Project: Victoria Cross Residential Development
Transcript of Project: Victoria Cross Residential Development
Project: Victoria Cross Residential Development
Report Title: Daylight, Sunlight and Overshadowing
Report By: Passive Dynamics Sustainability Consultants
Date of Issue: 09/04/2021
Contact: [email protected]
Client: Bellmount Developments Limited
Revision: Date: Revision Details Report by: Approved by:
00 22/03/2021 Issued in draft for design
team comment JT CMcC
01 09/04/2021 Issued for Planning JT CMcC
Page 2 of 73
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................................ 3
1. INTRODUCTION ..................................................................................................................... 7
2. DEFINITIONS .......................................................................................................................... 8
3. GUIDANCE DOCUMENTS REFERENCED DURING THIS STUDY ........................................ 9
4. SIMULATION MODEL IMAGES ............................................................................................ 10
5. SIMULATION SOFTWARE DESCRIPTION .......................................................................... 13
6. ASSESSMENT METHODOLOGY ......................................................................................... 14
7. VSC RESULTS ...................................................................................................................... 18
8. AVERAGE DAYLIGHT FACTOR RESULTS – PROPOSED SCHEME ................................. 25
9. SUNLIGHT RESULTS ........................................................................................................... 46
APPENDIX A | OVERSHADOWING IMAGES .............................................................................. 57
APPENDIX B | VERTICAL SKY COMPONENT RESULTS (PROPOSED DEVELOPMENT) ....... 66
Page 3 of 73
EXECUTIVE SUMMARY
Assessment
Type Results Summary
Impact of
loss of
daylight to
neighbouring
properties
The Vertical Sky Component (VSC) Analysis is covered in Section 8.0 of this report.
The results are as follows;
A simulation was run to quantify any reduction in VSC of the surrounding buildings
resulting from the proposed development massing. Where the VSC is greater than
27% reasonable daylighting levels are available according to the BRE Industry
standard. Where the VSC is found to be less than 27% but the comparison between
the “before and after scenarios” is less than a 20% reduction, daylighting is unlikely to
be significantly affected / noticed.
Our simulation study outlines the effect that the proposed development has on the
windows of its surrounding buildings. While the VSC has been reduced in the
surrounding buildings according to the BRE 209 Guidance Document, it was found that
a VSC reduction would be unavoidable for any substantially sized development on this
site.
An iterative analysis was carried out to determine the VSC reduction experienced in
the surrounding buildings at varying heights for the proposed development. It was
found that the VSC values of the surrounding buildings would largely fail to meet the
criteria set out in the BRE 209 Guidance Document even if the proposed development
height was to be reduced from 10 storeys (Maximum height – Block A) to 5 storeys
across all 3 Blocks.
In order to further assess the potential for maintaining the VSC levels of the
surrounding buildings, the proposed development was reduced again to equal the
height of its closest adjacent building (Surrounding Building 2). It was found that the
majority of openings of Surrounding Building 2 and Surrounding Building 3 still did not
meet the desired VSC criteria after this reduction. This scenario is presented in detail
in Section 7 of this report.
As a result of this analysis, it is our understanding that any level of substantial
development to this site would adversely affect the VSC experienced in the
Page 4 of 73
surrounding buildings (as per BRE 209) due to their relative heights and proximity to
the site.
This conclusion is in line with the note below, taken from the BRE 209 Guidance
Document:
It should also be noted that a number of the buildings that will experience a reduction
in VSC due to the proposed development are student accommodation blocks. This
pattern of use is less sensitive to daylight than residential usage, as the length of tenure
is temporary. Furthermore, the majority of spaces affected in these student
accommodation blocks are bedrooms which have a less frequent occupancy than a
living area during normal daylit hours.
Similar student accommodation projects have been assessed on a case by case basis
and a flexible approach has been adopted, particularly in constrained inner urban sites
where a degree of impact is unavoidable.
Consideration should be given to the fact that the comparison being made is between
a vacant, under-utilised existing site and the proposed development, which is inevitably
going to have some form of an impact given the circumstances. The planning authority
should consider applying flexibility with regard to BRE standards to balance the
objective of achieving urban regeneration with any potential impacts.
Page 5 of 73
Average
Daylight
Factor within
the proposed
apartments
Average Daylight Factor results are covered in detail in Section 9.0 of this report. A
summary of the results can be seen below.
Minimum recommended Average Daylight Factors (ADF) are:
• Bedrooms - 1.00 %
• Living Rooms - 1.50 %
Calculated ADF results are as follows:
• 72.9% of bedrooms achieve an ADF of ≥ 1.0%
• 92.5% of the Living rooms achieve an ADF of ≥ 1.5%
Sunlight
availability
within the
amenity
space
Sunlight availability results are covered in detail in Section 9 of this report. Both the
existing neighbouring amenity areas and existing surrounding buildings were analysed
as part of this study along with the openings of the proposed development itself. This
included the adjacent amenity areas at The Crow’s Nest located north of the proposed
development.
BRE Guidelines recommend that for an amenity space to appear adequately sunlit
throughout the year, at least half of the amenity space should receive at least two hours
of sunlight on the design day, March 21st. If, as a result of a new development, an
existing garden or amenity area does not meet the above, and the area which can
receive two hours of sun on March 21st is less than 0.8 times its former value, then the
loss of sunlight is likely to be noticeable.
The analysis confirms that the amenity areas of The Crow’s Nest achieve upward of 2
hours of sunlight on the design day (21st March) over at least half of the amenity space.
(See Section 10 of this report).
The guidance document also states that rooms will appear reasonably sunlit provided:
− at least one main window wall faces within 90o of due south and
− the centre of at least one window to a main living room can receive 25% of
annual probably sunlight hours, including at least 5% of annual probably
sunlight hours in the winter months between 21st September and 21st March.
Page 6 of 73
1. The openings of the proposed building living spaces that face within 90o of due
south largely receive at least 25% of annual probable sunlight hours and at least
5% of annual probable sunlight hours during winter months.
2. The openings of the surrounding building living spaces that face within 90o of due
south largely receive at least 25% of annual probably sunlight hours and at least
5% of annual probable sunlight hours during winter months.
This information is presented in detail in Section 9 of this report.
Page 7 of 73
1. INTRODUCTION
Passive Dynamics Sustainability Consultants has prepared this Daylight, Sunlight and
Overshadowing report for and on behalf of Bellmount Developments Limited to accompany the
planning application for the proposed Residential Development at Victoria Cross, Cork. The
scope of the assessment was to determine the following:
• Impact of loss of daylight to neighbouring properties
• Average Daylight Factor within the proposed apartments
• Sunlight availability within the amenity space
Daylight and Sunlight calculations have been carried out in accordance with BRE’s ‘Site Layout
Planning for Sunlight and Daylight: A Guide to Good Practice’ (2011) (herein referred to as the
“BRE Guide”) by P J Littlefair, which is accepted as good practice by Planning Authorities. The
Design Standards for New Apartments - Guidelines for Planning Authorities (March 2018) were
also considered as part of this study.
The BRE Guide gives advice on site layout to achieve provision of daylight and sunlight both
within buildings, and in the open spaces between them. In general, it aims to aid designers in
considering the relationship between new and existing buildings to ensure that each retains the
potential to achieve good daylighting and sunlight levels.
The BRE Guide states in the introduction that: “The guide is intended for building designers and
their clients, consultants and planning officials. The advice given here is not mandatory and
the guide should not be seen as an instrument of planning policy; its aim is to help rather
than constrain the designer. Although it gives numerical guidelines, these should be
interpreted flexibly since natural lighting is only one of many factors in site layout design.
In special circumstances the developer or planning authority may wish to use different target
values. For example, in a historic city centre, or in an area with modern high-rise buildings, a
higher degree of obstruction may be unavoidable if new developments are to match the height
and proportions of existing buildings”. It is therefore important that the guidelines that exist
in relation to daylight and sunlight are read in the correct context and are not viewed as
mandatory requirements.
Page 8 of 73
2. DEFINITIONS
The technical definitions that are referred to in this report are explained below.
BRE Building Research Establishment.
Vertical Sky
Component (VSC)
The Vertical Sky Component (VSC) is the “Ratio of that part of illuminance, at
a point on a given vertical plane that is received directly from a CIE standard
overcast sky, to illuminance on a horizontal plane due to an unobstructed
hemisphere of this sky. Usually the “given vertical plane” is the outside of a
window wall. The VSC does not include reflected light, either from the ground
or from other buildings.
E= illuminance on an unobstructed plane.
e= illuminance at point in interior
Sky Component =e/E (often expressed as a percentage)
Vertical Sky Component = v/E
CIE Standard
Overcast Sky
A completely overcast sky for which the ratio of its luminance Ly at an angle
of elevation y above the horizontal to the luminance Lz at the zenith is given
by:
The CIE standard overcast sky is darkest at the horizon and brightest at the
zenith (vertically overhead).
Average Daylight
Factor (ADF)
The ratio of total daylight flux incident on a reference area to total area of
reference area, expressed as a percentage of outdoor illuminance on a
horizontal plane due to an unobstructed hemisphere of sky of assumed or
known luminance distribution. Thus a 1% ADF would mean that the average
indoor illuminance would be one hundredth the outdoor unobstructed
illuminance.
