    R.Kannan

    MODULE - 9

    TECHNICAL ASPECTS

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    2/26

    R.Kannan

    2

    Technical Aspects

    1. Locational Aspects

    2. Technology Selection

    3. Technology Content4. Nature of Collaborators

    5. Machinery Procurement

    6. Project Implementation

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    3/26

    R.Kannan

    3

    Locational Aspects

    Increasing sizes of industrial units andenvironmental concerns are leading to shift oflocation of industrial units away from urbancentres.

    Locational Criteria

    a) Cost of bringing raw materials and productevacuation.

    Port and size of vessels to be handled (draft)

    Pipelines, rail and road facilities

    Hazards associated with raw materials/productstransport

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    4/26

    R.Kannan

    4

    Locational Criteria

    b) Environmental Aspects:

    Land locked location Availability of common facilities

    Damage to endangered species (submarine pipelines)

    Concentration of fishing industry

    Damage to the soil/water and its impact on agriculture

    Size of the population and air pollution

    Environmental clearances

    Rehabilitation in hydroelectric power projects

    c) Quality and availability of infrastructure

    - Power, Water, Roads

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    5/26

    R.Kannan

    5

    Locational Criteria

    d) Downstream and upstream industries

    e) Labour Policy of the State governmentf) Perishable nature of raw material/product

    Cases: Inland Refineries

    Cement PlantsAuto assembly units

    Distillery units

    Chemical units

    Power and water intensive units

    ExplosivesSugar units

    Carbon Black

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    6/26

    R.Kannan

    6

    Technology SelectionIndustry is getting increasingly globalised with increasing sizes and

    reducing energy consumption levels to make it internationallycompetitive.

    Criteria for Technology Selection:

    a) Proveness of Technologystate of the art

    b) Collaborators background, his standing in the industry, size and

    nature of the operations.c) Collaborators financial, technical, organisational and research

    strengths

    d) Collaborators technical manpower resources and ability toprovide in plant training

    e) Details of plants set up based on the technology and theirperformance.

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    7/26

    R.Kannan

    7

    Technology Selection (contd.)Criteria for Technology Selection:

    f) Capacity of the plant proposed - MESg) Raw materials envisaged for the project

    h) Desired product range

    i) Government Policies

    j) Minimising the overall cost representing the sum ofoperating cost and capital related charges

    k) Nature of the product (commodities/ specialties)

    l) Plant flexibilityfrequency of shutdown, change over

    m) Sophistication

    Cases: Technology from R&D units

    East European Technologies

    Raw material issues (Petrochemicals, steel, paper)

    Product range (Plastics, automobiles) GHCL

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    8/26

    R.Kannan

    8

    Technology Fees

    Fees are small as compared to project capital/ operating costs

    (around 5 to 8%) and hence are less important in technologyselection. Optimising the total cost of production is the key.

    a) One Time License Fee Benefits company when the business risk is less

    b) Recurring Royalty as percentage of sales

    Benefits company in high risk businessesc) Issue of equity to the collaborator

    Adopted by companies in either high risk cases or involvement ofcollaborator is required continuously for supplies, technologyupgradation and market development.

    Normally overall compensation to the collaborator is a combinationof the above.

    RK

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    9/26

    R.Kannan

    9

    Guarantees and Penalties

    Again penalties are small (around 10 to 15% of the fees)

    and hence the collaborators reputation is important.

    Plant capacity

    Consumption of inputs

    Quality of product (100% penalty)

    Plant workmanship / Performance

    RK

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    10/26

    R.Kannan

    10

    Technology Content

    Licensor (Suzuki, Mitsubishi, Shell)

    1. Basic data of manufacture

    2. Plant Operating know-how

    3. Product application/product design know-how

    4. Operational Training

    5. Supply of Imported components/consumables6. Consent to allow the use of trademark

    7. Protection against patent infringement

    8. Exclusivity

    9. Right to sublicense the know-how10. Right to export

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    11/26

    Technology Content (contd.)

    Equipment Designer (ABB, Siemens, L&T, BHEL)

    1. Basic design of equipment based on licensor of product / process2. Supply of imported equipment

    3. Inspection of equipment

    4. Supervision of erection and commissioning

    5. Plant Maintenance procedures

    Detailed Engineer (Powergas, Uhde)

    1. Design of auxiliary items such as power and water supply, effluenttreatment, storage etc., which are not plant specific.

    2. Supply / Inspection of local fabricated equipment.

    FabricatorsWork for equipment designer / detailed engineer

    RKannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    12/26

    R.Kannan

    12

    Technology Content (contd.)

    In many plants such as power, cement etc., the entirerole may be performed by only one party. In the caseLumpsum Turnkey Contracts (LSTK) the entire

    technology / equipment is supplied by a single vendor ata fixed price.

    RKannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    13/26

    R.Kannan

    13

    Nature of Collaborators

    Advantages -A. Manufacturers of product

    Product knowledge / upgradation

    Easier to evaluate technology performance

    Can provide better operating and application know-how Can design multipurpose plants

    Can use renowned trademarks.

    Procuring/Patented know-how

    Cases: Dupont/Reliance, Toray/Raymond; Century Enka/EnkaHindustan Motor/Mitsubishi, Hero/Honda, Bajaj Auto/Kawasaki

    RKannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    14/26

    R.Kannan

    14

    Nature of Collaborators (contd.)

    B. Project Engineering Companies

    Better selection and procurement of equipment and erection

    services

    Lower fees

    BHEL/Powerplants, Larsen & Toubro/Cement plants

    Inventa AG/DCL Polyester

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    15/26

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    16/26

    R.Kannan

    16

    Procurement of Machinery

    1 Inhouse Fabrication Small items like vessels or simple

    critical items

    2 Direct Purchase Repeat purchase of small standardequipment, spares

    Proprietary equipment

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    17/26

    17

    Criteria for Selection

    a) Experience of the vendor in the relevant line and past performance with

    respect of quality, reliability and efficiency ascertained from earlier users

    b) Size of the vendor

    c) Financial position of the vendor

    d) After sales service / spare parts

    e) Delivery schedules

    f) Price and payment terms

    g) Order book position of the vendor vis--vis his capacity

    Procurement of Machinery

    3 Limited Tendering Multiple vendors and large value

    equipment

    4 International Competitive bidding

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    18/26

    18

    Schedule of Implementation

    A. General: Bar Charts CPM charts

    Critical Activities the management / lenders to concentrateimportant for lenders

    Impact on cost of project if certain critical activities areexpedited incurring additional costimportant for projectmanagement

    B. CPM: Activity is a definite task, job, function (with head and tail of

    the arrow signifying beginning and end of activity)

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    19/26

    19

    C. Problem:

    Activity Time Taken (Months) No.*

    Land acquisition / roads / civil construction 13 1 - 2

    Design of equipment / ordering 12 13

    Delivery of equipment 8 34

    Foundation 2 24

    Utilities 15 25Erection and equipment commissioning 2 4 - 5

    * 1 -2 indicates that land acquisition / roads / civil construction will start at 1 and

    End at 2 after 13 months

    ** Activities have an order; 3-4 cannot start before 13; (i.e) unless the equipmentis designed and ordered, delivery cannot take place

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    20/26

    20

    Network Diagram

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    21/26

    21

    Calculation of Earlier Occurrence Time (EOT)

    Event EOT

    1 0

    2 13

    3 12

    4 20

    5 28

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    22/26

    22

    Calculation of Latest Occurrence Time (LOT)

    Event LOT

    1 0

    2 13

    3 18

    4 26

    5 28

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    23/26

    23

    Event EOT LOT

    1 0 02 13 13

    3 12 18

    4 20 26

    5 28 28

    1 -2 -5 is critical path

    Land Acquisition /Civil construction

    Utilities

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    24/26

    24

    Special issues in Infrastructure projectsA) Toll Road Projects

    a) Traffic studies

    -Population modelling (growth, migration)

    - Trip generation (willingness to pay, origin and end of journey)

    - Trip distribution (growth, simulation of traffic)

    - Econometrics (trends, future estimation)

    - Other cash flows (advertising)

    -

    Traffic diversion (alternate routes)- Land use (accessibility of toll way, traffic history regressions)

    - Selection of toll booth site / toll optimisation

    - Mode of transport

    - Traffic assignments (counts, time saved, time value of money, preferences)

    - Hassle factors (ease of use, parking)

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    25/26

    25

    Special issues in Infrastructure projectsA) Toll Road Projects

    b) Traffic forecasting

    -Potential users (existing)

    - How many of current users will use toll road (advantages of toll road,willingness to pay, total cost saved)

    - Growth of traffic in the recent past (volume)

    - Growth in economic activity

    - Growth in employment

    c) Model

    - Design a model for potential traffic through economic, demographic, markettrends

    - Factor in willingness to pay and user benefits to arrive at traffic revenue

    - Toll is a function of cost saved

    - Cost saved = (differential distance X vehicle operating cost)

    + (differential travel time X value of time)

    + Motorway bonus (safety, convenience)

    R.Kannan

  • 8/11/2019 Project and Infrastructure Finance Slides Module9_Ver2

    26/26

    26

    Special issues in Infrastructure projectsB) Power

    - Review design, EPC and construction management (LE)

    -Completion / performance guarantees and liquidated damages (LE)

    - Cost estimate, schedule (LE)

    - Study the enforceability of contracts (LC)

    - Logistics (LE)

    - Conduct / review Environment Impact Assessment (EIA) study

    C) Resources (oil, mining)- Reserve estimation

    - Production cost

    - Environment

    D) Telecom

    -Subscriber studies

    - Obsolence of technology

    - Initial large equity