1. P4.0 Schedule update 2. Brief Overview of P4.0 3. Review of Statewide Mobility programmed projects in P4.0 4. Review of DRAFT list of Regional Impact projects proposed for local input points assignment 5. P4.0 Regional Impact public involvement schedule
Overview
• April 13 NCDOT Release Two week delay P4.0 scores for all projects Draft Statewide Mobility Programmed
Project List Data on CRTPO’s P4.0 Webpage
P4.0 Data Release
• Revised Regional Impact local input point allocation window – Moved end date from May 31 to June 30 – 75 Day Window – Local contribution for Regional Impact
projects by June 15 MPO meeting.
What does this mean?
Statewide Mobility Highway Scoring
Regional Impact Highway Scoring
Eligibility Criteria Ranking Congestion
Travel Time Benefit / Cost
Safety
Freight
Accessibility / Connectivity
Statewide Mobility Projects
70% Data
15% NCDOT
Divisions
15% MPO/ RPO
Criteria and Weights by STI tier
Congestion 30% Congestion
20% Congestion 15%
Travel Time/ Benefit Cost
25%
Travel Time/ Benefit Cost
20% Travel Time/ Benefit Cost
15%
Safety 15%
Safety 10%
Safety 10%
Freight 15%
Freight 10%
Freight 5%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Statewide Mobility Regional Impact Division Needs
Economic Competitiveness
10% Local Input Points 30%
Accessibility/Connectivity 5%
Accessibility/Connectivity 10%
Local Input Points 50%
Multimodal 5%
Local Input Methodology
In accordance with North Carolina’s General Statutes, each Metropolitan Planning Organization shall… Adopt a local methodology for project prioritization
Including quantitative data, qualitative input, and multimodal characteristics
To be approved by NCDOT
Receive local input points based upon population
Place no more than 100 local input points on any one project
Phases of Prioritization
PHASE 5: December 2016 DRAFT 2018-2027 STIP is released.
PHASE 4: October-November 2016 NCDOT calculates final scores and programs projects.
PHASE 3: April – September 2016 Local Input Points assignment by MPOs, RPOs and NCDOT Divisions.
PHASE 2 : November-March 2016 SPOT Office reviews and scores all projects submitted throughout NC.
PHASE 1: July-October 2015 MPOs, RPOs and NCDOT Divisions identify projects to submit for P4.0.
• Fully Funded: Project has adequate amount of funding to be delivered in 2018-2027 TIP
• Partially Funded: Project construction cost exceeds 10-year TIP development window
• Unfunded: – Project cost exceeded corridor cap – Project did not score high enough to be
funded in P4.0.
Statewide Mobility P4.0 Status
Statewide Mobility – Funded Projects
Project Name Jurisdiction DRAFT ROW Date
DRAFT Construction
Date
Cost to NCDOT
(millions of $)
Full or Partially Funded in 2018-
2027 TIP?
US 74 & Secrest Shortcut Road Intersection Improvements Monroe 2022 2024 $2.7 Fully Funded
I-77 & Cornelius Road Interchange Conversion Mooresville 2022 2024 $25.0 Fully Funded
I-485 & Providence Road Interchange Improvements Charlotte 2022 2024 $41.3 Fully Funded
I-77 Widening (Woodlawn Rd – Belk Freeway) Charlotte 2024 2027 $98.6 Partially Funded
– Corridor Cap
I-77 Widening (I-485 to Woodlawn Rd) Charlotte 2024 2027 $326.2 Partially Funded
– Corridor Cap
I-77 & Brookshire Freeway Interchange Improvements Charlotte 2024 2027 $101.6 Partially Funded
– Corridor Cap
Statewide Mobility – Unfunded Projects
Project Name Jurisdiction
Cost to NCDOT
(millions of $)
P4.0 Score Status
I-77 General Purpose Lane Widening (Catawba Ave – NC 150)
Cornelius Davidson
Mooresville $166.0 75.04 Cost exceeds I-77 corridor cap
I-77 & I-277 (Belk Freeway) Interchange Improvements Charlotte $129.6 72.68 Cost exceeds I-77 corridor cap
I-77 & Sunset Road (US 21) Interchange Improvements Charlotte $41.3 70.69 Cost exceeds I-77 corridor cap
I-77 Widening (NC 150 to I-40) Mooresville Troutman Statesville
$354.9 69.16 Cost exceeds I-77 corridor cap
I-485 & Brookshire Boulevard (NC 16) Interchange Imps. Charlotte $14.2 64.84 Could not be funded in
Statewide Mobility tier
I-77 Widening (Belk – Brookshire Freeways) Charlotte $347.1 61.31 Could not be funded in
Statewide Mobility tier
US 74 Widening (Hanover Drive to Rocky River Road) Monroe $16.4 51.20 Could not be funded in
Statewide Mobility tier
US 74 Bypass – New Location (Monroe Bypass to Marshville Waterplant Road)
Marshville $151.7 41.77 Could not be funded in Statewide Mobility tier
• Meeting today – Developed draft list of Regional Impact projects
for point assignment – Based upon approved CRTPO/SPOT
methodology – Will meet next week to coordinate with Division
10 and 12 Methodology – List will be shown to TCC with request to open
public involvement at May 5 TCC meeting • Future meetings
