Transcript of Presentation Qc Department
-
7/29/2019 Presentation Qc Department
1/33
No. of
Test
Equipt.
Calibration
Planned
Calibration
Achieved
35 35 35
Analysis - Calibration Report of Test Equ
35 35
0
5
10
15
20
25
30
35
40
No. of Test Equipt. Calibration Planne
Analysis - Calibration Report of T
-
7/29/2019 Presentation Qc Department
2/33
pments
35
Calibration Achieved
st Equipments
Series1
-
7/29/2019 Presentation Qc Department
3/33
MonthTotal No. of Times
Received Materials.Jul-12 44
Aug-12 38
Sep-12 85
Oct-12 68
Analysis - Incoming Inspe
4438
2 2
0
10
20
30
40
50
60
70
80
90
Jul-12 Aug-12
-
7/29/2019 Presentation Qc Department
4/33
-
7/29/2019 Presentation Qc Department
5/33
-
7/29/2019 Presentation Qc Department
6/33
Total Rejection
2
2
1
1 1stOct-15th Oct.
ction (PVC + Copper+MB)
85
68
1 1
Sep-12 Oct-12
Analysis - Incoming Inspection (PVC +
Copper+MB) Total No. of Times
Received Materials.
Analysis - Incoming Inspection (PVC +
Copper+MB) Total Rejection
Linear (Analysis - Incoming Inspection
(PVC + Copper+MB) Total Rejection)
-
7/29/2019 Presentation Qc Department
7/33
-
7/29/2019 Presentation Qc Department
8/33
-
7/29/2019 Presentation Qc Department
9/33
-
7/29/2019 Presentation Qc Department
10/33
-
7/29/2019 Presentation Qc Department
11/33
-
7/29/2019 Presentation Qc Department
12/33
-
7/29/2019 Presentation Qc Department
13/33
-
7/29/2019 Presentation Qc Department
14/33
-
7/29/2019 Presentation Qc Department
15/33
Months Total Prd In ''Mtr''
Total Rejection in
Mtrs. ppm
Jul-12 739,798 23Aug-12 646052 1015
Sep-12 657056 556
Oct-12 285650 0
Total 2328556 1594 685
Months Total Prd In ''Mtr''
Total Rejection in
Mtrs. ppmJul-12 84,688 0
Aug-12 89,732 45
Sep-12 156201 25
Oct-12 56,358 5
Total 386979 75 193.8
PVC Cable Production- Inprocess Rejection
Nyvin Cable Production -Inprocess Rejection
-
7/29/2019 Presentation Qc Department
16/33
84,68889,732
156201
56,358
0 45 25 50
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
Jul-12 Aug-12 Sep-12 Oct-12
Total Prd In ''Mtr''
Total Rejection in Mtrs.
739,798
646052 657056
285650
23 1015 556 00
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
Jul-12 Aug-12 Sep-12 Oct-12
Total Prd In ''Mtr''
Total Rejection in Mtrs.
-
7/29/2019 Presentation Qc Department
17/33
Months Total Prd In ''Mtr''
Total Rejection in
Mtrs. ppm
Jul-12 739,798 23Aug-12 646052 0
Sep-12 657056 0
Oct-12 285650 0
Total 2328556 23 10
Months Total Prd In ''Mtr''
Total Rejection in
Mtrs. ppmJul-12 84,688 0
Aug-12 89,732 0
Sep-12 156201 0
Oct-12 56,358 0
Total 386979 0 0
PVC Cable Production- Final Rejection
Nyvin Cable Production - Final Rejection
-
7/29/2019 Presentation Qc Department
18/33
739,798
646052 657056
285650
23 1015 556 00
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
Jul-12 Aug-12 Sep-12 Oct-12
Total Prd In ''Mtr''
Total Rejection in Mtrs.
84,688 89,732
156201
56,358
0 45 25 50
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
Jul-12 Aug-12 Sep-12 Oct-12
Total Prd In ''Mtr''
Total Rejection in Mtrs.
-
7/29/2019 Presentation Qc Department
19/33
Month No.of Breakdowns RectifiedJul-12 0 0
Aug-12 0 0
Sep-12 2 0Oct-12 0 0
No.Of Breakdown / Error Analysis - Tes
0 0
2
00 0 0 00 0
1
00
0.5
1
1.5
2
2.5
Jul-12 Aug-12 Sep-12 Oct-12
-
7/29/2019 Presentation Qc Department
20/33
Un Rectified0
0
10
Equipments
No.Of Breakdown / Error Analysis - Test
Equipments No.of Breakdowns
No.Of Breakdown / Error Analysis - Test
Equipments Rectified
No.Of Breakdown / Error Analysis - Test
Equipments Un Rectified
-
7/29/2019 Presentation Qc Department
21/33
CUSTOMER COMPLAINT REGISTER
PRR.NO. DATE CUSTOMER PART NO. REP. STATUS
CCN-1 1.10.12 HI-COOL
22 AWG BC X 1 CORE
UL-1007 WIRE. BLACK
COLOUR
CCN-2 16.10.12 E.K.ELECTRONICS
0.50 SQMM BC X 1
CORE ROHS & REACH
WIRE
CCN-3 22.10.12 Ramson Engineering
1.00 SQMM BC X 1CORE PVC INS. WIRE
GREY -300 Mtrs. &
2.50 SQ MM BC X 1
CORE GREY 200
MTRS.
