Progress with Block Operational Plan
Project Karuna
![Page 2: Progress with Block Operational Plan Project Karuna.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697c0221a28abf838cd3240/html5/thumbnails/2.jpg)
Project Area/Partner OrganizationJharkhand
District Block Panchayat Partner
Gumla Gumla Sadar 25 (107 villages)
Vikas Bharti
Uttar Pradesh
District Block Panchayat Partner
Varanasi Pindra 38 (97 villages)
SRF
![Page 3: Progress with Block Operational Plan Project Karuna.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697c0221a28abf838cd3240/html5/thumbnails/3.jpg)
The Model
Block Operational Plan
![Page 4: Progress with Block Operational Plan Project Karuna.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697c0221a28abf838cd3240/html5/thumbnails/4.jpg)
Preparatory ActivitiesPlanned Status
Orientation of Partners on the project State and District Level Launch Staff recruitment District & Block Level Sensitization Reporting Software In process
Training guidelines and Modules In process
Baseline study In process
Orientation of FHW, PRI & SHG members In process
![Page 5: Progress with Block Operational Plan Project Karuna.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697c0221a28abf838cd3240/html5/thumbnails/5.jpg)
Other Studies being planned
• Household Economic Analysis• SQUEAC Assessment • Cost Effectiveness
![Page 6: Progress with Block Operational Plan Project Karuna.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697c0221a28abf838cd3240/html5/thumbnails/6.jpg)
Challenges• Supplementary Food for SAM- Awaiting
Govt. of India response
• An attempt with Hyderabad Mix – Average weight gain 2.3/g/kg/d, LOS 66 days– It has to be reconstituted and difficult to monitor the
consistency. – The mothers are working and so find it difficult to
prepare Hyderabad mix 6-7 times a day– Large scale programme is a challenge