Signal System

$1.50 FY 2012Arterial Traffic Signal Synchronized Systems

Elmwood Avenue Improvement Project $0.41 EN - RecommendedEnhancement Program

Elmwood Avenue/Broad Street (1R)Cadillac Drive to Service Road No. 7

$6.00 PM - RecommendedPavement Management Program

Fruit Hill Avenue (1R)Manton Ave to Milton St.

$1.00 PM - Recommended FUTPavement Management Program

Page 39 of 60Revised November 21, 2013

Page 40: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

ProvidenceHarbor Junction Bridge #131Harbor Junction Br. carries Elmwood Ave. or as single track of the P&W RR. Includes the bridge and approaches.

$1.50 BR - RecommendedBridge Program

Hardscrabble Square $0.05 EN - RecommendedEnhancement Program

Harris Avenue RR Bridge #510 $6.00 BR - RecommendedBridge Program

Henderson Bridge # 600 RehabilitationBridge and Immediate Approaches

$51.19 BR - Recommended FUTBridge Program

I-195 Pedestrian/Bike BridgeTo be constructed in IWAY Contract 16

$6.00 MP - RecommendedBridge Program

I-95 Resurfacing Contract - 5Route 113 to North of Thurbers Ave. Curve

$20.00 IN - RecommendedInterstate Program

I-95 Resurfacing Contract - 6Westminister Street Overpass to MA State Line

$18.00 IN - RecommendedInterstate Program

India Point Power Lines ProvProvidence

EN - Recommended FUTEnhancement Program

Luongo Square Revitalization $0.80 FY 2012Enhancement Program

Pleasant Valley Parkway Bridge #777Promenade Business District Improvements

$3.50 BR - RecommendedBridge Program

Providence Streetcar $1.50 TR - RecommendedTransit Program

Page 40 of 60Revised November 21, 2013

Page 41: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

ProvidenceProvidence Viaduct Bridge No. 78 Rehabilitation146 Interchange to Atwells Ave

$61.00 MP - RecommenedMajor Projects

Route 146Rt. 95 to Sherman Ave

$6.50 PM - RecommendedPavement Management Program

Route 146 Freeway Guide SignsRoute 146

TS - RecommendedSigning

Route 6/Route 10 Interchange SD - RecommendedStudy & Development Program

Smith Street (1R)Lyndhurst Ave to Rt. 1 (North Main Street)

$2.00 PM - RecommendedPavement Management Program

South Main Street - ADA Project

Smith Street to James Street

$3.50 HW - On list to be prioritized by Governor's Commission on Disabilities

Highway Program

Station Park Enhancements (Phase I complete)Phase II

$1.20 EN - RecommendedEnhancement Program

Thurbers Avenue/Allens Avenue SD - RecommendedStudy & Development Program

US Route 6 Lighting Repairs and ImprovementsUS Route 6

TS - RecommendedLighting

Westminister StreetEmpire Street to Greene Street

SD - RecommendedStudy & Development Program

Page 41 of 60Revised November 21, 2013

Page 42: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

ProvidenceWoonasquatucket Avenue (1R)Smith Street (Route 44) to Fruit Hill Road

$2.50 PM - RecommendedPavement Management Program

Page 42 of 60Revised November 21, 2013

Page 43: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

RichmondCarolina Bridges (#55 & #56)Route 112 over Pawcatuck

$2.00 BR - RecommendedBridge Program

Kingston Road Bridge #403 $2.00 BR - RecommendedBridge Program

Woodville RoadRoute 3 (Main St.) to Switch Road

$3.00 PM - RecommendedPavement Management Program

Page 43 of 60Revised November 21, 2013

Page 44: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

ScituateGainer Dam Stonewall Reconstruction Scituate/Providence Water Supply Board

$0.65 EN - RecommendedEnhancement Program

Hazard Elimination - North (C-3)Hartford Pike and Elmdale

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - North (C-3)Route 6 By-Pass and Route 101

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - North (C-3)Danielson Pike and Chopmist Hill

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - North (C-3)Hartford Ave and Scituate IGA

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - North (C-3)Hartford Ave. and Danielson Pike

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hope Village StreetscapeScituate Preservation Society

$0.50 EN - RecommendedEnhancement Program

Kent Dam Spillway Bridge #84 $2.00 BR - RecommendedBridge Program

Main Street Improvements - Route 115Route 116 (Hope) to Jackson Flat Road

$2.00 HW - RecommendedHighway Program

Rockland/Central/Battery MeetinghouseCentral Pike and Trentown Rd. to Danielson Pike