CCN-4 6.11.12 BSA
0.50 SQMM BC X 2
CORE (Inner Yellow,
Brown) FLRY B
SHIELDED CABLE
Outer BLACK-500 Mtrs.
CCN-5 6.11.12 BSA
0.75 SQ MM BC X 1
CORE FLRY B WIRE
WHITE COLOUR -1200
Mtrs. ATAMBERNATH
PLANT
-
7/29/2019 Presentation Qc Department
22/33
CUSTOMER COMPLAINT ROOT CAUSE IMMEDIATE ACTION PLAN
NO PRINTING ON 4 N0s OF
COILS & COILING NOT
PROPER PRINTER NOT SET PROPERLY Visited at HI-COOL
0.189,0.188,0.190MM
SIZE BC COPPER FOUND
They required +_ 0.002
mm Tolerance only.
INSTEAD OF 0.20 MM
BC , USED 0.193MM BC
COPPER
On daviation basis this
time customer
accepted the material.
BLACK COPPER ISSUE IN
BOTH SIZE OF WIRES.
Without inspection of QC
Person materials were
dispatched
REPLACEMENT GIVEN
TO CUSTOMER By Mr.
Rajendra on Dtd.
22.10.2012
OUTER SHEATHING OPEN ISSUE
OUTER SHEATH THICKNESS
NOT MAINTAINED PROPERLY.
FRESH LOT PRODUCTION
TAKEN & SENT THE
MATERIAL TO CUSTOMER.
Diameter Variation 1.90 MM TO
2.30 MM
NOT SETTING DIAMETER
PROPERLY ON EXTR. M/C
-
7/29/2019 Presentation Qc Department
23/33
CA/PA ACTION DATE & RESP. CLOSED/OPEN
Instructed to operator for care taking
on printing matter. 1.10.12 OPEN
Before taking the production ,
first approval should be taken
from QA & MD 17.10.12 CLOSED
PROCESS IT IS INSTRUCTED
TO BUNCHING M/C OPERATOR ,
TO SELECT ONLY BRIGHTANNEALED COPPER & ALSO
BEFORE DESPATCH ALL
MATERIALS SHOULD BE
FINALLY CHECKED BY QC
PERSON. 22.10.12 CLOSED
INSTRUCTION GIVEN TO OPERATOR
FOR PROPER MAINTAINING OF OUTER
SHEATH THICKNESS 7.11.12 CLOSED
7.11.12 OPEN
-
7/29/2019 Presentation Qc Department
24/33
DOC. ENCLOSED
-
7/29/2019 Presentation Qc Department
25/33
NC REGISTER QC & PROD.
Sr. No. Date Description of Non-Conformity
2 May-12
3 Jun-12
Emerson export 28core x 1.0sqmm 2nd lay stranding
defect ( core damage) due to wrong selection of Die _
Yogesh reworked -100Mtr
4 Jun-12
On Reliance item FRLS not printed on cable as per
customer requirement, QTY : 3000M-black -Multicore-
cable,1.50sqmm x 3 core BC - Vinod -operator
5 Jun-12
2CORE not printed on multi core 0.75 sqmm BC cable
HIREL-grey cable -1700Mtr, Reworked Kumar -operator
6 Jun-12
Wrong production taken , 50/42swg ATC White -
5000Mtr instead of White/Red.
Anna/Rajendra
7 Jun-12
Bobst items- 22 AWG BC X 11core 1st
lay wrong
stranding -100mtr,
Reworked - Kamlesh
8 Jun-12 ESSEL1.50 sqmm x 4core wrong stranding 50 Mtrs.
Without Drain wire Tape Shielded 200Mtr Reliance-
0.5sqmmx 4Pair Manish-Taping m/c.
Wrong production taken , BSA 16awg Green colour -
10000Mtr. ANNA1 May-12
-
7/29/2019 Presentation Qc Department
26/33
Kamlesh
9 Jun-12
THYSEN 0.75sqmm x 3core Flat cable Wrong outer PVC
sheathed instead of HOFR pvc sheathing pvc used.-
Ambernath Harness .
Vinod.
10 Jul-12 ESSEL-1.50 SQ MM BC X 4 CORE
ROHS CABLE PRINTING MISTAKE.-
VINOD
11 Aug-12 Emerson H.W.
10.00 Sq mm ATC X 1 core FRLS . Red.
Prakash Patil
12 Sept.2012 Quality Automation
1.00 sqmm x 4 core BC .
200 Mtrs.
Sambhajeet / Patil/Anna/Rajendra/Kumar
-
7/29/2019 Presentation Qc Department
27/33
13 Sept. 2012 Quality Automation
1.00 sqmm x 2 core BC .400 Mtrs.
