Project: The Franklin Care Center: Addition and renovationLocation: Franklin Lakes, New JerseySize: 150,000 sq.ft – 2 stories with cellarArchitect: Beckhard Richland Szerbaty + AssociatesFunction: Elderly Rehabilitation FacilityOccupancy: Residential, medical, administrative, socialLEED certification anticipated
Background
![Page 3: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/3.jpg)
Outline
Lighting DepthMain entrance Lobby CourtyardChapel Physical Therapy Suite
Electrical Depth208/120V system redesign
Construction Management BreadthCost analysis of electrical system
LEED BreadthPerimeter System to achieve LEED Indoor Environmental Quality Credit 6.1Non perimeter System to achieve LEED Indoor Environmental
Quality Credit 6.2
![Page 4: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/4.jpg)
Lighting Depth
Visibility Issues that Arise with Age
Problem: Solution: Reduced pupil size Provide higher illuminance levelsSensitivity to glare Avoid direct lighting from large sources
No bulbs should be directly visibleSensitivity to contrast Only use contrast to mark hazardous area such as stair or change in elevationIncreased adjustment time Provide transition areas Integrate daylight into entrances
![Page 5: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/5.jpg)
Lighting Depth: Lobby
Main Entrance Lobby Lighting RedesignFunctions:Entrance to homeReceptionCirculationVisitor’s Lounge
Reception Desk
Visitors Lounge
Stairs
Elevators
Open to above
![Page 6: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/6.jpg)
Lighting Depth: Lobby
Design Goals:Enhance the architecture of the lobbyCreate and inviting and residential atmosphereGuide visitorsProvide a transition space for the elderly patients eyes to adjustIlluminance Values:
10fc general 30fc visitor’s lounge workplane30fc receptionist desk
Schematic Sketches
![Page 7: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/7.jpg)
Lighting Depth: Lobby
Second floor lobby open to below
![Page 8: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/8.jpg)
Lighting Depth: Lobby
Photosensor 1
Photosensor 2
![Page 9: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/9.jpg)
Lighting Depth: Lobby
Solution SummaryIlluminance:General: 10.36fcReception: 28.28fc without task lightVisitor’s Lounge: 31.23fcStairs: 11fc
Energy Savings:4% below ASHRAE
![Page 10: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/10.jpg)
Lighting Depth: Lobby
Dali Group 1 Photosensor 1 Control - maintain 10fc at critical point
Dali Group 2 Controlled by wallbox group controller
Dali Group 3 Photosensor 2 Control - maintain 30fc at critical point
Relay Module 1 On when Dali Group 3 is on, off when Dali Group 3 is off
Control Group 5 Timer - off 9am - 5pm
LED steplights Remain on at all times
Control Equipment1 Timer 2 Photosensors1 DALI Power Supply 1 DALI Wallbox group control 1 DALI Relay Module
Control Settings:
Lighting Control
![Page 11: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/11.jpg)
Lighting Depth: Lobby
Lobby Rendering
![Page 12: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/12.jpg)
Lighting Depth: Lobby
Lobby Rendering: Entrance
![Page 13: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/13.jpg)
Lighting Depth: Lobby
Lobby Renderings
:Reception Area
Visitor’s Lounge:
![Page 14: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/14.jpg)
Lighting Depth: Lobby
Lobby RenderingsLobby Renderings
:View from Reception Area
View from Visitor’s Lounge:
![Page 15: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/15.jpg)
Lighting Depth: Chapel
Chapel Lighting RedesignFunctions:Various ServicesIndividual Prayer
![Page 16: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/16.jpg)
Design Goals:Enhance the architecture of the chapelCreate a spiritual atmosphereProvide a flexible lighting system for the different uses/times of servicesIlluminance Values:
10fc general30fc for reading50-75fc on leader when speaking
Lighting Depth: Chapel Schematic Sketches
![Page 17: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/17.jpg)
Lighting Depth: Chapel
Occupancy Sensor
![Page 18: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/18.jpg)