$2.00 PM - Recommended FUTPavement Management Program

Rt. 12 - Gainer Dam (1R)Gainer Dam (Route 12) @ Scituate Reservoir

$2.00 PM - RecommendedPavement Management Program

Page 44 of 60Revised November 21, 2013

Page 45: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

ScituateUS Rt. 6 - ScituateRt. 102 (Chopmist Hill Road) to Danielson Pike

$2.00 PM - RecommendedPavement Management Program

US Rt. 6 - Scituate/JohnstonI-295 to Danielson Pike

$6.00 PM - RecommendedPavement Management Program

Page 45 of 60Revised November 21, 2013

Page 46: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Smithfield2013 State Traffic Commission C-4Douglas Pike at Branch Pike

TS - RecommendedState Traffic Commission (STC)

2013 State Traffic Commission C-4Douglas Pike at Harris Road

TS - RecommendedState Traffic Commission (STC)

2013 State Traffic Commission C-4Douglas Pike at Thurber Blvd.

TS - RecommendedState Traffic Commission (STC)

Capron Bridge #792Bridge and Immediate approaches

$2.00 BR - RecommendedBridge Program

Cedar Swamp Road - Rt. 5Route 44 to Route 116

SD - RecommendedStudy & Development Program

Hazard Elimination North - Contract 3Putnam Pike and Esmond Street

TS - RecommendedHighway Safety Improvement Program (HSIP)

I-295 Safety and Lighting Contract - 2ERoute 7 to MA State Line

$4.00 IN - Recommended FUTInterstate Program

Route 146 Freeway Guide SignsRoute 146

TS - RecommendedSigning

Rt. 44 (1R)C-3B - RIDOT Maintenance Facility to West Greenville

$3.75 PM - RecommendedPavement Management Program

Page 46 of 60Revised November 21, 2013

Page 47: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

South Kingstown2012 State Traffic Commission C-2Main St. at Columbia St./Woodruff Ave.

TS - RecommendedState Traffic Commission (STC)

Bridgetown RoadUS Rt. 1 to Rt. 1A

$1.00 PM - Recommended FUTPavement Management Program

Flagg RoadPlains Road to Old North Road

$1.00 PM - RecommendedPavement Management Program

Hazard Elimination - SouthKingstown Rd. at Curtis Corner/Saugtucket

TS - RecommendedHighway Safety Improvement Program (HSIP)

High StreetKingstown Road to Main Street

$2.50 PM - RecommendedPavement Management Program

Kingston Station Maintenance $0.10 EN - RecommendedEnhancement Program

Kingston Station Railroad Bridge #372 $5.75 BR - RecommendedBridge Program

Railroad Museum Project $0.28 EN - RecommendedEnhancement Program

Railroad Signal Tower $0.46 EN - RecommendedEnhancement Program

Rt. 108 (Kingstown Road) and Old Tower Hill Road

Intersection of Old Tower Hill Road at Rt. 1 to Old Mountain Field on Rt. 108

$1.26 HW - On list to be prioritized by Governor's Commission on Disabilities

Highway Program

Page 47 of 60Revised November 21, 2013

Page 48: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

South KingstownRt. 138 from Rt.108 to Rt. 2 - Rehabilitate and Improve - C-1 (2012) Rt. 108 to Rt. 2

$17.50 HW - RecommendedHighway Program

Saugatucket River Walkway - Phase II

South Kingstown

$0.15 EN - Recommended, $0.47 programmed in Future

Enhancement Program

URI/South County Bike Path Connector $1.40 BP - Recommended S&DBike/Pedestrian Program

US Route 1 - Tower Hill RoadRt. 108 to Government Center

$1.50 PM - RecommendedPavement Management Program

Page 48 of 60Revised November 21, 2013

Page 49: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Tiverton2015 State Traffic Commission C-8William S. Canning Blvd. at Stafford Rd.

TS - RecommendedState Traffic Commission (STC)

East RoadRt. 179 to Rt. 81

$0.70 PM - Recommended FUTPavement Management Program

Fish Road # 2Rt. 177 (Bulgarmarsh Rd.) to Rt. 24

$1.00 PM - RecommendedPavement Management Program

Fish Road #1Rt. 24 to Mass line

$1.20 PM - RecommendedPavement Management Program

Hazard Elimination - Newport CountyBulgarmarsh, Crandall and Stafford

TS - RecommendedHighway Safety Improvement Program (HSIP)

Highland Road/Bridgeport RoadRt. 77 to Rt. 77

$0.80 PM - Recommended FUTPavement Management Program

Main Road ReconstructionRiverside Drive to Nanaquaket Rd.