Page 9 of 73
3. GUIDANCE DOCUMENTS REFERENCED DURING THIS STUDY
This Daylight, Sunlight and Overshadowing Assessment has been carried out in accordance with
the following best practice standard as outlined by the BRE and cross referenced by the
Department of Housing, Planning and Local Government.
This document gives advice on site layout
planning to achieve good sun lighting and
daylighting, both within buildings and in the open
spaces between them. This authoritative
document is widely used to provide advice
during the planning and design stages of building
development in the UK and Ireland.
Guidance is given on site layout for good sun
lighting and daylighting; safeguarding of daylight
and sunlight within existing buildings nearby; and
the protection of daylighting of adjoining land for
future development.
Design Standards for New Apartments -
Guidelines for Planning Authorities (March
2018). This document outlines the design guides
that should be used to assess daylight provision
for new apartments.
It is noted that BS 8206-2:2008: Lighting for buildings - Part 2: Code of practice for daylighting was recently replaced with BS EN
17037:2018 Daylight in Buildings. However, given that the Sustainable Urban Housing: Design Standards for New Apartments
Guidelines for Planning Authorities refer to the BS 8206-2:2008 and not to BS EN 17037:2018, BS 8206:2008 has been referenced
in the preparation of this report.
Page 10 of 73
4. SIMULATION MODEL IMAGES
The following images show the simulation model that was constructed to analyse the daylight,
sunlight and overshadowing performance for this proposed scheme.
Above: Simulation model image of the proposed development from the South West.
Above: Simulation model image of the proposed development from the South East.
Page 11 of 73
Above: Simulation model image of the proposed development from the North West.
Above: Simulation model image of the proposed development from the North East.
Page 12 of 73
Above: Simulation model image of the proposed development from the West with the sun path
during the summer.
Page 13 of 73
5. SIMULATION SOFTWARE DESCRIPTION
IES VIRTUAL ENVIRONMENT
IES Virtual Environment is the world’s leading building performance analysis tool. The software
provides an in-depth suite of integrated analysis tools which allow an integrated design approach
and highly detailed results.
IES VIRTUAL ENVIRONMENT - RADIANCE
Radiance is a software package developed by the Lighting Systems Research group at the
Lawrence Berkeley Laboratory in California, USA. Radiance was developed as a research tool
for predicting the distribution of visible radiation in illuminated spaces.
IES VIRTUAL ENVIRONMENT - SUNCAST
SunCast enables engineers to perform shading and solar insolation analysis studies and can
generate images and animations. SunCast generates shadows and internal solar insolation from
any sun position defined by date, time, orientation, site latitude and longitude. SunCast can be
used at any stage of the design process from a model created by the IES Model Builder.
Page 14 of 73
6. ASSESSMENT METHODOLOGY
DAYLIGHT ASSESSMENT – NEIGHBOURING PROPERTIES
The guidelines given within the BRE Guide are intended for use for rooms in adjoining dwellings
where daylight is required, including living rooms, kitchens, and bedrooms. Windows to
bathrooms, toilets, storerooms, circulation areas and garages need not be analysed. The
guidelines may also be applied to any existing non-domestic buildings where the occupants have
a reasonable expectation of daylight; this would include schools, hospitals, hotels and hostels,
small workshops, and some offices. The surrounding buildings are numbered below so that they
could be easily referenced during the analysis.
It should be noted that Surrounding Block 5 (numbered above) is a commercial building (bicycle
shop) and not a residential block. For this reason, the openings of Surrounding Block 5 were not
assessed as part of this analysis.
To analyse the effects of the proposed development on the adjacent applicable buildings in the
immediate surrounding area, a Vertical Sky Component (VSC) simulation was carried out using
the IES Radiance software package. For the VSC definition refer to Section 2 of this report (page
8). The VSC was calculated with the proposed development in place using a simulation model.
In accordance with Section 2.2 of the BRE Guide, where a VSC of 27% or greater is achieved,
“enough skylight should still be reaching the existing building” and therefore daylighting will not
Page 15 of 73
be significantly affected. The BRE Methodology is summarised below. Where a VSC less than
27% is achieved further analysis is required to determine the likely daylight levels that will be
achieved in affected spaces. Any reductions in VSC should be limited to 20%.
Methodology (as referenced in Section 2.2 of the BRE Guide)
Above: Decision chart / methodology used to quantify the impact of a new development
on daylight levels of nearby buildings / dwellings.
Page 16 of 73
DAYLIGHT ASSESSMENT – PROPOSED DEVELOPMENT
BRE’s 2011 guidance document Site Layout Planning for Daylight and Sunlight states the
following with respect to Average Daylight Factors (ADF).
Above: From BRE’s 2011 guidance document Site Layout Planning for Daylight and Sunlight
Therefore, in line with this guidance, minimum recommended average daylight factors are:
• Bedrooms - 1.00 %
• Living Rooms / Kitchen - 1.50 %
The following assumptions have been applied in this study:
• Sky Conditions: Standard CIE overcast sky
• Time (24hr): 12:00
• Date: 21 September
• Working Plane: 0.85m
The following surface reflectance's were applied in this study:
Material Surface Reflectance Value Glass/Window Details
External Wall 0.82 -
Internal Partition 0.82 -
Roof (external) 0.20 -
Ground (external) 0.20 -
Floor/Ceiling (Floor) 0.40 -
Floor/Ceiling (Ceiling) 0.88 -
Glass Light transmittance - 70%
Window Frame Thickness - 50 mm
Page 17 of 73
SUNLIGHT ASSESSMENT – NEIGHBOURING AMENITY SPACE
BRE Guidelines recommend that in order for an amenity space to appear adequately sunlit
throughout the year, at least half of the amenity space should receive at least two hours of
sunlight on the design day, March 21st. If, as a result of a new development, an existing garden
or amenity area does not meet the above, and the area which can receive two hours of sun on
March 21st is less than 0.8 times its former value, then the loss of sunlight is likely to be
noticeable.
Above: BRE Guidance in relation to protecting Sunlight in Gardens, Open Spaces and
Amenity spaces.
Page 18 of 73
7. VSC RESULTS
For the BRE Guidance on Vertical Sky Component refer to pages 14 and 15 of this report.
Above: North and South views. Windows shown in green have achieved a VSC of ≥ 27%. If the VSC is greater than 27% then enough skylight should be reaching the window of the existing buildings. The windows in yellow achieve a VSC of less than 27% but the new VSC is greater than or equal to 80% of its initial value pre-development. The windows in red achieve a VSC of less than 27%.
Page 19 of 73
Above: East and West view. Windows shown in green have achieved a VSC of ≥ 27%. If the VSC is greater than 27% then enough skylight should be reaching the window of the existing buildings. The windows in yellow achieve a VSC of less than 27% but the new VSC is greater than or equal to 80% of its initial value pre-development. The windows in red achieve a VSC of less than 27%.
A full breakdown of the VSC results for each opening analysed can be found in Appendix B
of this report.
Page 20 of 73
As shown above (and tabulated in Appendix B) a number of the windows analysed do not meet
the desired criteria as outlined in the BRE 209 Guidance Document. However, further analysis
was carried out to determine if any level of substantial development could occur on this site
without adversely affecting the VSC result of the neighbouring properties.
As part of this analysis, multiple different configurations of block heights/layouts were assessed.
These alternative layouts included reductions of each of the 3 blocks as well as the removal of
Block C entirely, however, these reductions in the scale of the project lead to very minimal
improvement to the VSC results of the surrounding buildings.
It was found that significant improvements to the VSC of the surrounding buildings only occur if
the proposed development is reduced from 10 storeys (maximum height) to 5 storeys (proposed
height of the development’s shortest block – Block C) across all 3 blocks. Even still, this
arrangement would not lead to full compliance with the BRE 209 Guidance Document for every
surrounding building, with Surrounding Buildings 2 and 3 still largely failing to meet the criteria.
Imagery from this analysis can be seen below.
Page 21 of 73
Above: North and South views. As outlined above, surrounding Buildings 2 and 3 still have large portions of non-compliant windows as per the BRE 209 Guidance Document. Some openings of the other surrounding buildings are also yet to comply even with significant height reductions imposed on the proposed development.
Page 22 of 73
Above: East and West view. As outlined above, surrounding Buildings 2 and 3 still have large portions of non-compliant windows as per the BRE 209 Guidance Document. Some openings of the other surrounding buildings are also yet to comply even with significant height reductions imposed on the proposed development.
In order to further assess the potential for maintaining the VSC levels of the surrounding
buildings, the proposed development was reduced again to equal the height of its closest
adjacent building (Surrounding Building 2). It was found that the majority of openings of
Surrounding Building 2 and Surrounding Building 3 still did not meet the desired VSC criteria
after this reduction. This can be seen below, with the west façade of Surrounding Building 2 and
Page 23 of 73
the north Façade of Surrounding Building 3 showing the majority of the windows fail to meet the
desired VSC criteria (shown in red):
Above: Surrounding Buildings 2 and 3 showing majority of windows failing to meet the desired
criteria with the development reduced to match the height of Surrounding Building 2.
Page 24 of 73
It should also be noted that a number of the buildings that will experience a reduction in VSC
due to the proposed development are student accommodation blocks. This pattern of use is less
sensitive to daylight than residential usage, as the length of tenure is temporary. Furthermore,
the majority of spaces affected in these student accommodation blocks are bedrooms which
have a less frequent occupancy than a living area during normal daylit hours.