– Develop draft list of Division Needs projects for point assignment
P4.0 Subcommittee
Local Input Points Assignment
• A Quantitative process – projects that had the highest MTP score or P3.0 score received points regardless of geography
NCDOT Funding Regions
CRTPO Local Input Points for
Regional Impact Projects
Highway Projects
Local Input Points
Proposed
Non-Highway Projects
Local Input Points
Proposed
Region E (Mecklenburg, Union)
2,500 17 1,720 3 280
5 500 0 0 Region F (Iredell)
TOTALS 22 2,220 3 280
Region E DRAFT Regional Impact Highway Point Assignment (1 of 3)
Project Name Jurisdiction
Cost to NCDOT
(millions of $)
P4.0 Score (70)
MTP Score (Horizon
Year)
Recommended Local Input Points
NC 73 Widening (Vance Rd Ext – Catawba Avenue) Huntersville $18.9 45.72 173
(2025) 100 NC 73 Widening (Catawba Av – Northcross Drive) Huntersville $11.3 40.45 145
(2025) 100 US 21/Statesville Road Widening (Harris Bl – Gilead Rd)
Charlotte Huntersville $57.7 32.98 143
(2025) 100 NC 51 Widening (Matthews Township Pkwy – Lawyers Rd)
Matthews Mint Hill $43.2 37.27 142
(2025) 100 NC 16/Brookshire Blvd Improvement (Idaho Dr – I-85) Charlotte $9.5 49.68 137
(2025) 100 NC 160/Steele Creek Road Widening (SC Line – S. Tryon St) Charlotte $20.5 35.35 133
(2025) 100 NC 16 Widening (Rea Road Ext – Cuthbertson Road)
Waxhaw Weddington $52.1 43.52 132
(2025) 100 NC 115/Old Statesville Rd Widening (Harris Blvd – I-485) Charlotte $34.3 38.21 131
(2025) 100
Region E DRAFT Regional Impact Highway Point Assignment (2 of 3)
Project Name Jurisdiction Cost to NCDOT (millions of $)
P4.0 Score (70)
MTP Score (Horizon
Year)
Recommended Local Input
Points
NC 115/Old Statesville Rd (NC 73 to Washam Potts Road)
Huntersville Cornelius $33.8 32.22 128
(2025) 100 NC 73 Widening (Business NC 16 – Vance Road Extension)
Lincoln County Huntersville $90.0 43.14 129
(2030) 45 US 74 Widening (Hanover Dr – Rocky River Road) Monroe $16.4 48.93 128
(2030) 100 NC 16 Widening (Cuthbertson Rd – Waxhaw Parkway) Waxhaw $30.3 35.97 128
(2030) 100 NC 73 Widening (Davidson- Concord Rd-Poplar Tent Rd) Huntersville $26.1 46.01 124
(2040) 100 NC 115 Widening (Washam Potts Road – Potts Street) Cornelius $18.9 30.60 120
(2040) 100
Unfunded Statewide Mobility project proposed for Regional Impact local input points.
Region E DRAFT Regional Impact Highway Point Assignment (3 of 3)
Project Name Jurisdiction Cost to NCDOT (millions of $)
P4.0 Score (70)
MTP Score (Horizon
Year)
Recommended Local Input
Points
I-485 & NC 16/Brookshire Blvd Interchange Improvements Charlotte $14.2 45.72 N/A 100 I-77 & US 21/Sunset Road Interchange Improvements Charlotte $41.3 44.96 N/A 100 NC 73 Widening (NC 115 to Davidson- Concord Road) Huntersville $19.8 42.30 N/A 100 NC 27/Freedom Drive Widening (Toddville Rd – Moores Ch. Rd) Charlotte $17.0 41.61 N/A 75
Unfunded Statewide Mobility project proposed for Regional Impact local input points.
Region F DRAFT Highway Point Assignment
Project Name Jurisdiction Cost to NCDOT (millions of $)
P4.0 Score
MTP Score (Horizon
Year)
Recommended Local Input
Points
US 21/NC 115 Corridor Imp. (Cedar Av-Old Mountain Rd) Troutman $34.8 42.51 194
(2030) 100 NC 150 Widening (NC 115 to NC 801) Mooresville $28.6 45.89 141
(2040) 100 NC 115 Operations Improvement (Waterlynn Rd – Yellow Wood Dr) Mooresville $3.6 44.15 N/A 100 US 21 Widening (Medical Park Rd – NC 150) Mooresville $34.9 44.06 N/A 100 US 21 & US 64 (Five Points) Roundabout Statesville $1.1 44.01 N/A 100
Regional Impact Tier
Region E DRAFT Non-Highway Point Assignment
Project Name Mode Location
Cost to NCDOT (millions of $)
P4.0 Score (70)
Recommended Local Input
Points
Charlotte Wye Project (train turnaround) Rail Charlotte $9.1 46.20 100
Charlotte Area Service Improvement Project (element of the Gateway Station project)
Rail Charlotte $27.0 42.90 100 University City to Concord Mills Bus Route Transit
Charlotte Concord $300k 42.00 80
Regional Impact Tier
Unfunded Statewide Mobility project proposed for Regional Impact local input points.
TCC Mtg June 2
May 2 May 9 May 16 May 23 May 30 June 6 June 13 June 20 June 27
NCDOT PRIORITIZATION 4.0 REGIONAL IMPACT LOCAL INPUT POINT ALLOCATION PUBLIC INVOLVEMENT
SCHEDULE
TCC Mtg
May 5 MPO Mtg June 15
NCDOT 75-Day Regional Impact Point Assignment Window: April 18– June 30
Staff to enter point assignments into SPOT database prior to June 30
P4.0 Subcommittee develops Draft point
assignment list
February 2016 MPO Action:
Authorize TCC to open public involvement period
on draft point assignments
MPO Action: Review comments
& recommend approval of point
assignments
MPO Mtg May 18
Public Meeting on P4.0 Projects
26-Day Public Involvement Period May 6 – June 1
April 20, 2016 MPO Meeting