Transcript of Production Part Approval Process Justin Pitts. Design Records Authorized Engineering Change...
![Page 1: Production Part Approval Process Justin Pitts. Design Records Authorized Engineering Change Documents Customer Engineering Approval, if required.](https://reader036.fdocuments.us/reader036/viewer/2022082417/56649f165503460f94c2c3d0/html5/thumbnails/1.jpg)
Production Part Approval Process
Justin Pitts
![Page 2: Production Part Approval Process Justin Pitts. Design Records Authorized Engineering Change Documents Customer Engineering Approval, if required.](https://reader036.fdocuments.us/reader036/viewer/2022082417/56649f165503460f94c2c3d0/html5/thumbnails/2.jpg)
Design Records Authorized Engineering Change Documents Customer Engineering Approval, if required Design Failure Modes and Effects Analysis (DFMEA)
applied in special situations Process Flow Diagram Process Failure Modes and Effects Analysis (PFMEA) Control Plan Measurement Systems Analysis (MSA) Dimensional Results Records of Material / Performance Test Results Initial Sample Inspection Report Initial Process Studies Qualified Laboratory Documentation Appearance Approval Report (AAR) Sample Production Parts Master Sample Checking Aids Customer-Specific Requirements Part Submission Warrant (PSW)
Elements of a PPAP
![Page 3: Production Part Approval Process Justin Pitts. Design Records Authorized Engineering Change Documents Customer Engineering Approval, if required.](https://reader036.fdocuments.us/reader036/viewer/2022082417/56649f165503460f94c2c3d0/html5/thumbnails/3.jpg)
零件 /
过程编号Part/
Process No
过程名称 / 操
作描述Process Name/Operati
on Descript
ion
机器、装置
夹具、工装
Machine、 Device
jigtools 、foreMfg
特殊特性 Special Characterist
ic
方法 Methods 反应计划 Reaction
Plan
产品 & 过程Product & Process
产品 / 过程规范 / 公差
Product/Process
Specification/Tolerance
检具Gauge
样本 Sample
控制方法Control Method
反应计划
Reaction Plan
纠正措施Corrective
Actions容量Size
频率Frequency
20 锻打Forging
热锻机床Forging Machine
毛坯长度Length
厚度Thickness
84.84 ± 0.5 mm
50.8 ± 0.75 mm (10)
REF 23.88 (16)
卡尺Caliper/
0.02
1 次 time
每 4 个小时
Each Four Hours
检验员检验
Checked by
Inspector
隔离不合格品
Quarantine
调整定位块返工
Adjust Positioning Block and Rework
圆角Radius
R 3.3 ± 0.75 (4)
R 6.35 ± 0.75 (5)
R25.4 (13)
R12.7-R19.05 mm
(6)
由模具保证Control by Pattern
隔离不合格品
Quarantine
调整定位块返工
Modify Tooling and
Rework
毛刺burrs
无毛刺
No burrs (19)
目测Visual Inspection
100﹪
操作员检验
Checked by
Operator
隔离不合格品
Quarantine
返工 Rework
![Page 4: Production Part Approval Process Justin Pitts. Design Records Authorized Engineering Change Documents Customer Engineering Approval, if required.](https://reader036.fdocuments.us/reader036/viewer/2022082417/56649f165503460f94c2c3d0/html5/thumbnails/4.jpg)
Quality Action PlanDeveloped as a means of identifying specific historical quality problems and implementing a plan of action for each if necessary.
as of 1/4/13
PART #Quality Issues found within past 6
monthsQuantity in Inventory
Open Order
QtyQty
AvailableIn-Transit
to Warehouse
WIPDate of last production
run
Estimated Month WIP parts will
arrive
Estimated Month parts will arrive with CMM
reportsVendor's Plan of Action
107-03-0030 GOOD 68 10 58 0 0 Oct 2013 n/a n/a n/a
107-03-0042 GOOD 1,373 0 1,373 0 0 Nov 20123 n/a n/a n/a
501-03-1214
Counterbore not machined, 6.00" Bolt Hole, Runout, Surface Finish,ID/Bolt hole Porosity
causing leaks 0 150 0 230 450 current April April
951pcs returned to the factory for reworking (will stamp "R" for
traceability), every 10th part requires CMM report
501-03-1301 GOOD 466 0 466 0 0 Nov 2013 n/a n/a n/a
501-03-1316
Runout on lands, porosity on ID lands and side causing leaks 91 0 91 0 131 current July July
Vendor to request leak testing and every 10th part requires CMM report
501-03-1344
various issues on diameter and runout (refer to CMM reports) 60 0 60 0 0 Mar 2012 n/a TBD, slow moving
60pcs to be sent stateside for CMM inspection, request every 10th part requires
CMM report on future production
501-06-0838 internal porosity, improvement to concentricity 11 0 11 0 120 current Feb n/a
Vendor to supply 0839 to avoid internal porosity issues
501-06-0773 surface defects on top casting surface, bolt hole porosity 508 100 408 0 0 May 2012 n/a n/a
Qty on hand has been 100% sorted for surface defects, 561pcs returned to the factory for reworking (will stamp "R" for
traceability)
501-07-0140 ID groove undersized (2.900"-2.920" measured 2.898") 540 200 340 0 1,000 current Feb n/a
perform capability study on ID groove, 100% inspect prior to shipment
501-07-0142 GOOD 737 150 587 0 750 current August n/a n/a
501-08-1267 bore to base dimension and bore diameter slightly over tolerance 810 0 810 0 0 May 2012 n/a n/a perform capability study on bore diameter and bore to base dimensions
501-08-1371 90mm±0.5 measured 82.85mm 8 0 8 0 0 Sept 2011 n/a n/a investigate and complete a CAR
501-08-1375 GOOD 10 0 10 90 0 current n/a n/a n/a
501-08-1376 GOOD 3,145 200 2,945 0 0 Mar 2012 n/a n/a n/a
501-08-1147 1.969±0.010" measured 1.954" 2,746 0 2,746 0 0 Jan 2012 n/a n/a 100% inspect CAB inventory and complete a CAR
![Page 5: Production Part Approval Process Justin Pitts. Design Records Authorized Engineering Change Documents Customer Engineering Approval, if required.](https://reader036.fdocuments.us/reader036/viewer/2022082417/56649f165503460f94c2c3d0/html5/thumbnails/5.jpg)