Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

13
Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP

Transcript of Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

Page 1: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

Project Management

MS Project: How to use effectively?

Mustafa HAFIZOĞLU, M.Sc.,PMP

Page 2: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

PMBOK 5th Edition Project Management Institute.

Page 3: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

1. Develop statement of work

2. Define work breakdown structure

3. List resources needed

4. Estimate time required

Vonderembse, Mark A., and Gregory P. White. Core concepts of operations management. John Wiley & Sons Inc, 2003.

Page 4: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

CELLUAR PHONE

JPHONE-1.0

Project Management

Systems Management

Hardware Design

Embedded SoftwareDesign

IntegratonPrototype Produciton

WBS FIRST LEVEL

Page 5: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

Project Management

Project Management Plan

Monitoring & Control Structure

WBS SECOND LEVELSystems

Management

Requirements Management

Systems Analysis

Page 6: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

Hardware Design

PCB Design

Mechanical Design

Component Selection

Interface Design

WBS SECOND LEVEL

Page 7: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

Embedded Software Design

FPGA Firmware

DSP Software Package

Driver Software

WBS SECOND LEVEL

Page 8: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

Integration & Test

Hardware-Software Integration

High-Low Temp. Test

Vibration Test

WBS SECOND LEVEL

Page 9: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

Prototype Production

Electronic Card Production

Interconnection Cable Production

Mechanical Production

WBS SECOND LEVEL

Page 10: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

CELLUAR PHONE

JPHONE-1.0

Project Management

Systems Management

Hardware Design

Embedded SoftwareDesign

IntegratonPrototype Production

PM Plan

Mon.& Cont

RM

Systems An.

PCB

Mechanical

Component

Interface

FPGA

DSP

Driver

HW&SW

Temp.

Vibration

Card

Cable

Mechanic

WBS:DEVELOPING A PHONE

Page 11: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

Kerzner, Harold R. Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons, 2013.

In planning a project, the project manager must structure the work into small elements that are:

Manageable, in that specific authority and

responsibility can be assigned,

Independent, or with minimum interfacing with

and dependence on other ongoing elements,

Integratable so that total package can be seen,

Measurable in terms of progress,

Page 12: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

Copyright © 2014 Pearson Education, Inc. Publishing as Prentice Hall.

Work Packages are individual project activities

1.0

1.2 1.3 1.4

1.2.1

1.2.2

1.2.3

1.3.1

1.3.2

1.2.3.1

1.2.3.2

Deliverables are major project components

Sub-deliverables are supporting deliverables

The project is the overall project under development

Page 13: Project Management MS Project: How to use effectively? Mustafa HAFIZOĞLU, M.Sc.,PMP.

Vanhoucke, Mario. Project management with dynamic scheduling. Springer, Berlin, 2012.

• Resource-leveling aims at the construction of a

precedence and resource feasible schedule within a

deadline with a resource use that is as level as possible.

• In order to avoid jumps from peaks to low resource

demands, the total use of all resources needs to be

balanced over the total schedule horizon.

• Minimize the absolute or squared deviation of the

resource use from a given resource availability