SD - RecommendedStudy & Development Program

Old Stone Bridge $2.33 EN - RecommendedEnhancement Program

Route 24 Freeway Guide SignsRoute 24

TS - RecommendedSigning

Sakonnet River Bridge #250Main Bridge Non-GARVEE Funding

$16.00 MP - RecommenedMajor Projects

Tiverton Bike Path BP - Recommended S&DBike/Pedestrian Program

Page 49 of 60Revised November 21, 2013

Page 50: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

VariousBlackstone Navigation $0.06 FY 2012Enhancement Program

Page 50 of 60Revised November 21, 2013

Page 51: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

WarrenBarrington Warren Bike Path Bridges Nos. 837 & 838 Replacement

BR - Recommended FUTBridge Program

East Bay Bike Path Extension $2.00 BP - RecommendedBike/Pedestrian Program

Hazard Elimination - Bristol CountyMetacom Ave (Rte 136) at Child St.

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave (Rte 136) at Fatima Dr.

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave (Rte 136) at Vernon St

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave (Rte 136) at Ocean State Plaza

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave (Rte 136) at Rosa Blvd.

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave (Rte 136) at Franklin St/Libby Ln

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Bristol CountyMetacom Ave (Rte 136) at Seymour St/Laurel Ln

TS - RecommendedHighway Safety Improvement Program (HSIP)

Main Street Sidewalks

From Warren Bridge to Park Street

HW - On list to be prioritized by Governor's Commission on Disabilities

Highway Program

Page 51 of 60Revised November 21, 2013

Page 52: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

WarrenMarket Street Curb and Sidewalk Improvements

From Route 136 into Main Street, and at East Bay Bike Path crossing

HW - On list to be prioritized by Governor's Commission on Disabilities

Highway Program

Rt. 114 (1R)

Dyer Ave (Warren) to Washington St. (Bristol)

$3.00 PM - Recommended, sidewalks only

Pavement Management Program

Water Street Sidewalk and Streetscape $0.81 EN - RecommendedEnhancement Program

Page 52 of 60Revised November 21, 2013

Page 53: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Warwick2012 State Traffic Commission C-2Bald Hill Road at Universal Blvd.

TS - RecommendedState Traffic Commission (STC)

2013 State Traffic Commission C-4Post Road at Fairfax Drive

TS - RecommendedState Traffic Commission (STC)

2015 State Traffic Commission C-7

Warwick Interlink - Post Road & Airport Connector Improvements

$0.50 TS - Recommended, Study Only

State Traffic Commission (STC)

Airport Connector Signing ImprovementsAirport Connector

TS - RecommendedSigning

Apponaug Circulator Bypass $27.70 HW - RecommendedHighway Program

Conimicut Shoals Lighthouse Warwick

$0.56 EN - Recommended FUTEnhancement Program

Division Street Bridge #760 $3.00 BR - RecommendedBridge Program

Hazard Elimination - Warwick Ramps C-5West Shore and Sandy Lane/Strawberry Field

TS - RecommendedHighway Safety Improvement Program (HSIP)

Hazard Elimination - Warwick Ramps C-5Route 37 EB off-ramp and Post Road

TS - RecommendedHighway Safety Improvement Program (HSIP)

I-95 Resurfacing Contract - 4Route 2 to Route 113

$10.00 IN - RecommendedInterstate Program

I-95 Resurfacing Contract - 5Route 113 to North of Thurbers Ave. Curve

$20.00 IN - RecommendedInterstate Program

Page 53 of 60Revised November 21, 2013

Page 54: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

WarwickMaskerchugg River Bridge Multi-Use Path

$0.50 BP - RecommendedBike/Pedestrian Program

Meshanticut Interchange, Bridge Contract #3Bridges # 820, # 821, # 245, # 246, # 490, # 491 bridges carrying Rte 2 and West Natick Rd. in Warwick, near the malls.

BR - RecommendedBridge Program

New London AvenueCenterville Road (Rt. 117) to Providence St. (Rt 115)

$5.19 HW - Recommended FUTHighway Program

Pawtuxet Riverwalk BP - Recommended S&DStudy & Development Program

Post Road (1R)South Atlantic Ave. to Warwick Ave.

FY 2012Pavement Management Program

Post Road ReconstructionC-1 Franklin Rd to Austin Rd. Shopping center Intersection outside project limits added to the project.

$12.00 HW - Recommended FUTHighway Program

Route 1 (Post Road)Coranado to Rt. 1A (Post Rd)

$2.50 PM - Recommended FUTPavement Management Program

Rt. 2 Bald Hill/New LondonWest Natick Rd. to Rt. 37

$2.50 PM - RecommendedPavement Management Program

Rt. 37Natick Ave to US Rt. 1 (Post Rd.)

