Projects in Permitting and Construction Projects Larger than 20 MW
description
Transcript of Projects in Permitting and Construction Projects Larger than 20 MW
Projects in Permitting and Construction
Projects Larger
than 20 MW
Imperial, Kern, LA, Orange, Riverside and San Bernardino Counties, as of Oct 4, 2012
Photovoltaics
Wind
Power Tower
Solar Troughs
Natural Gas
Geothermal
Wind/PV
Hydrogen
Solar Thermal/Hybrid
Biomass
- 5,000 10,000 15,000 20,000 25,000
107 PROJECTS20,024MW
37 PROJECTS 6,353 MW
11 PROJECTS4,882 MW
6 PROJECTS2,902 MW
5 PROJECTS2,495 MW
10 PROJECTS1,238 MW
2 PROJECTS650 MW
1 PROJECT390 MW
1 PROJECT50 MW
1 PROJECT27 MW
Projects in Permitting and ConstructionProjects Larger than 20 MW
(As of Oct 4, 2012 in Imperial, Kern, LA, Orange, Riverside and San Bernardino Counties)
Total Projects > 20MW: 181Total MW: 39,011
ENERGY SOURCEHUDSON RANCH
49MW - GEOTHERMALConstruction Workforce: 175-200
Pattern EnergyOCOTILLO EXPRESS WIND FARM
~315MW - WINDPEAK Workforce: 350
Full-Time O&M Workforce: 27
EdFAVALON WIND PROJECT
255-300 MW - WINDConstruction FT Workforce: 250
AES SolarMOUNT SIGNAL SOLAR
250 MW - PVConstruction FT Workforce: 300Full-Time O&M Workforce: 30
WORKFORCE SIZE EXAMPLES FOR CASE STUDY PROJECTS IN
IMPERIAL, RIVERSIDE, KERN
Photovoltaics
Wind
Solar Troughs
Biogas
- 200 400 600 800 1,000 1,200 1,400 1,600 1,800
170 PROJECTS1,672 MW
13 PROJECTS58 MW
2 PROJECTS 25 MW
3 PROJECTS4 MW
Megawatts
Projects in Permitting and ConstructionProjects Smaller than 20 MW
(As of Oct 4, 2012 in Imperial, Kern, LA, Orange, Riverside and San Bernardino Counties)
Total Projects < 20MW: 189Total MW: 1,759