Integrated master schedule for strategic initiatives Brad Ring 1 Article extract: Create integrated master schedule to manage work packages and track critical path for multiple strategic vendors. Keywords: Integrated master schedule, MS Project, Strategic vendor evaluation ,Technology leadership, System engineering, Transportation, tolling, ITS, intelligent transportation system, fiber optic cable, system integration, design review, requirements review, cap ex, op ex, testing, review, schedule, scalability, maintainability. [email protected]

description

Create integrated master schedule to manage work packages and track critical path for multiple strategic vendors.

Transcript of Program management integrated schedule

Page 1: Program management integrated schedule

Integrated master schedule for strategic initiatives Brad Ring

1

Article extract:

Create integrated master schedule to manage work packages and track critical path for multiple strategic vendors.

Keywords: Integrated master schedule, MS Project, Strategic vendor evaluation ,Technology leadership, System engineering, Transportation, tolling, ITS, intelligent transportation system, fiber optic cable, system integration, design review, requirements review, cap ex, op ex, testing, review, schedule, scalability, maintainability. [email protected]

Page 2: Program management integrated schedule

Methodology

2

Create and maintain integrated master schedule to include activities for all key stakeholdersIdentify critical paths, dependencies, payment milestones, constraints, delays, progress, resources and deadlines. Develop work packages for each tolling site installation.

Gain consensus for optimized installation and testing sequence.

Assess schedule risk, develop mitigation strategies and restructure schedule as conditions evolve. Update and distribute weekly based on progress of all

parties.

Page 3: Program management integrated schedule

Initial design

3

The example below illustrates the original design

Page 4: Program management integrated schedule

Benefits of integrated master schedule

4

Integration: Identifies key schedule dependencies and risks.

Resource management: Enables all system integrators to plan

appropriate resources based on scheduled activities and milestones.

Service Commencement date: Allows all vendors to work together to ensure achieve SCD.

Page 5: Program management integrated schedule

Participating stakeholders

5

Brad Ring Multiple system integrators