Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312...

12
Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312 Date: March 4, 2009 Federal Aviation Administration FAA Testing Laboratory Update

Transcript of Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312...

Presented to: 32nd Annual Airport Conference – Hershey, PA

By: Jeff Gagnon, P.E. Manager AJP-6312

Date: March 4, 2009

Federal AviationAdministrationFAA Testing

Laboratory Update

January 21, 2007 2Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

Outline

• Background

• Requirements

• Layout

• Testing Equipment

• Schedule

January 21, 2007 3Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

Background• Design Started – August 2006• Bid Documents Completed – August 2008• 100% design review preformed by

Philadelphia District Army Corps of Engineers

• USACE to administer the construction contract – $1.1 million estimated construction cost

• FAA to provide construction oversight• Projected contract award February 2009

January 21, 2007 4Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

Requirements

•120 x 48 ft building ( ~5500 sq ft)

•Includes additional restrooms

•Designed for Soils, Aggregates Concrete and Asphalt testing

•AMRL Certified

•CCRL Certified

•Material Testing for others

January 21, 2007 5Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

NAPTF Laboratory

January 21, 2007 6Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

Materials Testing Lab

National Airport Pavement Test Facility

January 21, 2007 7Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

January 21, 2007 8Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

Laboratory Floor Plan

Foyer & Restrooms

Office & Meeting Room

Asphalt Lab

Concrete Aggregates

and Soil

Curing Room

Material storage

January 21, 2007 9Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

Layout – Curing Room

January 21, 2007 10Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

Testing Equipment

• Portable Seismic Pavement Analyzer for HMA and Concrete (PSPA)

• Portable Seismic Pavement Analyzer for Soils (D-PSPA)

• Asphalt Pavement Analyzer (APA) Modified or Hamburg Wheel Tracking Device

• Superpave Mix Design Equipment • Marshall Mix design Equipment • Concrete & Aggregates Equipment

January 21, 2007 11Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

Testing Equipment

Asphalt Pavement Analyzer

Hamburg Wheel Tracking Device

Portable Seismic Pavement Analyzer

January 21, 2007 12Federal AviationAdministration

FAA Pavement R&D Program UpdateMarch 4, 2009

Schedule

• Award – February 2009• Break Ground – March 2009• 6 month Construction• Completion – September 2009• Occupancy – October 2009