AUTOMATED SVI MEASUREMENTS INCORPORATING SHORT-TERM
TEMPERATURE VARIATIONSWerner Rössle
Jurie TerblanchèERWAT
WISA April 2010
1
![Page 2: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/2.jpg)
CONTENT• Background• Experimental• Results
– Batch tests conventional SVI– On-line tests automated on-line SVI monitoring at full-
scale reactor – Modelling SVI combined with both MLSS
concentration and sample temperature from on-line data
• Conclusions• Project summary• Acknowledgements
2
![Page 3: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/3.jpg)
BACKGROUNDSludge Volume Index (SVI) test • Developed 1934, procedure simple, fast, widely used, data• SVI of < 100 to 150 ml/g indicates a well-settling sludge• Temperature dependency generally not considered, and
compensation methods usually not implemented
Standard methods (APHA, 1998) SVI test procedure• Sample of known MLSS concentration, 1 litre cylinder,
stirred, 30 minute settling• Settled sludge volume read off cylinder wall• SVI = settled sludge volume (ml/l) / MLSS concentration (g/l)• Sample temperature kept constant at reactor (basin)
temperature during SVI settling test – no procedure provided3
![Page 4: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/4.jpg)
EXPERIMENTAL(1) BATCH TEST Basic sludge settling test in cylinders
4
![Page 5: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/5.jpg)
EXPERIMENTAL(2) BATCH TESTSVI test method • reactor and ambient temperatures• MLSS concentration• reactor sludge sample, remix• sludge in 1 or 2 litre cylinder(s), remix• cylinder in shade or sunshine (assess location)• sample temperature• start sludge settling test immediately• 30 minutes settling to obtain settled volume • sample temperature again (probe of thermometer in same
position inside cylinder during all measurements)• calculate SVI
5
![Page 6: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/6.jpg)
EXPERIMENTAL(3) ON-LINE METER
6
• Settler• Settler
![Page 7: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/7.jpg)
EXPERIMENTAL(4) ON-LINE METER
Automated on-line SVI meter– Mobile (220V and water supply) in an enclosure– 2 ℓ Perspex settling cylinder (84.0 mm diameter and
360.9 mm height), removable for cleaning– On-line Tr, Tc, Ta, MLSS concentration – Moving infrared light scanner – 6-line graphic recorder, data storage, retrieval– Automated sample filling, settling, draining, and washing
stages– Sludge sample transfer vacuum based, no mechanical
pumping
7
![Page 8: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/8.jpg)
RESULTS(1) BATCH TEST
Cylinder PlaceMLSS conc. [mg/l]Tr [°C]Ta [°C]
583020.530.1
587020.831.5
Average
1 ℓ ShadeSVI[ml/g] 118 107 113Tc30 [°C ] 25.3 24.4 24.9
1 ℓ SunSVI[ml/g] 89 80 85Tc30 [°C ] 26.2 27.9 27.1
2 ℓ ShadeSVI[ml/g] 130 126 128Tc30 [°C ] 24.3 23.3 23.8
2 ℓ SunSVI[ml/g] 93 82 88Tc30 [°C ] 25.6 26.6 26.1
8
![Page 9: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/9.jpg)
RESULTS(2) BATCH TEST ILLUSTRATION
9
START OF SETTLING TEST 1, 15/10MLSS = 5830 mg/lTr = 20.5°CTa = 30.1°C Tc = 20.6°CSamples in sun or shade - change Tc
END OF SETTLING TEST: Sample handling:1l sun, 1l shade, 2l shade, 2l sunSample temperature Tc30
26.2, 25.3, 25.6, 24.3 4 SVI from one reactor sample:89,118, 130, 93
89 118 130 93
![Page 10: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/10.jpg)
RESULTS(3) BATCH TEST ILLUSTRATION
10
START OF SETTLING TEST 2, 16/10MLSS = 5870 mg/lTr = 20.8°CTa = 31.5°C Tc = about 22°CSamples in sun or shade - change Tc
END OF SETTLING TEST: Sample handling:2l sun, 1l sun, 2l shade, 1l shadeSample temperature Tc30
26.6, 27.9, 23.3, 24.44 SVI from one reactor sample:82, 80, 126, 107
82 80 126 107
![Page 11: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/11.jpg)
RESULTS(4) DIURNAL ON-LINE SVI
11
Graph of 44 on-line 30-minute settling curves, MLSS concentration, temperature and calculated SVI trends over a diurnal period
![Page 12: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/12.jpg)
RESULTS(5) SETTLING CURVES & SVI
12
Graph of 2 on-line 30-minute settling curves, MLSS concentration, temperature and calculated SVI trends
![Page 13: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/13.jpg)
RESULTS(6) SVI vs. MLSS CONC.
13
Data scatter, R2 = 0.47
![Page 14: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/14.jpg)
RESULTS(7) SVI vs. TEMPERATURE
14
Data scatter, R2 = 0.69
![Page 15: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/15.jpg)
RESULTS(8) SVI vs. MLSS CONC. & TEMP.
15
R2 = 0.84
![Page 16: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/16.jpg)
RESULTS(9) BASIC MODEL• Commercial statistical software package • Basic regression model for easy use:
• R2 improvement about 0.3 with one case study• Significant parameters affecting SVI:
– MLSS concentration – Sample temperature
• 8 ml/g SVI change (average) per 1°C on-line sample temperature change with one case study
16
![Page 17: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/17.jpg)
CONCLUSIONS1. Batch settling test: substantial temperature
change– Test cylinder environment has an influence on sample
temperature and SVI
2. On-line settling test: automated diurnal trends– Short time delay between sampling and test reduces
sample temperature variations, improved SVI– Incorporates reactor temperature variations in SVI trend
3. Modelling: correlations for general and design use– Improved SVI correlations with both temperature and
MLSS concentration
17
![Page 18: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/18.jpg)
PROJECT SUMMARY• Include temperature in sludge settling analysis
– reactor, ambient, sample temperatures, or at least stabilised sample and room temperatures
• Use a consistent reference basis of experimental conditions is a basic requirement– impact of cylinder handling and temperature on results
used for plant process control or design or modelling
• Do not extrapolate any results from a case study– develop correlations for each plant or reactor
• On-line automated sludge settling monitoring – benefits relate to automated sampling and testing
methods and on-line data generation18
![Page 19: presentation wisa 2010 15 April 2010 2](https://reader036.fdocuments.us/reader036/viewer/2022062523/5877925f1a28ab0f778b55df/html5/thumbnails/19.jpg)
ACKNOWLEDGEMENTS• ERWAT provided facilities and research resources• ERWAT Research and Development Forum, Board of
Directors and Executive Management provided support
• ERWAT operational personnel assisted during batch settling tests
• Mr G. George made key contributions during the development, construction and upgrading of the on-line SVI meter
• WRC provided initial project finance on a related activated sludge settling project