This analysis outlines the reality that any substantial development on this site would have an
adverse effect on the VSC of nearby properties. This is to be expected in such an area due to
the neighbouring buildings’ relative heights and proximity to the site.
Consideration should be given to the fact that the comparison being made is between a vacant
existing, under-utilised site and the proposed development, which is inevitably going to have
some form of an impact given the circumstances.
Flexibility regarding BRE standards should be applied to balance the objective of achieving
urban regeneration with any potential impacts.
Page 25 of 73
8. AVERAGE DAYLIGHT FACTOR RESULTS – PROPOSED SCHEME
The images below show the simulation model with bedrooms colour coded based on their ADF
performance.
ADF ≥ 1.00
0.99 ≥ ADF ≥ 0.80
0.79 ≥ ADF ≥ 0.60
0.59 ≥ ADF ≥ 0.40
ADF ≤ 0.39
Above: Legend
Above: Bedroom ADF results of the proposed development from the West.
Page 26 of 73
Above: Bedroom ADF results of the proposed development from the South.
Above: Bedroom ADF results of the proposed development from the South East.
Page 27 of 73
Above: Bedroom ADF results of Block A from the East (Blocks B and C removed for clarity).
Above: Bedroom ADF results of Blocks B and C from the West (Block A removed for clarity).
The results for each individual space tested are tabulated below.
Page 28 of 73
Ground Floor Plan
Ground Floor ADF Results
Reference Number
Room Name Room Activity
External Window
Area (m2) % ADF
Achieves the BRE Best Practice
Guidelines
1 L00: B-001_Bedroom 01 Bedroom 3.24 2.30 Yes
2 L00: B-001_Bedroom 02 Bedroom 3.24 2.87 Yes
3 L00: B-001_Bedroom 03 Bedroom 3.24 2.47 Yes
4 L00: B-001_Bedroom 04 Bedroom 3.24 1.87 Yes
5 L00: B-001_Living Living 10.56 5.10 Yes
6 L00: B-002_Bedroom 01 Bedroom 3.24 0.14 No
7 L00: B-002_Bedroom 02 Bedroom 3.24 0.11 No
8 L00: B-002_Bedroom 03 Bedroom 3.24 0.50 No
9 L00: B-002_Bedroom 04 Bedroom 3.24 0.41 No
10 L00: B-002_Bedroom 05 Bedroom 3.24 0.41 No
11 L00: B-002_Bedroom 06 Bedroom 3.24 0.38 No
12 L00: B-002_Living Living 2.04 0.84 No
Page 29 of 73
Level 01 Plan
Level 01 ADF Results
Reference Number
Room Name Room Activity
External Window
Area (m2) % ADF
Achieves the BRE Best Practice
Guidelines
1 L01: A-101_Bedroom 01 Bedroom 3.24 2.5 Yes
2 L01: A-101_Bedroom 02 Bedroom 3.24 2.82 Yes
3 L01: A-101_Bedroom 03 Bedroom 3.24 2.74 Yes
4 L01: A-101_Bedroom 04 Bedroom 3.24 2.15 Yes
5 L01: A-101_Bedroom 05 Bedroom 3.24 0.39 No
6 L01: A-101_Bedroom 06 Bedroom 3.24 0.41 No
7 L01: A-101_Bedroom 07 Bedroom 3.24 0.39 No
8 L01: A-101_Bedroom 08 Bedroom 3.24 0.46 No
9 L01: A-101_Living Living 24.57 4.19 Yes
10 L01: A-102_Bedroom 01 Bedroom 3.24 2.76 Yes
11 L01: A-102_Bedroom 02 Bedroom 3.24 2.64 Yes
Page 30 of 73
Reference Number
Room Name Room Activity
External Window
Area (m2) % ADF
Achieves the BRE Best Practice
Guidelines
12 L01: A-102_Bedroom 03 Bedroom 3.24 2.57 Yes
13 L01: A-102_Living Living 4.44 2.39 Yes
14 L01: A-103_Bedroom 01 Bedroom 3.24 2.6 Yes
15 L01: A-103_Bedroom 02 Bedroom 3.24 3.07 Yes
16 L01: A-103_Bedroom 03 Bedroom 3.24 3.03 Yes
17 L01: A-103_Bedroom 04 Bedroom 3.24 0.35 No
18 L01: A-103_Bedroom 05 Bedroom 3.24 0.16 No
19 L01: A-103_Bedroom 06 Bedroom 3.24 0.14 No
20 L01: A-103_Bedroom 07 Bedroom 3.24 0.19 No
21 L01: A-103_Bedroom 08 Bedroom 3.24 0.21 No
22 L01: A-103_Living Living 31.08 6.61 Yes
23 L01: B-101_Bedroom 01 Bedroom 5.28 0.27 No
24 L01: B-101_Bedroom 02 Bedroom 3.24 0.34 No
25 L01: B-101_Bedroom 03 Bedroom 3.24 0.18 No
26 L01: B-101_Bedroom 04 Bedroom 3.24 1.14 Yes
27 L01: B-101_Bedroom 05 Bedroom 3.24 1.08 Yes
28 L01: B-101_Bedroom 06 Bedroom 3.24 0.72 No
29 L01: B-101_Bedroom 07 Bedroom 3.24 0.67 No
30 L01: B-101_Bedroom 08 Bedroom 3.24 0.66 No
31 L01: B-101_Living Living 14.7 1.3 Marginally
below target value
32 L01: B-102_Bedroom 01 Bedroom 3.24 2.66 Yes
33 L01: B-102_Bedroom 02 Bedroom 3.24 2.44 Yes
34 L01: B-102_Bedroom 03 Bedroom 3.24 2.9 Yes
35 L01: B-102_Bedroom 04 Bedroom 3.24 2.43 Yes
36 L01: B-102_Living Living 10.56 4.4 Yes
37 L01: C-101_Bedroom 01 Bedroom 3.24 0.33 No
38 L01: C-101_Bedroom 02 Bedroom 3.24 0.5 No
39 L01: C-101_Bedroom 03 Bedroom 3.24 0.5 No
40 L01: C-101_Bedroom 04 Bedroom 3.24 0.45 No
41 L01: C-101_Bedroom 05 Bedroom 3.24 2.73 Yes
42 L01: C-101_Bedroom 06 Bedroom 3.24 2.32 Yes
43 L01: C-101_Bedroom 07 Bedroom 3.24 2.69 Yes
44 L01: C-101_Bedroom 08 Bedroom 5.568 2.21 Yes
45 L01: C-101_Living Living 9.345 1.81 Yes
Page 31 of 73
Level 02 Plan
Level 02 ADF Results
Reference Number
Room Name Room Activity
External Window
Area (m2) % ADF
Achieves the BRE
Best Practice
Guidelines
1 L02: A-201_Bedroom 01 Bedroom 3.24 2.56 Yes
2 L02: A-201_Bedroom 02 Bedroom 3.24 2.89 Yes
3 L02: A-201_Bedroom 03 Bedroom 3.24 2.81 Yes
4 L02: A-201_Bedroom 04 Bedroom 3.24 2.24 Yes
5 L02: A-201_Bedroom 05 Bedroom 3.24 0.55 No
6 L02: A-201_Bedroom 06 Bedroom 3.24 0.55 No
7 L02: A-201_Bedroom 07 Bedroom 3.24 0.52 No
8 L02: A-201_Bedroom 08 Bedroom 3.24 0.55 No
9 L02: A-201_Living Living 24.57 4.44 Yes
10 L02: A-202_Bedroom 01 Bedroom 3.24 2.83 Yes
Page 32 of 73
Reference Number
Room Name Room Activity
External Window
Area (m2) % ADF
Achieves the BRE
Best Practice
Guidelines 11 L02: A-202_Bedroom 02 Bedroom 3.24 2.69 Yes
12 L02: A-202_Bedroom 03 Bedroom 3.24 2.65 Yes
13 L02: A-202_Living Living 4.44 2.44 Yes
14 L02: A-203_Bedroom 01 Bedroom 3.24 2.64 Yes
15 L02: A-203_Bedroom 02 Bedroom 3.24 3.12 Yes
16 L02: A-203_Bedroom 03 Bedroom 3.24 3.08 Yes
17 L02: A-203_Bedroom 04 Bedroom 3.24 0.35 No
18 L02: A-203_Bedroom 05 Bedroom 3.24 0.19 No
19 L02: A-203_Bedroom 06 Bedroom 3.24 0.18 No
20 L02: A-203_Bedroom 07 Bedroom 3.24 0.27 No
21 L02: A-203_Bedroom 08 Bedroom 3.24 0.33 No
22 L02: A-203_Living Living 31.08 6.82 Yes
23 L02: B-201_Bedroom 01 Bedroom 5.28 0.39 No
