PROJECT OVERVIEW & BACKGROUND PROJECT OVERVIEW & BACKGROUND PROJECT OVERVIEW & BACKGROUND. In 2012,

download PROJECT OVERVIEW & BACKGROUND PROJECT OVERVIEW & BACKGROUND PROJECT OVERVIEW & BACKGROUND. In 2012,

If you can't read please download the document

  • date post

    11-Jul-2020
  • Category

    Documents

  • view

    2
  • download

    0

Embed Size (px)

Transcript of PROJECT OVERVIEW & BACKGROUND PROJECT OVERVIEW & BACKGROUND PROJECT OVERVIEW & BACKGROUND. In 2012,

  • JEFFERSON DR.

    CASTLE GARDEN ENTRY

    AIB SOUTH ENTRY

    HIRSHHORN SOUTH ENTRY

    AIB WEST

    ENTRY

    NMAFA ENTRY

    SACKLER ENTRY

    RIPLEY CENTER ENTRY

    FREER SOUTH ENTRY

    CASTLE MALL

    ENTRY

    AIB NORTH ENTRY

    FREER NORTH ENTRY

    AIB EAST ENTRY

    7T H

    S T.

    12 TH

    S T.

    INDEPENDENCE AVE.

    9T H

    S T.

    10 TH

    S T.

    PROJECT OVERVIEW & BACKGROUND

    PROJECT OVERVIEW & BACKGROUND In 2012, the Smithsonian Steering Committee developed project goals and priorities for the South Mall area.

    An existing conditions survey was conducted that included testing initial planning options for their feasibility in meeting Smithsonian requirements.

    The major projects below were the impetus of the Master Plan effort, and regardless of the Alternative chosen will need to be addressed.

    CASTLE RENOVATION AND SEISMIC UPGRADE The Smithsonian Institution Building (Castle) is in need of a major building restoration and renovation. Part of that restoration will be to upgrade the building’s capacity to resist a seismic event.

    EXISTING CAMPUS SITE PLAN

    VISITOR CENTER & EDUCATION SPACE The Castle and the Quadrangle building currently hold a large amount of administrative offices that take away space from the public functions of the buildings. The Smithsonian hopes to relocate these offices during the course of this project to utilize the buildings for more public functions such as gallery and gathering spaces.

    MECHANICAL SYSTEMS UPGRADE The buildings on the South Mall Campus range from 30 - 160 years old and their mechanical systems will soon all need to be replaced to increase efficiency and reduce repair and maintenance costs.

    HIRSHHORN MUSEUM ENVELOPE IMPROVEMENTS The exterior of the Hirshhorn will soon need to be repaired and improved to meet current museum environmental standards.

    CAMPUS WIDE PERIMETER SECURITY The South Mall Campus preliminary perimeter security plan has not been implemented.

    QUADRANGLE ROOF REPAIR The roof of the quadrangle building currently leaks. To repair this leak the Haupt Garden will have to be removed and replaced to gain access to the roof membrane beneath the garden.