Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

12
Preserve Sudbury Preserve Sudbury Vote NO to the Rail Trail Articles 22-24

Transcript of Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Page 1: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Preserve SudburyP

rese

rve

Su

db

ury

Vote NO to the Rail Trail Articles

22-24

Page 2: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Sudbury needs a Vision first

Pre

serv

e S

ud

bu

ry

Vote NO

22

Page 3: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Pre

serv

e S

ud

bu

ry ►Beyond “Investigation”

Feasibility Study + Title Review (Art. #22)

+ Base Map (Art. #24)

= MassHighway Design Requirements

22

Page 4: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

10 – 14 ft

Path Width2 – 3 ft3 – 5 ft

Recovery ShoulderPre

serv

e S

ud

bu

ry

SudburyFeasibility

Study

Cleared

6 ft

Cleared

6 ft10 ft

MassHighway Design22

Page 5: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

MassHighway’s Vision?P

rese

rve

Su

db

ury

Assabet River Rail Trail in Hudson

22

Page 6: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

... or Sudbury’s Vision?P

rese

rve

Su

db

ury

Rail bed in Sudbury

22

Page 7: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Will the articles resolve unanswered questions?

Pre

serv

e S

ud

bu

ry

Feasibility Study Goals: (Promised at Town Meeting 2005)

• Impact on traffic ?• Policing costs ?• Maintenance costs ?• Impact on the community both

long term and short term ?

22

Page 8: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Pre

serv

e S

ud

bu

ry- Significant Investment

$0

$100

$200

$300

$400

$500

$600

$700

Yr 05 Yr 07 Yr 09? Yr ??

$615,000 minimum

CPA “Installments”

$25k

$170k

$285k

$615k

Consider Funding22

Page 9: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Consider Traffic & SafetyP

rese

rve

Su

db

ury

- 11 Intersections

Rail bed

Hudson Road (Sudbury Feasibility Study)

22

Page 10: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Consider the Environment- Clearing 12 Acres of Vegetation

Pre

serv

e S

ud

bu

ry

~22 ft

Rail bed in Concord

22

Assabet River Rail Trail

Cleared ~50 ft

Page 11: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Consider AlternativesAssabet River National Wildlife Refuge

Pre

serv

e S

ud

bu

ry

• Managed Refuge

• No Intersections

• NO COST

• 6+ Miles of trails

• Visitor CenterVC

• Sudbury Entrance

Hudson Rd

• Connects to the Assabet River Rail Trail

Assabet River Rail Trail 2,200 acres

22

Page 12: Preserve Sudbury Vote NO to the Rail Trail Articles 22-24.

Pre

serv

e S

ud

bu

ryRefuge BFRT

Wildlife/Habitat Monitoring

Dedicated Parking

Bathroom Facilities

Connection to Assabet River Rail Trail

No Dangerous Intersections

No Construction Costs

No Maintenance Costs

No Policing Costs

X

The Safe Alternative

XX

X

XXXX

Please Vote NO – Preserve Sudbury

22