    35 35 35

    Analysis - Calibration Report of Test Equ

    35 35

    0

    5

    10

    15

    20

    25

    30

    35

    40

    No. of Test Equipt. Calibration Planne

    Analysis - Calibration Report of T

  • 7/29/2019 Presentation Qc Department

    2/33

    pments

    35

    Calibration Achieved

    st Equipments

    Series1

  • 7/29/2019 Presentation Qc Department

    3/33

    MonthTotal No. of Times

    Received Materials.Jul-12 44

    Aug-12 38

    Sep-12 85

    Oct-12 68

    Analysis - Incoming Inspe

    4438

    2 2

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    Jul-12 Aug-12

  • 7/29/2019 Presentation Qc Department

    4/33

  • 7/29/2019 Presentation Qc Department

    5/33

  • 7/29/2019 Presentation Qc Department

    6/33

    Total Rejection

    2

    2

    1

    1 1stOct-15th Oct.

    ction (PVC + Copper+MB)

    85

    68

    1 1

    Sep-12 Oct-12

    Analysis - Incoming Inspection (PVC +

    Copper+MB) Total No. of Times

    Received Materials.

    Analysis - Incoming Inspection (PVC +

    Copper+MB) Total Rejection

    Linear (Analysis - Incoming Inspection

    (PVC + Copper+MB) Total Rejection)

  • 7/29/2019 Presentation Qc Department

    7/33

  • 7/29/2019 Presentation Qc Department

    8/33

  • 7/29/2019 Presentation Qc Department

    9/33

  • 7/29/2019 Presentation Qc Department

    10/33

  • 7/29/2019 Presentation Qc Department

    11/33

  • 7/29/2019 Presentation Qc Department

    12/33

  • 7/29/2019 Presentation Qc Department

    13/33

  • 7/29/2019 Presentation Qc Department

    14/33

  • 7/29/2019 Presentation Qc Department

    15/33

    Months Total Prd In ''Mtr''

    Total Rejection in

    Mtrs. ppm

    Jul-12 739,798 23Aug-12 646052 1015

    Sep-12 657056 556

    Oct-12 285650 0

    Total 2328556 1594 685

    Months Total Prd In ''Mtr''

    Total Rejection in

    Mtrs. ppmJul-12 84,688 0

    Aug-12 89,732 45

    Sep-12 156201 25

    Oct-12 56,358 5

    Total 386979 75 193.8

    PVC Cable Production- Inprocess Rejection

    Nyvin Cable Production -Inprocess Rejection

  • 7/29/2019 Presentation Qc Department

    16/33

    84,68889,732

    156201

    56,358

    0 45 25 50

    20,000

    40,000

    60,000

    80,000

    100,000

    120,000

    140,000

    160,000

    180,000

    Jul-12 Aug-12 Sep-12 Oct-12

    Total Prd In ''Mtr''

    Total Rejection in Mtrs.

    739,798

    646052 657056

    285650

    23 1015 556 00

    100,000

    200,000

    300,000

    400,000

    500,000

    600,000

    700,000

    800,000

    Jul-12 Aug-12 Sep-12 Oct-12

    Total Prd In ''Mtr''

    Total Rejection in Mtrs.

  • 7/29/2019 Presentation Qc Department

    17/33

    Months Total Prd In ''Mtr''

    Total Rejection in

    Mtrs. ppm

    Jul-12 739,798 23Aug-12 646052 0

    Sep-12 657056 0

    Oct-12 285650 0

    Total 2328556 23 10

    Months Total Prd In ''Mtr''

    Total Rejection in

    Mtrs. ppmJul-12 84,688 0

    Aug-12 89,732 0

    Sep-12 156201 0

    Oct-12 56,358 0

    Total 386979 0 0

    PVC Cable Production- Final Rejection

    Nyvin Cable Production - Final Rejection

  • 7/29/2019 Presentation Qc Department

    18/33

    739,798

    646052 657056

    285650

    23 1015 556 00

    100,000

    200,000

    300,000

    400,000

    500,000

    600,000

    700,000

    800,000

    Jul-12 Aug-12 Sep-12 Oct-12

    Total Prd In ''Mtr''

    Total Rejection in Mtrs.