24 L02: B-201_Bedroom 02 Bedroom 3.24 0.52 No
25 L02: B-201_Bedroom 03 Bedroom 3.24 0.25 No
26 L02: B-201_Bedroom 04 Bedroom 3.24 1.49 Yes
27 L02: B-201_Bedroom 05 Bedroom 3.24 1.69 Yes
28 L02: B-201_Bedroom 06 Bedroom 3.24 1.12 Yes
29 L02: B-201_Bedroom 07 Bedroom 3.24 1.52 Yes
30 L02: B-201_Bedroom 08 Bedroom 3.24 1.53 Yes
31 L02: B-201_Living Living 14.70 1.44 Marginally
below target value
32 L02: B-202_Bedroom 01 Bedroom 3.24 2.73 Yes
33 L02: B-202_Bedroom 02 Bedroom 3.24 2.52 Yes
34 L02: B-202_Bedroom 03 Bedroom 3.24 3.14 Yes
35 L02: B-202_Bedroom 04 Bedroom 3.24 2.77 Yes
36 L02: B-202_Living Living 10.56 4.13 Yes
37 L02: C-201_Bedroom 01 Bedroom 3.24 0.42 No
38 L02: C-201_Bedroom 02 Bedroom 3.24 0.61 No
39 L02: C-201_Bedroom 03 Bedroom 3.24 0.61 No
40 L02: C-201_Bedroom 04 Bedroom 3.24 0.53 No
41 L02: C-201_Bedroom 05 Bedroom 3.24 2.94 Yes
42 L02: C-201_Bedroom 06 Bedroom 3.24 2.61 Yes
43 L02: C-201_Bedroom 07 Bedroom 3.24 3.04 Yes
44 L02: C-201_Bedroom 08 Bedroom 5.57 2.55 Yes
45 L02: C-201_Living Living 9.35 2.05 Yes
Page 33 of 73
Level 03 Plan
Level 03 ADF Results
Reference Number
Room Name Room Activity
External Window
Area (m2) % ADF
Achieves the BRE
Best Practice
Guidelines
1 L03: A-301_Bedroom 01 Bedroom 3.24 2.58 Yes
2 L03: A-301_Bedroom 02 Bedroom 3.24 2.94 Yes
3 L03: A-301_Bedroom 03 Bedroom 3.24 2.86 Yes
4 L03: A-301_Bedroom 04 Bedroom 3.24 2.28 Yes
5 L03: A-301_Bedroom 05 Bedroom 3.24 0.86 Marginally
below target value
6 L03: A-301_Bedroom 06 Bedroom 3.24 0.84 Marginally
below target value
Page 34 of 73
Reference Number
Room Name Room Activity
External Window
Area (m2) % ADF
Achieves the BRE
Best Practice
Guidelines 7 L03: A-301_Bedroom 07 Bedroom 3.24 0.68 No
8 L03: A-301_Bedroom 08 Bedroom 3.24 0.65 No
9 L03: A-301_Living Living 24.57 4.64 Yes
10 L03: A-302_Bedroom 01 Bedroom 3.24 2.88 Yes
11 L03: A-302_Bedroom 02 Bedroom 3.24 2.76 Yes
12 L03: A-302_Bedroom 03 Bedroom 3.24 2.67 Yes
13 L03: A-302_Living Living 4.44 2.49 Yes
14 L03: A-303_Bedroom 01 Bedroom 3.24 2.66 Yes
15 L03: A-303_Bedroom 02 Bedroom 3.24 3.17 Yes
16 L03: A-303_Bedroom 03 Bedroom 3.24 3.08 Yes
17 L03: A-303_Bedroom 04 Bedroom 3.24 0.44 No
18 L03: A-303_Bedroom 05 Bedroom 3.24 0.27 No
19 L03: A-303_Bedroom 06 Bedroom 3.24 0.28 No
20 L03: A-303_Bedroom 07 Bedroom 3.24 0.46 No
21 L03: A-303_Bedroom 08 Bedroom 3.24 0.62 No
22 L03: A-303_Living Living 28.50 6.21 Yes
23 L03: B-301_Bedroom 01 Bedroom 5.28 0.6 No
24 L03: B-301_Bedroom 02 Bedroom 3.24 0.85 Marginally
below target value
25 L03: B-301_Bedroom 03 Bedroom 3.24 0.41 No
26 L03: B-301_Bedroom 04 Bedroom 3.24 2.09 Yes
27 L03: B-301_Bedroom 05 Bedroom 3.24 2.69 Yes
28 L03: B-301_Bedroom 06 Bedroom 3.24 1.9 Yes
29 L03: B-301_Bedroom 07 Bedroom 3.24 2.61 Yes
30 L03: B-301_Bedroom 08 Bedroom 3.24 2.51 Yes
31 L03: B-301_Living Living 14.70 1.65 Yes
32 L03: B-302_Bedroom 01 Bedroom 3.24 2.8 Yes
33 L03: B-302_Bedroom 02 Bedroom 3.24 2.68 Yes
34 L03: B-302_Bedroom 03 Bedroom 3.24 3.45 Yes
35 L03: B-302_Bedroom 04 Bedroom 3.24 3.19 Yes
36 L03: B-302_Living Living 9.24 3.69 Yes
37 L03: C-301_Bedroom 01 Bedroom 3.24 0.54 No
38 L03: C-301_Bedroom 02 Bedroom 3.24 0.69 No
39 L03: C-301_Bedroom 03 Bedroom 3.24 0.67 No
40 L03: C-301_Bedroom 04 Bedroom 3.24 0.54 No
41 L03: C-301_Bedroom 05 Bedroom 3.24 2.44 Yes
42 L03: C-301_Bedroom 06 Bedroom 3.24 2.39 Yes
Page 35 of 73
43 L03: C-301_Bedroom 07 Bedroom 3.24 3.22 Yes
44 L03: C-301_Bedroom 08 Bedroom 5.57 2.76 Yes
45 L03: C-301_Living Living 9.35 2.16 Yes
Page 36 of 73
Level 04 Plan
Level 04 ADF Results
Reference Number
Room Name Room Activity
External Window
Area (m2)
% ADF
Achieves the BRE
Best Practice
Guidelines
1 L04: A-401_Bedroom 01 Bedroom 3.24 2.66 Yes
2 L04: A-401_Bedroom 02 Bedroom 3.24 3.02 Yes
3 L04: A-401_Bedroom 03 Bedroom 3.24 2.91 Yes
4 L04: A-401_Bedroom 04 Bedroom 3.24 2.35 Yes
5 L04: A-401_Bedroom 05 Bedroom 3.24 1.55 Yes
6 L04: A-401_Bedroom 06 Bedroom 3.24 1.38 Yes
7 L04: A-401_Bedroom 07 Bedroom 3.24 1.05 Yes
8 L04: A-401_Bedroom 08 Bedroom 3.24 0.84 Marginally
below target value
Page 37 of 73
9 L04: A-401_Living Living 24.57 4.81 Yes
10 L04: A-402_Bedroom 01 Bedroom 3.24 2.93 Yes
11 L04: A-402_Bedroom 02 Bedroom 3.24 2.79 Yes
12 L04: A-402_Bedroom 03 Bedroom 3.24 2.7 Yes
13 L04: A-402_Living Living 4.44 2.52 Yes
14 L04: A-403_Bedroom 01 Bedroom 3.24 2.73 Yes
15 L04: A-403_Bedroom 02 Bedroom 3.24 3.15 Yes
16 L04: A-403_Bedroom 03 Bedroom 3.24 3.11 Yes
17 L04: A-403_Bedroom 04 Bedroom 3.24 1.01 Yes
18 L04: A-403_Bedroom 05 Bedroom 3.24 0.96 Marginally
below target value
19 L04: A-403_Bedroom 06 Bedroom 3.24 1.14 Yes
20 L04: A-403_Bedroom 07 Bedroom 3.24 1.43 Yes
21 L04: A-403_Bedroom 08 Bedroom 3.24 1.44 Yes
22 L04: A-403_Living Living 28.5 6.35 Yes
23 L04: B-401_Bedroom 01 Bedroom 5.28 0.88 Marginally
below target value
24 L04: B-401_Bedroom 02 Bedroom 3.24 1.48 Yes
25 L04: B-401_Bedroom 03 Bedroom 3.24 0.8 Marginally
below target value
26 L04: B-401_Bedroom 04 Bedroom 3.24 2.56 Yes
27 L04: B-401_Bedroom 05 Bedroom 3.24 3.42 Yes
28 L04: B-401_Bedroom 06 Bedroom 3.24 2.52 Yes
29 L04: B-401_Bedroom 07 Bedroom 3.24 3.37 Yes
30 L04: B-401_Bedroom 08 Bedroom 3.24 3.27 Yes
31 L04: B-401_Living Living 14.7 1.89 Yes
32 L04: B-402_Bedroom 01 Bedroom 3.24 2.84 Yes
33 L04: B-402_Bedroom 02 Bedroom 3.24 2.78 Yes
34 L04: B-402_Bedroom 03 Bedroom 3.24 3.64 Yes
35 L04: B-402_Bedroom 04 Bedroom 3.24 3.47 Yes
36 L04: B-402_Living Living 9.24 3.76 Yes
37 L04: C-401_Bedroom 01 Bedroom 3.24 0.74 No
38 L04: C-401_Bedroom 02 Bedroom 3.24 0.89 Marginally
below target value
39 L04: C-401_Bedroom 03 Bedroom 3.24 0.84 Marginally
below target value
40 L04: C-401_Bedroom 04 Bedroom 3.24 0.57 No
41 L04: C-401_Bedroom 05 Bedroom 3.24 3.14 Yes
42 L04: C-401_Bedroom 06 Bedroom 3.24 2.84 Yes
Page 38 of 73
43 L04: C-401_Bedroom 07 Bedroom 3.24 2.96 Yes
