High Availability (HA) – virtual server environment Fachakademie für Angewandte Informatik Subject: English © Hannes Gastl

Transcript of presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date:...

Page 1: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

High Availability (HA) –

virtual server environment

Fachakademie für Angewandte Informatik

Subject: English

© Hannes Gastl

Page 2: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

agenda

� Why this topic?

� actual situation

� The aims of this project?

� definition HA

� HA cluster models

� options for my company

� cost overview

Hannes Gastl FAAI 2010 - "Virtualisierung" 2

Page 3: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

Why this topic?

� 1 year ago, server infrastructure changed

� server virtualization

� application centralizing

� Hardware is fully redundant

� external audit (FMA, OeNB) comes to the conclusion this is not enough

Hannes Gastl FAAI 10- „High Availability" 3

Page 4: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

actual situation� for the user applications (terminal server):

� 12 virtual citrix servers on 3 esx-hosts

� 3 physical citrix servers

� each server is fully redundant

� “standard” server: (domain controller, gateway, DNS, archive, mail-server…)� 9 virtual servers on 2 esx-hosts

� full redundant (HA on esx)

� 2 SANs (Raid5) for data storage and data backup

� server room with air conditioning, fire control, uninterrupted power supply (USV) and backup data circuit

Hannes Gastl FAAI 10- „High Availability" 4

Page 5: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

actual situation� system crash due to a hardware failure is improbable

� not safety enough for the external audit

� single point of failure:

� server room location for itselfbig fire, vandalism, plane crash, long power cut, …

� -> 20 branches cannot work, headquarter cannot work, no chance to buy / sell stocks

Hannes Gastl FAAI 10- „High Availability" 5

Page 6: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

project aims

� built a second server room

� this server room should manage the work environment if the first server room break down

� 99,99% - 99,999% availability for the server environment

� better performance because of load balancing

Hannes Gastl FAAI 10- „High Availability" 6

Page 7: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

definition high availability� 1 year = 8760 hours

Hannes Gastl FAAI 10- „High Availability" 7

availability min. up time [h] max. down time [h] max. down time [min]

99% 8672,4 87,6 5256

99,9% 8751,24 8,76 525,6

99,99% 8759,124 0,876 52,56

99,999% 8759,91 0,0876 5,3

Page 8: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

HA cluster models� 4 high availability techniques (NetApp)

� Basis:

� 2 server rooms in different locations

� hardware, SAN (diskshelf), switch… on each location

� a controller on each location for synchronizing the data

Hannes Gastl FAAI 10- „High Availability" 8

Page 9: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

SnapMirror (asynchronous)

Hannes Gastl FAAI 10- „High Availability" 9

Page 10: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

Stretched MetroCluster

Hannes Gastl FAAI 10- „High Availability" 10

Page 11: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

Switched MetroCluster

Hannes Gastl FAAI 10- „High Availability" 11

Page 12: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

Fabric MetroCluster

Hannes Gastl FAAI 10- „High Availability" 12

Page 13: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

options for VB TIS5 basic possibilities

� 2nd server room in the headquarter in IBK

� 2nd server room in the 2nd headquarter in SZ

� 2nd server room in the ARZ IBK by renting rack space

� lock server room in headquarter1st server room in ARZ IBK, 2nd server room in ARZ Hall by renting rack space and using HA techniques from ARZ

� lock server room in headquarter 1st server room in ARZ IBK, 2nd server room in ARZ Hall by IaaS (Infrastructure as a Service - using hardware techniques from the ARZ)

Hannes Gastl FAAI 10- „High Availability" 13

Page 14: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

preferred options� 3 offers:

� 1st server room headquarter IBK –2nd server room ARZ IBK by renting rack space

� 1st server room ARZ IBK –2nd server room ARZ Hall by renting rack space

� 1st server room ARZ IBK –2nd server room ARZ Hall by IaaS

Hannes Gastl FAAI 10- „High Availability" 14

Page 15: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

cost overview� (A) HGS IBK <-> ARZ IBK by renting rack space

� initial: € xxx.xxx(NetApp Switched MetroCluster € 230.000,-)

� 4 years p.a.: € xxx.xxx,-

� (B) ARZ IBK <-> ARZ Hall (IaaS)� initial: € xx.xxx

� 4 years p.a.: € xx.xxx,-

� reduction of costs in VB TIS(only B)� initial: € xx.xxx

� 4 years p.a.: € xx.xxx,-

Hannes Gastl FAAI 10- „High Availability" 15

Page 16: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

factor of influence� costs (initial, regularly)

� dependency on other companies

� different involved companies

� more complexity

� the right to say in a matter

� hardware actuality

� time for services

� . . .

Hannes Gastl FAAI 10- „High Availability" 16

Page 17: presentation · Title: Microsoft PowerPoint - presentation.pptx Author: hannes Created Date: 9/8/2012 5:18:48 PM

Any further questions – please ask ☺

Hannes Gastl FAAI 10- „High Availability" 17