Sambhajeet / Patil/Anna/Rajendra/Kumar
14 Sept. 2012 Quality Automation
1.00 sqmm x 2 core BC .400 Mtrs.
Sambhajeet / Patil/Anna/Rajendra/Kumar
15 Sept. 2012 Harness Dept.
Uninyvin wire Like size-12 & 14 appx.-
25 Mtrs
16 Nov. 2012 KUSHAL UDYOG
0.50 SQMM ATC X 6 CORE BRAIDED CABLE. - 22 MTRS.
-
7/29/2019 Presentation Qc Department
28/33
Reason for Non- Conformity Corrective Action Taken
No availability of cable Continuity on
core to core shorted
Removed & Rectified V The 2nd Lay
Stranding
By over view & wrong setting of
printing matter.
Removed the existing printing and Re-
printed as per requirement
By over view & wrong setting of
printing matter
Removed the existing printing and Re-
printed as per requirement
1. Due to wrong preparation of job
sheet.
White colour is sent to store for other
costomers future requirements and
New production is taken as per the
costomers requirement.
Not carefully study of p.o.
Due to wrong selection of gear.
Removed the cores and Re-stranding
done.
Missing of one core . Only 3 core
stranding instead of 4 CORE
STRANDING.
Removed the cores and Re-stranding
done
Wrong colour Job sheet prepared as
per Customer P.O. mentioned short
description like GR instead of GREY
Green colour cable sent to Store foranother customers future requirements
and New production taken as per
customer colour requirement GR
means GREY colour.
Under training person is on taping
m/c. so this incident happened.Re-worked 200 mtrs
-
7/29/2019 Presentation Qc Department
29/33
Even mentioned in job sheet
for using HOFR PVC . By
over looking mistakehappened by Operator & No
proper communication
between Production Head &
Operator.
Sent to store for costomers
future requirements. And
Taken the new production
By over looking Removed the
This mistake was happened
BY OPERATOR
Existing printing & re-
printing done as per
costomer requirement
Instead of RED Colour ,
BLACK Colour production
taken.
Black colour sent to store for
future requirements of
customers And new
production taken..
Wrong job sheet preparation
Wrong Aluminium Mylar
taping .
Removed the existing tape
.And Re-taping properly.Also removing of outer
sheathing
-
7/29/2019 Presentation Qc Department
30/33
Wrong Aluminium Mylar
Removed the existing tape
.And Re-taping properly.
Taping.
Wrong Aluminium Mylar
taping .
Removed the existing tape
.And Re-taping properly.
Rough surface & Bubbles on
surface of wire Disposal of wire.
Rough surface & Bubbles on
surface of wire Due to
Improper setting of Extruder
M/c Temp.
Removed the Outer sheathing of said
cable & Set the proper Temp. of
Extruder & Start the production.
-
7/29/2019 Presentation Qc Department
31/33
Preventive Action Taken
Method of Disposition / Rectification (If
Applicable)
1) Inform to Marketing dept. While
receiving the Orders from Customers,colour of wire/ cable to be mention clearly
in their P.O.s.
2 ) During preparation of Internal Job
Sheet , production Head to be check
description of Colour completely.
Instructed to stranding m/c operator to
carefully select the Die sizes before running
the items. NC closed: Date : 30.5.2012
Instruction is given to operator regarding
proper selection of printing matter as per the
job sheet.
NC closed: Date : 30.6.2012
Instruction is given to operator regarding
proper selection of printing matter as per the
job sheet
Before preparation of job sheets carefully
study the p.o. and than prepare the job sheet.
NC : Closed: Date : 14.06.2012
Instructed to stranding m/c Operrator for
proper selection of gear. NC : Closed : Date: 08.06.2012
Instructed to stranding m/c Operrator for
proper care should be taking. NC : Closed : Date : 16.06.2012
NC closed: 27.5.2012
Trained person is look out the taping m/c. NC closed:Date: 04.06.12
-
7/29/2019 Presentation Qc Department
32/33
Instructed the Operator to
Carefully study the job sheet
before run the Extr. M/c. NC : Closed : Date : 19.06.2012
Instructed to operator before
running any item,proper care
should be taking while selecting
the printing matter. NC: Closed :Date :22.07.2012
and than run the extruder m/c.
Also check the printing matter in
starting length.
Instructed to Production Head ,
before preparation of job sheets
carefully study the P.O. And than
prepare the job sheet. NC : Closed :Date:30.08.2012
Instructed to taping m/c operator
to follow the carefully time to timechanges & instructions from
production head
NC: Closed :Date:18.09.2012
-
7/29/2019 Presentation Qc Department
33/33
Instructed to taping m/c operator
to follow the carefully time to time
changes & instructions from
production head
NC: Closed :Date :18.09.2012
Instructed to taping m/c operator
to follow the carefully time to time
changes & instructions from
production head NC: Closed :18.09.2012
Instruction given to operator to
check the surface of wire during
the Nylon coating time.
NC: Closed : Date : 22.09.2012
Instructed to OPERRATOR Before start the
production set the proper Temp. of Extruder
M/c.
NC: Closed : Date : 8.11.2012