44 L04: C-401_Bedroom 08 Bedroom 5.568 3.61 Yes
45 L04: C-401_Living Living 9.345 2.83 Yes
Page 39 of 73
Level 05 Plan
Level 05 ADF Results
Reference Number
Room Name Room Activity
External Window
Area (m2) % ADF
Achieves the BRE
Best Practice
Guidelines
1 L05: A-501_Bedroom 01 Bedroom 3.24 2.69 Yes
2 L05: A-501_Bedroom 02 Bedroom 3.24 3.08 Yes
3 L05: A-501_Bedroom 03 Bedroom 3.24 2.98 Yes
4 L05: A-501_Bedroom 04 Bedroom 3.24 2.39 Yes
5 L05: A-501_Bedroom 05 Bedroom 3.24 2.2 Yes
6 L05: A-501_Bedroom 06 Bedroom 3.24 2.17 Yes
7 L05: A-501_Bedroom 07 Bedroom 3.24 1.9 Yes
Page 40 of 73
Reference Number
Room Name Room Activity
External Window
Area (m2) % ADF
Achieves the BRE
Best Practice
Guidelines 8 L05: A-501_Bedroom 08 Bedroom 3.24 1.42 Yes
9 L05: A-501_Living Living 20.88 4.49 Yes
10 L05: A-502_Bedroom 01 Bedroom 3.24 2.95 Yes
11 L05: A-502_Bedroom 02 Bedroom 3.24 2.85 Yes
12 L05: A-502_Bedroom 03 Bedroom 3.24 2.69 Yes
13 L05: A-502_Living Living 4.44 2.55 Yes
14 L05: A-503_Bedroom 01 Bedroom 3.24 2.72 Yes
15 L05: A-503_Bedroom 02 Bedroom 3.24 3.17 Yes
16 L05: A-503_Bedroom 03 Bedroom 3.24 3.12 Yes
17 L05: A-503_Bedroom 04 Bedroom 3.24 2.73 Yes
18 L05: A-503_Bedroom 05 Bedroom 3.24 2.77 Yes
19 L05: A-503_Bedroom 06 Bedroom 3.24 2.65 Yes
20 L05: A-503_Bedroom 07 Bedroom 3.24 2.69 Yes
21 L05: A-503_Bedroom 08 Bedroom 3.24 2.35 Yes
22 L05: A-503_Living Living 28.50 6.6 Yes
23 L05: B-501_Bedroom 01 Bedroom 5.28 1.25 Yes
24 L05: B-501_Bedroom 02 Bedroom 3.24 2.06 Yes
25 L05: B-501_Bedroom 03 Bedroom 3.24 1.75 Yes
26 L05: B-501_Bedroom 04 Bedroom 3.24 2.72 Yes
27 L05: B-501_Bedroom 05 Bedroom 3.24 3.62 Yes
28 L05: B-501_Bedroom 06 Bedroom 3.24 2.67 Yes
29 L05: B-501_Bedroom 07 Bedroom 3.24 3.54 Yes
30 L05: B-501_Bedroom 08 Bedroom 3.24 3.51 Yes
31 L05: B-501_Living Living 14.70 2.02 Yes
32 L05: B-502_Bedroom 01 Bedroom 3.24 2.93 Yes
33 L05: B-502_Bedroom 02 Bedroom 3.24 2.8 Yes
34 L05: B-502_Bedroom 03 Bedroom 3.24 3.75 Yes
35 L05: B-502_Bedroom 04 Bedroom 3.24 3.63 Yes
36 L05: B-502_Living Living 9.24 4.91 Yes
Page 41 of 73
Level 06 Plan
Level 06 ADF Results
Reference Number
Room Name Room Activity
External Window Area
(m2) % ADF
Achieves the BRE
Best Practice
Guidelines
1 L06: A-601_Bedroom 01 Bedroom 3.24 2.78 Yes
2 L06: A-601_Bedroom 02 Bedroom 3.24 3.11 Yes
3 L06: A-601_Bedroom 03 Bedroom 3.24 3.03 Yes
4 L06: A-601_Bedroom 04 Bedroom 3.24 2.4 Yes
5 L06: A-601_Bedroom 05 Bedroom 3.24 2.72 Yes
6 L06: A-601_Bedroom 06 Bedroom 3.24 2.84 Yes
7 L06: A-601_Bedroom 07 Bedroom 3.24 2.69 Yes
8 L06: A-601_Bedroom 08 Bedroom 3.24 2.2 Yes
9 L06: A-601_Living Living 20.88 4.75 Yes
10 L06: A-602_Bedroom 01 Bedroom 3.24 3.01 Yes
11 L06: A-602_Bedroom 02 Bedroom 3.24 2.84 Yes
12 L06: A-602_Bedroom 03 Bedroom 3.24 2.76 Yes
Page 42 of 73
Reference Number
Room Name Room Activity
External Window Area
(m2) % ADF
Achieves the BRE
Best Practice
Guidelines 13 L06: A-602_Living Living 4.44 2.58 Yes
14 L06: A-603_Bedroom 01 Bedroom 3.24 2.75 Yes
15 L06: A-603_Bedroom 02 Bedroom 3.24 3.19 Yes
16 L06: A-603_Bedroom 03 Bedroom 3.24 3.13 Yes
17 L06: A-603_Bedroom 04 Bedroom 3.24 3.1 Yes
18 L06: A-603_Bedroom 05 Bedroom 3.24 3.18 Yes
19 L06: A-603_Bedroom 06 Bedroom 3.24 3.05 Yes
20 L06: A-603_Bedroom 07 Bedroom 3.24 3.07 Yes
21 L06: A-603_Bedroom 08 Bedroom 3.24 2.65 Yes
22 L06: A-603_Living Living 28.50 7.32 Yes
Page 43 of 73
Level 07 Plan
Level 07 ADF Results
Reference Number
Room Name Room Activity
External Window Area
(m2) % ADF
Achieves the BRE
Best Practice
Guidelines
1 L07: A-701_Bedroom 01 Bedroom 3.24 2.83 Yes
2 L07: A-701_Bedroom 02 Bedroom 3.24 3.17 Yes
3 L07: A-701_Bedroom 03 Bedroom 3.24 3.11 Yes
4 L07: A-701_Bedroom 04 Bedroom 3.101 2.26 Yes
5 L07: A-701_Bedroom 05 Bedroom 3.24 2.97 Yes
6 L07: A-701_Bedroom 06 Bedroom 3.24 3.07 Yes
7 L07: A-701_Bedroom 07 Bedroom 3.24 3.02 Yes
8 L07: A-701_Bedroom 08 Bedroom 3.24 2.38 Yes
9 L07: A-701_Living Living 20.88 4.92 Yes
10 L07: A-702_Studio Studio 10.32 3.02 Yes
Page 44 of 73
Level 08 Plan
Level 08 ADF Results
Reference Number
Room Name Room Activity
External Window Area
(m2) % ADF
Achieves the BRE
Best Practice
Guidelines
1 L08: A-801_Bedroom 01 Bedroom 3.24 2.89 Yes
2 L08: A-801_Bedroom 02 Bedroom 3.24 3.2 Yes
3 L08: A-801_Bedroom 03 Bedroom 3.24 3.12 Yes
4 L08: A-801_Bedroom 04 Bedroom 3.101 2.3 Yes
5 L08: A-801_Bedroom 05 Bedroom 3.24 3.09 Yes
6 L08: A-801_Bedroom 06 Bedroom 3.24 3.23 Yes
7 L08: A-801_Bedroom 07 Bedroom 3.24 3.12 Yes
8 L08: A-801_Bedroom 08 Bedroom 3.24 2.48 Yes
9 L08: A-801_Living Living 20.88 5.03 Yes
10 L08: A-802_Studio Studio 10.32 3.1 Yes
Page 45 of 73
Level 09 Plan
Level 09 ADF Results
Reference Number
Room Name Room Activity
External Window Area
(m2) % ADF
Achieves the BRE
Best Practice
Guidelines
1 L09: A-901_Bedroom 01 Bedroom 3.24 3.1 Yes
2 L09: A-901_Bedroom 02 Bedroom 3.24 3.21 Yes
3 L09: A-901_Bedroom 03 Bedroom 3.24 3.19 Yes
4 L09: A-901_Bedroom 04 Bedroom 3.101 2.37 Yes
5 L09: A-901_Bedroom 05 Bedroom 3.24 3.17 Yes
6 L09: A-901_Bedroom 06 Bedroom 3.24 3.33 Yes
7 L09: A-901_Bedroom 07 Bedroom 3.24 3.22 Yes
8 L09: A-901_Bedroom 08 Bedroom 3.24 2.58 Yes
9 L09: A-901_Living Living 20.88 5.95 Yes
10 L09: A-902_Studio Studio 10.32 3.69 Yes
Page 46 of 73
9. SUNLIGHT RESULTS
For the BRE Guidance on Sunlight in Amenity Space refer to page 17 of this report.
Above: Google Earth Image of the existing site.
Above: Sun path over the proposed development on the 21st March.
Page 47 of 73
Above: Probable sunlight hours on March 21st (hours) legend
Above: The amenity area of the adjacent development (The Crow’s Nest) shown in red above is achieving 2 hours of sunshine on the 21st March as per the BRE Industry Guidelines. The proposed development has not caused any significant loss of sun light as demonstrated using simulation modelling.