Solution SummaryIlluminance:Congregation: 30.84fcEntrance: 10.29fcPodium plane: 54.2fcLeader face: 74fcProjection screen: 10fc
Energy Savings:8% below ASHRAE
Lighting Depth: Chapel
![Page 19: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/19.jpg)
Control Equipment1 DALI Power Supply 1 DALI Wallbox group and scene control 1 DALI compatible occupancy sensor 10 DALI low voltage transformers
Control Settings:
Lighting Control Lighting Depth: Chapel
Service
Before andVisitin
gSermon
after
service HoursGroup 1 100% 100% 100% 100%
Group 2 100% 10% 25% 10%
Group 3 100% Off Off 100%
Relay Module 1 100% 100% 100% 100%
![Page 20: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/20.jpg)
Chapel Rendering
Lighting Depth: Chapel
![Page 21: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/21.jpg)
Chapel Rendering
Lighting Depth: Chapel
![Page 22: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/22.jpg)
Chapel Renderings
Lighting Depth: Chapel
:View from podium
View from front:
![Page 23: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/23.jpg)
Lighting Depth: Courtyard
Courtyard Lighting RedesignFunctions:Relax outdoorsView from patient roomsRarely used after dark
![Page 24: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/24.jpg)
Design Goals:Safe walkwayLimit light pollution – LEEDReduce spill light into patient roomsIlluminance Values: Minimum of 1fc on walkway
Lighting Depth: Courtyard
LEED Sustainable Site Credit 8:Limiting light pollutionLuminaires > 1000 lumens – shieldedLumianires > 3500 lumens – full cutoffLimit landscape lightingAvoid uplighting
![Page 25: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/25.jpg)
Lighting Depth: Courtyard
![Page 26: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/26.jpg)
Lighting Depth: Courtyard
Solution SummaryIlluminance:Walkway: 2.75fc averageMinimum of 1fc
Energy Savings:14% below ASHRAE
![Page 27: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/27.jpg)
Control Equipment:1 Photosensor1 DALI Power Supply 1 DALI Wallbox group control
Control Settings:
Lighting Control Lighting Depth: Courtyard
Dali Group 1 F13 BollardsDali Group 2 F14 SconcesDali Group 3 F19 Poles*LEDs will remain on at all times
![Page 28: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/28.jpg)
Electrical Depth
208/120V System Redesign
Existing System: 2 step down transformers 1 for each 208/120V distribution panelboardRedesigned System: 14 step down transformers1 located before each panelboardPurpose: To feed the panelboards at 480/277V, reducing the size of the conduits, conductors, and circuit breakers.
![Page 29: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/29.jpg)
Electrical Depth
Existing System Partial Riser Diagram:
2 Step Down Transformers
![Page 30: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/30.jpg)
Electrical Depth
Redesigned System Partial Riser Diagram:
14 Step Down Transformers
![Page 31: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/31.jpg)
Construction Management Breadth
Cost AnalysisIncludes cost of DP-EC, conductors, conduit, circuit breakers, transformers relevant to redesigned system
Conclusions$51,193.38 saved in redesigned systemSmaller feeders leave more plenum spaceAdditional transformers require more space in closets/electrical rooms
![Page 32: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/32.jpg)
Conclusions
ConclusionsLighting DepthCreates a residential atmosphereCaters to the needs of the elderly eyeProvides flexibility and daylight integrationMeets requirement of LEED Sustainable Site credit 8 – Limiting Light PollutionAverage power density 7% below ASHRAE – towards LEED Optimizing Energy Credits
Electrical Depth and CM BreadthProvides a feasible alternative to the existing systemLower cost of equipment
![Page 33: Project: The Franklin Care Center: Addition and renovation Location: Franklin Lakes, New Jersey](https://reader036.fdocuments.us/reader036/viewer/2022062816/5681530b550346895dc130ea/html5/thumbnails/33.jpg)
Conclusion
Thank you!Professionals:HLB Lighting designBeckhard Richland Szerbaty + AssociatesEdwards & ZuckMr. Ted DannerthFaculty:Dr. MoeckDr. MistrickProfessor Parfitt