Project Engineer

4
RESUME LAKSHMANAN SATHEESHKUMAR Mobile : +65 9085 3526 E-mail : [email protected] Education : BE (Mechanical) Experience : 4 years – Mechanical Engineer Relocation : Yes – Internationally CAREER OBJECTIVE I’ve a keen interest to work as a key member in Mechanical Department and have a motivation to do better in the Project and Plant Maintenance. To be reduced the Project and Maintenance cost through by implementing the innovative techniques and improved methods. PRESENT COMPANY’S PROFILE Period : Feb 2014 to till date Company : Hai Leck Engineering (S) Ltd Hai Leck is a Singapore based company that provides Engineering, Procurement and Construction (EPC) to Oil & Gas, Petrochemical, Pharmaceutical and Utilities Industries. It had been established in 1975; Hai Leck is presence in Singapore, Malaysia, Middle East, Thailand and Vietnam. Hai Leck undertakes the Projects as well as Maintenance services on routine and turnaround basis. Hai Leck also provides the Project and Maintenance services through our Group of companies. PREVIOUS COMPANY’S PROFILE Period : June 2010 to Dec 2013

Transcript of Project Engineer

Page 1: Project Engineer

RESUME LAKSHMANAN SATHEESHKUMAR

Mobile : +65 9085 3526E-mail : [email protected] : BE (Mechanical) Experience : 4 years – Mechanical EngineerRelocation : Yes – Internationally

CAREER OBJECTIVE

I’ve a keen interest to work as a key member in Mechanical Department and have a motivation to do better in the Project and Plant Maintenance. To be reduced the Project and Maintenance cost through by implementing the innovative techniques and improved methods.

PRESENT COMPANY’S PROFILE

Period : Feb 2014 to till date

Company : Hai Leck Engineering (S) Ltd

Hai Leck is a Singapore based company that provides Engineering, Procurement and Construction (EPC) to Oil & Gas, Petrochemical, Pharmaceutical and Utilities Industries. It had been established in 1975; Hai Leck is presence in Singapore, Malaysia, Middle East, Thailand and Vietnam. Hai Leck undertakes the Projects as well as Maintenance services on routine and turnaround basis. Hai Leck also provides the Project and Maintenance services through our Group of companies.

PREVIOUS COMPANY’S PROFILE

Period : June 2010 to Dec 2013

Company : Tamil Nadu Petroproducts (I) Ltd (TPL)

TPL is a continuous Process Petrochemical Industry. A Joint venture between M/s SPIC & TIDCO had been started in 1984, consists of three plants. Plant-I produces Linear Alkyl Benzene (LAB), the raw material for manufacture of Detergents. Plant-II produces Epichlorohydrin (ECH) and Plant-III produces Caustic Soda. TPL operates with ISO: 9001-2008 & ISO: 14001-2004 procedures. TPL has been implemented the SAP R/3 4.0 B and 4.6 C version in the year of 1999 and 2002 respectively and upgraded with 5.0 versions.

PROFESSIONAL EXPERIENCE

Page 2: Project Engineer

Over 4 years of experience in Project Execution, Construction, Maintenance and Reliability in the Petrochemical Industries.

Highly skilled in Mechanical Maintenance with all kind of Piping, Static & Rotating equipment.

Prepare the Project proposals, Planning and monitoring in close conformance of Contractual obligations with Clients.

Develop the BOM, Cost estimation and Scope finalization.

Develop the Design documents with help of design team and various other discipline Engineers.

Developed the spare parts Planning, Purchasing and provide Stock levels. Designed the Process piping, Static & Rotating equipment by using the Codes & Standards of

ASME, API, ANSI, & TEMA. Well versed in preparation of Data sheets as well as Scope of works.

Worked on Cost estimation by getting the quotations of all material from service works Contractors.

Prepared the Design package including Plot plans, Details Engineering of Piping and equipment with BOM and Piping Flexibility Analysis etc.,

Planned and scheduled the jobs and materials by raising POs for all non-stock materials. Raised the Scope of work to get a Service team. Reviewed Bids, Pre-bid meetings, selection of vendor and place a PO for various materials to

initiation of the works. Review of schedule, bar chart, manpower, tools and tackles loading. Troubleshoot and maintained the Static (Pressure vessels, Exchangers, Piping, Tanks etc.) &

Rotating equipment’s (Pumps, Compressors, Turbines and fans etc.). Created Plant Maintenance Module & Lubrication Schedules for all Static & Rotating

equipment’. Replaced and repaired the Distillation column, Piping, Fired heater and Refractory linings.

PROJECT EXPERIENCE

Planning and preparing to execute Turnaround work activities on heat exchangers in Exxon Mobil, PAC, Singapore.

Completed a Project work under Capital budget around INR 965000. Procured, installed and commissioned a Flaktwood Blower to deliver the fresh air for ventilation of DG room with a capacity of 115000 cubic meters.

Waste heat recovery boiler’s coil bundle has been replaced under Capital budget head and Coordinated with the fabrication team of coil fulfilling as per IBR requirements as well as Installed and commissioned respectively.

Page 3: Project Engineer

Completed another Project work under Capital budget around INR 3550000, to replaced 3 numbers of corroded DG chimney shaft in 3 DGs with each 60 meter height.

SINGAPORE WORKFORCE SKILLS QUALIFICATIONS COURSES

WSQ Supervise Workplace Safety and Health in process Plant WSQ Supervise Work in Confined Space Operation Work At height (Supervisor) Building construction Supervisors safety Course

EDUCATIONAL QUALIFICATION

B.E. -Mechanical Engineering, 1st class with distinction (83%)

SKILLS

Computer proficiency: SAP, Auto CAD-2000, Windows-2010, MS-Excel, MS WORD, MS, Typing- Lower

ADDITIONAL INFORMATION

Singapore permit type: S PassPassport No.: K7219438NRIC no.: G3011334PResidential Address: 273D Jurong West Ave 3

#13-47Singapore 644273

Current Salary: S$ 2600Expected salary: S$ 3600 (negotiable)