Page 48 of 73
Annual Probable Sunlight Hours in the Proposed Development
Above: Annual probable sunlight hours (%) legend
Above: The images above (taken from the south and west) show that the majority of living spaces of the proposed development achieve 25% of their annual probable sunlight hours (highlighted in red) meaning these spaces will appear reasonably sunlit in line with BRE 209 guidance.
Page 49 of 73
Above: The images above (taken from the south and west) show that the majority of living spaces of the proposed development achieve 25% of their annual probable sunlight hours (highlighted in red) meaning these spaces will appear reasonably sunlit in line with BRE 209 guidance.
Above: Probable sunlight hours from September 21st to March 21st (%) legend
Page 50 of 73
Above: The images above (taken from the south and west) show that the majority of living spaces of the proposed development achieve 5% of their probable sunlight hours during winter months between 21st of September and 21st of March (highlighted in red) meaning these spaces will appear reasonably sunlit in line with BRE 209 guidance. The guidance states that the site layout should aim to maximise the number of dwellings with a mian living room that meets the above recommendations.
Page 51 of 73
Annual Probable Sunlight Hours in Surrounding Buildings
Above: Annual probable sunlight hours (%) legend
Above: The images above show that the majority of surrounding buildings achieve 25% of their annual probable sunlight hours (highlighted in red) meaning these spaces will appear reasonably sunlit in line with BRE 209 guidance. With regard to some of the windows that do not achieve the criteria, the annual probable sunlight hours are affected by other existing surrounding buildings.
Page 52 of 73
Above: The images above show that the majority of surrounding buildings achieve 25% of their annual probable sunlight hours (highlighted in red) meaning these spaces will appear reasonably sunlit in line with BRE 209 guidance. With regard to some of the windows that do not achieve the criteria, the annual probable sunlight hours are affected by other existing surrounding buildings.
Page 53 of 73
Above: The images above show that the majority of surrounding buildings achieve 25% of their annual probable sunlight hours (highlighted in red) meaning these spaces will appear reasonably sunlit in line with BRE 209 guidance. With regard to some of the windows that do not achieve the criteria, the annual probable sunlight hours are affected by other existing surrounding buildings.
Page 54 of 73
Above: Probable sunlight hours from September 21st to March 21st (%) legend
Above: The images above show that the majority of surrounding buildings of the development achieve 5% of their probable sunlight hours during winter months between 21st of September and 21st of March (highlighted in red) meaning these spaces will appear reasonably sunlit in line with BRE 209 guidance. The small number of windows that do not meet this criteria are shaded to the south by other existing buildings which would contribute to their lack of sunlight hours.
Page 55 of 73
Above: The images above show that the majority of surrounding buildings of the development achieve 5% of their probable sunlight hours during winter months between 21st of September and 21st of March (highlighted in red) meaning these spaces will appear reasonably sunlit in line with BRE 209 guidance. The small number of windows that do not meet this criteria are shaded to the south by other existing buildings which would contribute to their lack of sunlight hours.
Page 56 of 73
Above: The images above show that the majority of surrounding buildings of the development achieve 5% of their probable sunlight hours during winter months between 21st of September and 21st of March (highlighted in red) meaning these spaces will appear reasonably sunlit in line with BRE 209 guidance. The small number of windows that do not meet this criteria are shaded to the south by other existing buildings which would contribute to their lack of sunlight hours.
Page 57 of 73
APPENDIX A | OVERSHADOWING IMAGES
Plan View Images
Plan View – 21st March
Existing 21st March (08:00) Proposed 21st March (08:00)
Existing 21st March (10:00) Proposed 21st March (10:00)
Page 58 of 73
Existing 21st March (12:00) Proposed 21st March (12:00)
Existing 21st March (14:00) Proposed 21st March (14:00)
Page 59 of 73
Existing 21st March (16:00) Proposed 21st March (16:00)
Existing 21st March (18:00) Proposed 21st March (18:00)
Page 60 of 73
Plan View – 21st June
Existing 21st June (08:00) Proposed 21st June (08:00)
Existing 21st June (10:00) Proposed 21st June (10:00)
Page 61 of 73
Existing 21st June (12:00) Proposed 21st June (12:00)
Existing 21st June (14:00) Proposed 21st June (14:00)
Page 62 of 73
Existing 21st June (16:00) Proposed 21st June (16:00)
Existing 21st June (18:00) Proposed 21st June (18:00)
Page 63 of 73
Plan View – 21st December
Existing 21st December (08:00) Proposed 21st December (08:00)
Existing 21st December (10:00) Proposed 21st December (10:00)
Page 64 of 73
Existing 21st December (12:00) Proposed 21st December (12:00)
Existing 21st December (14:00) Proposed 21st December (14:00)
Page 65 of 73
Existing 21st December (16:00) Proposed 21st December (16:00)
Existing 21st December (18:00) Proposed 21st December (18:00)
Page 66 of 73
APPENDIX B | VERTICAL SKY COMPONENT RESULTS (PROPOSED DEVELOPMENT)
Ref No. Surrounding
Building Surface Opening
Resultant VSC (Post-
Development)
Existing VSC (Pre-
Development) Status
% of Existing
VSC Maintained
1 Block 4 1 0 24.58 34.9 *Note 1 70.43
2 Block 4 1 1 16.83 24.05 *Note 1 69.98
3 Block 4 1 2 21.65 31.52 *Note 1 68.69
4 Block 4 1 3 22.34 32.78 *Note 1 68.15
5 Block 1 2 0 22.78 33.12 *Note 1 68.78
6 Block 1 2 1 24.75 34.12 *Note 1 72.54
7 Block 1 2 2 26.1 34.85 *Note 1 74.89
8 Block 1 2 3 28.01 32.6 Pass 85.92
9 Block 1 2 4 26.84 31.81 Pass2 84.38
10 Block 1 2 5 25.42 30.84 Pass2 82.43
11 Block 1 2 6 28.26 33.54 Pass 84.26
12 Block 1 2 7 27.71 34.42 Pass 80.51
13 Block 1 2 8 25.85 33.68 *Note 1 76.75
14 Block 1 2 9 26.73 32.74 Pass2 81.64
15 Block 1 2 10 24.91 31.77 *Note 1 78.41
16 Block 1 2 11 24.28 32.58 *Note 1 74.52
17 Block 1 5 0 14.98 22.42 *Note 1 66.82
18 Block 1 5 1 18.73 25.65 *Note 1 73.02
19 Block 1 5 2 24.59 30.37 Pass2 80.97
20 Block 1 5 3 24.79 28.46 Pass2 87.10
21 Block 1 5 4 18.76 22.81 Pass2 82.24
