Progress with Block Operational Plan Project Karuna.

7
Progress with Block Operational Plan Project Karuna

Transcript of Progress with Block Operational Plan Project Karuna.

Page 1: Progress with Block Operational Plan Project Karuna.

Progress with Block Operational Plan

Project Karuna

Page 2: Progress with Block Operational Plan Project Karuna.

Project Area/Partner OrganizationJharkhand

District Block Panchayat Partner

Gumla Gumla Sadar 25 (107 villages)

Vikas Bharti

Uttar Pradesh

District Block Panchayat Partner

Varanasi Pindra 38 (97 villages)

SRF

Page 3: Progress with Block Operational Plan Project Karuna.

The Model

Block Operational Plan

Page 4: Progress with Block Operational Plan Project Karuna.

Preparatory ActivitiesPlanned Status

Orientation of Partners on the project State and District Level Launch Staff recruitment District & Block Level Sensitization Reporting Software In process

Training guidelines and Modules In process

Baseline study In process

Orientation of FHW, PRI & SHG members In process

Page 5: Progress with Block Operational Plan Project Karuna.

Other Studies being planned

• Household Economic Analysis• SQUEAC Assessment • Cost Effectiveness

Page 6: Progress with Block Operational Plan Project Karuna.

Challenges• Supplementary Food for SAM- Awaiting

Govt. of India response

• An attempt with Hyderabad Mix – Average weight gain 2.3/g/kg/d, LOS 66 days– It has to be reconstituted and difficult to monitor the

consistency. – The mothers are working and so find it difficult to

prepare Hyderabad mix 6-7 times a day– Large scale programme is a challenge