$3.00 PM - RecommendedPavement Management Program

Rt. 5 C-1C-1 Mayfield Ave. to Rt. 95

$4.50 HW - RecommendedHighway Program

Page 54 of 60Revised November 21, 2013

Page 55: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

WarwickSouth County Freeway Bridge #686 $1.00 BR - RecommendedBridge Program

Warwick Avenue Arterial Traffic Signal SystemWarwick Avenue

TS - RecommendedArterial Traffic Signal Synchronized Systems

Warwick Interlink - Coronado Road ImprovementsPost Rd. to Amtrack Railroad Bridge

SD - RecommendedStudy & Development Program

Page 55 of 60Revised November 21, 2013

Page 56: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

West GreenwichBig River Bridge #34 $1.00 BR - RecommendedBridge Program

Victory Highway Bridge # 589Bridge and Immediate Approaches

$5.00 BR - RecommendedBridge Program

Page 56 of 60Revised November 21, 2013

Page 57: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

West Warwick2013 State Traffic Commission C-4319 Providence Street - install wheelchair ramps at crosswalks

TS - RecommendedState Traffic Commission (STC)

Arterials - Contract 2 (US Route 1, RI Route 3)Tina Drive/Cochran St. to Main St./ East Greenwich Ave.

TS - RecommendedArterial Traffic Signal Synchronized Systems

New London AvenueCenterville Road (Rt. 117) to Providence St. (Rt 115)

$5.19 HW - Recommended FUTHighway Program

Page 57 of 60Revised November 21, 2013

Page 58: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

Westerly2012 State Traffic Commission C-2Church St. at the Bradford School/ Ste. Vincent DePaul Church

TS - RecommendedState Traffic Commission (STC)

2014 State Traffic Commission - Contract 6Reconstruction of Airport/Winnepaug Rd. Intersection

$0.50 TS - Recommended (Study Only)

State Traffic Commission (STC)

Atlantic Avenue Reconstruction and Bike PathWinnepaug Rd. to Weekapaug Rd.

SD - RecommendedStudy & Development Program

Bay Street PM - Recommended (Amendment 1)

Pavement Management Program

Canal Street/White Rock RoadRailroad Avenue to High Street/Springbrook Road

$1.44 PM - RecommendedPavement Management Program

Canal Street/White Rock Road $0.20 EN - RecommendedEnhancement Program

Church Street Sidewalk Construction

Bradford Rd. to Quarry Rd.

$0.31 HW - On list to be prioritized by Governor's Commission on Disabilities

Highway Program

Elm St., Beach Street and Railroad Avenue (1R)Elm St - From State St to Broad St. Beach St - From Main St to Route 1A. Railroad Ave - From Canal St to Route 3. Railroad Ave - From Canal St to Route 3.

$3.00 FY 2012Pavement Management Program

Potter Hill RoadHigh St. to Hopkinton T/L

$1.50 PM - Recommended FUTPavement Management Program

Page 58 of 60Revised November 21, 2013

Page 59: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

WoonsocketBlackstone Bikeway Enhancements $0.50 EN - RecommendedEnhancement Program

Blackstone River Bicycle FacilitySegment 8B - Truman Drive to Mass S/L

BP - Recommended S&DBike/Pedestrian Program

Blackstone River Bicycle FacilitySegment 8A - Davison St. to Truman Drive

BP - RecommendedBike/Pedestrian Program

Commuter Rail Feasibility Study $1.00 TR - RecommendedTransit Program

Park East Drive $2.90 PM - Recommended FUTPavement Management Program

Privilege Street Bridge BR - Recommended FUTBridge Program

River Street Bridge $2.27 BR - Recommended FUTBridge Program

Sayles Street Bridge $2.41 BR - Recommended FUTBridge Program

South Main Street Bridge $9.27 BR - Recommended FUTBridge Program

Woonsocket Bikeway Signage BP - General line item for signage included

Bike/Pedestrian Program

Woonsocket Depot Visitor Services Enhancement

$0.69 EN - RecommendedEnhancement Program

Page 59 of 60Revised November 21, 2013

Page 60: Projects Included in RI 2013 -2016 Transportation ... · Revised November 21, 2013 Page 1 of 60. Project Estimated Funding (in millions) Recommendation Projects Included in RI 2013

Project Estimated Funding

(in millions) Recommendation

Projects Included in RI 2013 -2016 Transportation Improvement Program

TIP Program

WoonsocketWoonsocket River Landing/River Launch $0.39 EN - RecommendedEnhancement Program