22 Block 1 5 5 14.74 19.44 *Note 1 75.82
23 Block 1 5 6 22.89 24.76 Pass2 92.45
24 Block 1 5 7 17.45 20.37 Pass2 85.67
25 Block 1 5 8 21.09 23.44 Pass2 89.97
26 Block 1 5 9 25.49 27.47 Pass2 92.79
27 Block 1 5 10 29.65 31.25 Pass 94.88
28 Block 1 5 11 26.86 28.68 Pass2 93.65
29 Block 2 2 0 7.9 24.97 *Note 1 31.64
30 Block 2 2 1 7.55 28.8 *Note 1 26.22
31 Block 2 2 2 9.17 29.36 *Note 1 31.23
32 Block 2 2 3 10.77 28.93 *Note 1 37.23
33 Block 2 2 4 11.59 28.86 *Note 1 40.16
34 Block 2 2 5 13.95 28.33 *Note 1 49.24
35 Block 2 2 6 10.49 36.94 *Note 1 28.40
Page 67 of 73
Ref No. Surrounding Building
Surface Opening Resultant VSC
(Post-Development)
Existing VSC (Pre-
Development) Status
% of Existing
VSC Maintained
36 Block 2 2 7 12.54 37.52 *Note 1 33.42
37 Block 2 2 8 15.92 37.81 *Note 1 42.11
38 Block 2 2 9 23.25 36.95 *Note 1 62.92
39 Block 2 2 10 22.23 37.02 *Note 1 60.05
40 Block 2 2 11 20.67 37.42 *Note 1 55.24
41 Block 2 2 12 19.25 37.69 *Note 1 51.07
42 Block 2 2 13 17.82 37.71 *Note 1 47.26
43 Block 2 2 14 17.37 37.87 *Note 1 45.87
44 Block 2 2 15 17.2 37.93 *Note 1 45.35
45 Block 2 2 16 16.26 37.89 *Note 1 42.91
46 Block 2 2 17 20.67 36.51 *Note 1 56.61
47 Block 2 2 18 19.59 36.75 *Note 1 53.31
48 Block 2 2 19 18.13 37.01 *Note 1 48.99
49 Block 2 2 20 16.89 36.96 *Note 1 45.70
50 Block 2 2 21 15.02 37.32 *Note 1 40.25
51 Block 2 2 22 13.68 37.53 *Note 1 36.45
52 Block 2 2 23 13.07 37.57 *Note 1 34.79
53 Block 2 2 24 12.48 37.63 *Note 1 33.17
54 Block 2 2 25 18.12 35.98 *Note 1 50.36
55 Block 2 2 26 16.66 36.28 *Note 1 45.92
56 Block 2 2 27 15.82 36.4 *Note 1 43.46
57 Block 2 2 28 14.62 36.48 *Note 1 40.08
58 Block 2 2 29 12.72 36.85 *Note 1 34.52
59 Block 2 2 30 11.25 36.79 *Note 1 30.58
60 Block 2 2 31 11.43 36.9 *Note 1 30.98
61 Block 2 2 32 10.27 37.02 *Note 1 27.74
62 Block 2 2 33 8.96 35.76 *Note 1 25.06
63 Block 2 2 34 8.7 35.75 *Note 1 24.34
64 Block 2 2 35 9.44 35.67 *Note 1 26.46
65 Block 2 2 36 9.7 35.27 *Note 1 27.50
66 Block 2 2 37 11.3 34.97 *Note 1 32.31
67 Block 2 2 38 12.7 34.92 *Note 1 36.37
68 Block 2 2 39 14.05 34.83 *Note 1 40.34
69 Block 2 2 40 15.4 34.7 *Note 1 44.38
70 Block 2 2 41 16.72 34.26 *Note 1 48.80
71 Block 2 4 0 37.98 38.91 Pass 97.61
72 Block 2 4 1 38.3 39.05 Pass 98.08
73 Block 2 4 2 38.47 39.25 Pass 98.01
74 Block 2 4 3 37.65 38.7 Pass 97.29
Page 68 of 73
Ref No. Surrounding Building
Surface Opening Resultant VSC
(Post-Development)
Existing VSC (Pre-
Development) Status
% of Existing
VSC Maintained
75 Block 2 4 4 34.06 38.33 Pass 88.86
76 Block 2 4 5 35.6 39.19 Pass 90.84
77 Block 2 4 6 35.04 38.96 Pass 89.94
78 Block 2 4 7 34.45 38.51 Pass 89.46
79 Block 2 4 8 37.3 38.43 Pass 97.06
80 Block 2 4 9 33.93 36.6 Pass 92.70
81 Block 2 4 10 36.71 38.15 Pass 96.23
82 Block 2 4 11 36.95 38.65 Pass 95.60
83 Block 2 4 12 37.28 38.88 Pass 95.88
84 Block 2 4 13 37.6 39.03 Pass 96.34
85 Block 2 4 14 38.27 39.21 Pass 97.60
86 Block 2 4 15 37.63 39.14 Pass 96.14
87 Block 2 4 16 36.86 39.09 Pass 94.30
88 Block 2 4 17 36.5 38.75 Pass 94.19
89 Block 2 4 18 36.21 38.51 Pass 94.03
90 Block 2 4 19 35.62 38.24 Pass 93.15
91 Block 6 5 0 18.63 25.57 *Note 1 72.86
92 Block 6 5 1 21.9 32.16 *Note 1 68.10
93 Block 6 5 2 21.79 32.24 *Note 1 67.59
94 Block 6 5 3 21.27 30.37 *Note 1 70.04
95 Block 6 5 4 20.43 28.16 *Note 1 72.55
96 Block 6 5 5 19.93 26.77 *Note 1 74.45
97 Block 6 5 6 13.79 20.83 *Note 1 66.20
98 Block 6 5 7 18.89 29.09 *Note 1 64.94
99 Block 6 5 8 19.08 28.1 *Note 1 67.90
100 Block 7 3 0 24.17 36.02 *Note 1 67.10
101 Block 7 3 1 22.87 36.41 *Note 1 62.81
102 Block 7 3 2 24.68 35.74 *Note 1 69.05
103 Block 7 3 3 25.78 34.95 *Note 1 73.76
104 Block 7 3 4 22.43 34.71 *Note 1 64.62
105 Block 7 3 5 24.03 34.05 *Note 1 70.57
106 Block 3 1 0 20.86 34.41 *Note 1 60.62
107 Block 3 1 1 17.37 32.66 *Note 1 53.18
108 Block 3 1 2 15.4 31.95 *Note 1 48.20
109 Block 3 1 3 24.22 35.35 *Note 1 68.51
110 Block 3 2 0 16 31.26 *Note 1 51.18
111 Block 3 2 1 16.52 31.43 *Note 1 52.56
112 Block 3 2 2 13.28 30.38 *Note 1 43.71
113 Block 3 2 3 13.38 30.53 *Note 1 43.83
Page 69 of 73
Ref No. Surrounding Building
Surface Opening Resultant VSC
(Post-Development)
Existing VSC (Pre-
Development) Status
% of Existing
VSC Maintained
114 Block 3 2 4 12.03 28.96 *Note 1 41.54
115 Block 3 2 5 11.45 29.76 *Note 1 38.47
116 Block 3 2 6 19.77 32.59 *Note 1 60.66
117 Block 3 2 7 19.63 32.1 *Note 1 61.15
118 Block 3 3 0 20.67 34.41 *Note 1 60.07
119 Block 3 3 1 17.56 33.37 *Note 1 52.62
120 Block 3 3 2 15.73 32.69 *Note 1 48.12
121 Block 3 3 3 23.26 35.41 *Note 1 65.69
122 Block 3 8 0 19.79 35.36 *Note 1 55.97
123 Block 3 8 1 20.23 35.61 *Note 1 56.81
124 Block 3 8 2 17.04 34.11 *Note 1 49.96
125 Block 3 8 3 17.03 34.13 *Note 1 49.90
126 Block 3 8 4 15.38 33.25 *Note 1 46.26
127 Block 3 8 5 15.69 33.24 *Note 1 47.20
128 Block 3 8 6 23.39 36.05 *Note 1 64.88
129 Block 3 8 7 23.02 36.08 *Note 1 63.80
130 Block 3 10 0 20.2 35.5 *Note 1 56.90
131 Block 3 10 1 19.6 35.37 *Note 1 55.41
132 Block 3 10 2 17.25 34.51 *Note 1 49.99
133 Block 3 10 3 17.54 34.39 *Note 1 51.00
134 Block 3 10 4 15.93 33.29 *Note 1 47.85
135 Block 3 10 5 15.34 33.52 *Note 1 45.76
136 Block 3 10 6 22.94 36.11 *Note 1 63.53
137 Block 3 10 7 22.53 36.43 *Note 1 61.84
138 Crow's Nest 3 0 32.06 36.14 Pass 88.71
139 Crow's Nest 3 1 32.7 36.82 Pass 88.81
140 Crow's Nest 3 2 33.05 37.15 Pass 88.96
141 Crow's Nest 3 3 33.15 37.03 Pass 89.52
142 Crow's Nest 3 4 33 37.31 Pass 88.45
143 Crow's Nest 3 5 33.22 37.12 Pass 89.49
144 Crow's Nest 3 6 33.79 37.65 Pass 89.75
145 Crow's Nest 3 7 34.03 37.95 Pass 89.67
146 Crow's Nest 3 8 34.09 38.02 Pass 89.66
147 Crow's Nest 3 9 34.35 38.3 Pass 89.69
148 Crow's Nest 3 10 34.16 37.16 Pass 91.93
149 Crow's Nest 3 12 35.16 38.03 Pass 92.45
150 Crow's Nest 3 13 35.33 38.18 Pass 92.54
151 Crow's Nest 3 14 35.36 38.46 Pass 91.94
152 Crow's Nest 3 15 35.34 38.64 Pass 91.46
Page 70 of 73
Ref No. Surrounding Building
Surface Opening Resultant VSC
(Post-Development)
Existing VSC (Pre-
Development) Status
% of Existing
VSC Maintained
153 Crow's Nest 3 16 36.36 38.77 Pass 93.78
154 Crow's Nest 3 17 36.16 38.58 Pass 93.73
155 Crow's Nest 3 18 36.02 38.46 Pass 93.66
156 Crow's Nest 3 19 35.62 38.33 Pass 92.93
157 Crow's Nest 3 20 35.52 37.84 Pass 93.87
158 Crow's Nest 3 21 35.11 37.52 Pass 93.58
159 Crow's Nest 3 22 35.95 37.61 Pass 95.59
160 Crow's Nest 3 23 36.46 38.26 Pass 95.30
161 Crow's Nest 3 24 36.76 38.43 Pass 95.65
162 Crow's Nest 3 25 36.82 38.66 Pass 95.24
163 Crow's Nest 3 26 36.88 38.8 Pass 95.05
164 Crow's Nest 3 27 37.18 38.78 Pass 95.87
165 Crow's Nest 3 28 37.63 39.1 Pass 96.24
166 Crow's Nest 3 29 37.75 38.99 Pass 96.82
167 Crow's Nest 3 30 37.56 38.92 Pass 96.51
168 Crow's Nest 3 31 37.58 38.81 Pass 96.83
169 Crow's Nest 3 32 37.39 38.63 Pass 96.79
170 Crow's Nest 3 33 38.41 39.31 Pass 97.71
171 Crow's Nest 3 34 38.38 39.3 Pass 97.66
172 Crow's Nest 3 35 38.31 39.1 Pass 97.98
173 Crow's Nest 3 36 38.26 38.92 Pass 98.30
174 Crow's Nest 3 37 38.26 39.06 Pass 97.95
175 Crow's Nest 3 38 38.93 39.22 Pass 99.26
176 Crow's Nest 3 39 38.93 39.22 Pass 99.26
177 Crow's Nest 3 40 38.93 39.29 Pass 99.08
178 Crow's Nest 3 41 38.89 39.44 Pass 98.61
179 Crow's Nest 3 42 38.88 39.44 Pass 98.58
180 Crow's Nest 4 0 35.57 35.95 Pass 98.94
181 Crow's Nest 4 1 35.75 36.38 Pass 98.27
182 Crow's Nest 4 3 37.28 37.75 Pass 98.75
183 Crow's Nest 4 4 37.77 38.04 Pass 99.29
184 Crow's Nest 4 5 38.57 38.75 Pass 99.54
185 Crow's Nest 4 6 38.44 38.68 Pass 99.38
186 Crow's Nest 4 7 39.18 39.23 Pass 99.87
187 Crow's Nest 4 8 39.15 39.38 Pass 99.42
188 Crow's Nest 4 9 38.87 39.19 Pass 99.18
189 Crow's Nest 4 10 38.89 39.25 Pass 99.08
190 Crow's Nest 4 11 39.06 39.15 Pass 99.77
191 Crow's Nest 4 12 38.39 38.79 Pass 98.97
Page 71 of 73
Ref No. Surrounding Building
Surface Opening Resultant VSC
(Post-Development)
Existing VSC (Pre-
Development) Status
% of Existing
VSC Maintained
192 Crow's Nest 4 13 39.37 39.37 Pass 100.00
193 Crow's Nest 4 14 39.22 39.34 Pass 99.69
194 Crow's Nest 4 15 39.28 39.28 Pass 100.00
195 Crow's Nest 4 16 39.25 39.39 Pass 99.64
196 Crow's Nest 4 17 39.37 39.38 Pass 99.97
197 Crow's Nest 4 18 39.31 39.39 Pass 99.80
198 Crow's Nest 4 19 39.2 39.36 Pass 99.59
199 Crow's Nest 4 20 39.2 39.36 Pass 99.59
200 Crow's Nest 4 21 39.3 39.33 Pass 99.92
201 Crow's Nest 4 22 39.31 39.45 Pass 99.65
202 Crow's Nest 4 23 39.31 39.45 Pass 99.65
203 Crow's Nest 4 24 39.3 39.35 Pass 99.87
204 Crow's Nest 3 0 34.53 34.88 Pass 99.00
205 Crow's Nest 3 1 35.07 35.33 Pass 99.26
206 Crow's Nest 3 2 31.11 31.95 Pass 97.37
207 Crow's Nest 3 3 32.08 32.88 Pass 97.57
208 Crow's Nest 3 4 29.79 30.84 Pass 96.60
209 Crow's Nest 3 5 27.38 28.86 Pass 94.87
210 Crow's Nest 3 6 28.25 29.6 Pass 95.44
211 Crow's Nest 3 7 29.74 31.22 Pass 95.26
212 Crow's Nest 3 8 27.42 29.39 Pass 93.30
213 Crow's Nest 3 9 27.76 30.01 Pass 92.50
214 Crow's Nest 3 10 26.61 29.15 Pass2 91.29
215 Crow's Nest 3 11 25.63 28 Pass2 91.54
216 Crow's Nest 3 12 24.47 26.07 Pass2 93.86
217 Crow's Nest 3 13 25.38 27.55 Pass2 92.12
218 Crow's Nest 4 0 30.15 32.92 Pass 91.59
219 Crow's Nest 4 1 31.3 34.42 Pass 90.94
220 Crow's Nest 4 2 31.87 35.24 Pass 90.44
221 Crow's Nest 4 3 33.03 36.11 Pass 91.47
222 Crow's Nest 4 4 32.36 34.92 Pass 92.67
223 Crow's Nest 4 5 31 33.41 Pass 92.79
224 Crow's Nest 4 6 33.01 35.08 Pass 94.10
225 Crow's Nest 4 7 33.75 36.15 Pass 93.36
226 Crow's Nest 4 8 34.72 36.76 Pass 94.45
227 Crow's Nest 4 9 33.88 36.08 Pass 93.90
228 Crow's Nest 4 10 32.31 33.63 Pass 96.07
229 Crow's Nest 4 11 34.17 35.4 Pass 96.53
230 Crow's Nest 4 12 34.9 36.44 Pass 95.77
Page 72 of 73
Ref No. Surrounding Building
Surface Opening Resultant VSC
(Post-Development)
Existing VSC (Pre-
Development) Status
% of Existing
VSC Maintained
231 Crow's Nest 4 13 35.43 37.05 Pass 95.63
232 Crow's Nest 4 14 35.41 36.18 Pass 97.87
233 Crow's Nest 4 15 36.08 36.98 Pass 97.57
234 Crow's Nest 4 16 36.7 37.76 Pass 97.19
235 Crow's Nest 4 17 37.15 37.64 Pass 98.70
236 Crow's Nest 4 18 37.79 38.2 Pass 98.93
237 Crow's Nest 3 0 37.5 38.91 Pass 96.38
238 Crow's Nest 3 1 37.19 38.8 Pass 95.85
239 Crow's Nest 3 2 37.01 38.7 Pass 95.63
240 Crow's Nest 3 3 37.33 38.95 Pass 95.84
241 Crow's Nest 3 4 37.6 39.11 Pass 96.14
242 Crow's Nest 3 5 38.03 39.08 Pass 97.31
243 Crow's Nest 3 6 38 39.34 Pass 96.59
244 Crow's Nest 3 7 38.16 39.33 Pass 97.03
245 Crow's Nest 3 8 37.94 39.15 Pass 96.91
246 Crow's Nest 3 9 38 39.18 Pass 96.99
247 Crow's Nest 3 10 38.07 39.19 Pass 97.14
248 Crow's Nest 3 11 38.48 39.19 Pass 98.19
249 Crow's Nest 3 12 38.85 39.33 Pass 98.78
250 Crow's Nest 3 13 38.63 39.21 Pass 98.52
251 Crow's Nest 3 14 38.65 39.29 Pass 98.37
252 Crow's Nest 3 15 38.73 39.4 Pass 98.30
253 Crow's Nest 3 16 38.68 39.22 Pass 98.62
254 Crow's Nest 3 17 39.03 39.31 Pass 99.29
255 Crow's Nest 3 18 38.98 39.15 Pass 99.57
256 Crow's Nest 3 19 39.06 39.15 Pass 99.77
257 Crow's Nest 3 20 39.37 39.38 Pass 99.97
258 Crow's Nest 3 21 39.16 39.38 Pass 99.44
259 Crow's Nest 3 22 39.27 39.35 Pass 99.80
260 Crow's Nest 4 0 38.72 38.72 Pass 100.00
261 Crow's Nest 4 1 38.63 38.85 Pass 99.43
262 Crow's Nest 4 2 38.72 38.82 Pass 99.74
263 Crow's Nest 4 3 38.81 38.93 Pass 99.69
264 Crow's Nest 4 4 38.78 39.03 Pass 99.36
265 Crow's Nest 4 5 35.09 35.51 Pass 98.82
266 Crow's Nest 4 6 35.64 36.04 Pass 98.89
267 Crow's Nest 4 7 36.75 37.21 Pass 98.76
268 Crow's Nest 4 8 37.02 37.81 Pass 97.91
269 Crow's Nest 4 9 37.44 37.9 Pass 98.79
Page 73 of 73
Ref No. Surrounding Building
Surface Opening Resultant VSC
(Post-Development)
Existing VSC (Pre-
Development) Status
% of Existing
VSC Maintained
270 Crow's Nest 4 10 31.57 32.11 Pass 98.32
271 Crow's Nest 4 11 32.69 33.45 Pass 97.73
272 Crow's Nest 4 12 34.34 34.8 Pass 98.68
273 Crow's Nest 4 13 35.29 36.28 Pass 97.27
274 Crow's Nest 4 14 35.9 36.94 Pass 97.18
275 Crow's Nest 4 15 30.02 31.04 Pass 96.71
276 Crow's Nest 4 16 32.11 33.25 Pass 96.57
277 Crow's Nest 4 17 33.63 34.94 Pass 96.25
278 Crow's Nest 4 18 34.22 35.63 Pass 96.04
279 Crow's Nest 4 19 28.06 29.38 Pass 95.51
280 Crow's Nest 4 20 30.32 31.67 Pass 95.74
281 Crow's Nest 4 21 31.89 33.59 Pass 94.94
282 Crow's Nest 4 22 33.23 34.99 Pass 94.97
283 Crow's Nest 4 23 25.72 26.65 Pass2 96.51
284 Crow's Nest 4 24 22.48 24.83 Pass2 90.54
285 Crow's Nest 4 25 24.89 26.84 Pass2 92.73
286 Crow's Nest 4 26 28.72 30.7 Pass 93.55
287 Crow's Nest 4 27 30.81 32.9 Pass 93.65
288 Crow's Nest 4 28 31.32 33.17 Pass 94.42
289 Crow's Nest 4 29 30.19 32.58 Pass 92.66
290 Crow's Nest 4 30 28.8 30.94 Pass 93.08
291 Crow's Nest 4 31 27.45 29.04 Pass 94.52
292 Crow's Nest 4 32 21.34 23.74 Pass2 89.89
293 Crow's Nest 4 33 23.17 25.07 Pass2 92.42
294 Crow's Nest 4 34 26.08 28.79 Pass2 90.59
295 Crow's Nest 4 35 27.86 30.89 Pass 90.19
296 Crow's Nest 4 36 28.72 31.68 Pass 90.66
*Note 1: Result does not meet the recommended BRE guideline value.