    84,688 89,732

    156201

    56,358

    0 45 25 50

    20,000

    40,000

    60,000

    80,000

    100,000

    120,000

    140,000

    160,000

    180,000

    Jul-12 Aug-12 Sep-12 Oct-12

    Total Prd In ''Mtr''

    Total Rejection in Mtrs.

  • 7/29/2019 Presentation Qc Department

    19/33

    Month No.of Breakdowns RectifiedJul-12 0 0

    Aug-12 0 0

    Sep-12 2 0Oct-12 0 0

    No.Of Breakdown / Error Analysis - Tes

    0 0

    2

    00 0 0 00 0

    1

    00

    0.5

    1

    1.5

    2

    2.5

    Jul-12 Aug-12 Sep-12 Oct-12

  • 7/29/2019 Presentation Qc Department

    20/33

    Un Rectified0

    0

    10

    Equipments

    No.Of Breakdown / Error Analysis - Test

    Equipments No.of Breakdowns

    No.Of Breakdown / Error Analysis - Test

    Equipments Rectified

    No.Of Breakdown / Error Analysis - Test

    Equipments Un Rectified

  • 7/29/2019 Presentation Qc Department

    21/33

    CUSTOMER COMPLAINT REGISTER

    PRR.NO. DATE CUSTOMER PART NO. REP. STATUS

    CCN-1 1.10.12 HI-COOL

    22 AWG BC X 1 CORE

    UL-1007 WIRE. BLACK

    COLOUR

    CCN-2 16.10.12 E.K.ELECTRONICS

    0.50 SQMM BC X 1

    CORE ROHS & REACH

    WIRE

    CCN-3 22.10.12 Ramson Engineering

    1.00 SQMM BC X 1CORE PVC INS. WIRE

    GREY -300 Mtrs. &

    2.50 SQ MM BC X 1

    CORE GREY 200

    MTRS.

    CCN-4 6.11.12 BSA

    0.50 SQMM BC X 2

    CORE (Inner Yellow,

    Brown) FLRY B

    SHIELDED CABLE

    Outer BLACK-500 Mtrs.

    CCN-5 6.11.12 BSA

    0.75 SQ MM BC X 1

    CORE FLRY B WIRE

    WHITE COLOUR -1200

    Mtrs. ATAMBERNATH

    PLANT

  • 7/29/2019 Presentation Qc Department

    22/33

    CUSTOMER COMPLAINT ROOT CAUSE IMMEDIATE ACTION PLAN

    NO PRINTING ON 4 N0s OF

    COILS & COILING NOT

    PROPER PRINTER NOT SET PROPERLY Visited at HI-COOL

    0.189,0.188,0.190MM

    SIZE BC COPPER FOUND

    They required +_ 0.002

    mm Tolerance only.

    INSTEAD OF 0.20 MM

    BC , USED 0.193MM BC

    COPPER

    On daviation basis this

    time customer

    accepted the material.

    BLACK COPPER ISSUE IN

    BOTH SIZE OF WIRES.

    Without inspection of QC

    Person materials were

    dispatched

    REPLACEMENT GIVEN

    TO CUSTOMER By Mr.

    Rajendra on Dtd.

    22.10.2012

    OUTER SHEATHING OPEN ISSUE

    OUTER SHEATH THICKNESS

    NOT MAINTAINED PROPERLY.

    FRESH LOT PRODUCTION

    TAKEN & SENT THE

    MATERIAL TO CUSTOMER.

    Diameter Variation 1.90 MM TO

    2.30 MM

    NOT SETTING DIAMETER

    PROPERLY ON EXTR. M/C

  • 7/29/2019 Presentation Qc Department

    23/33

    CA/PA ACTION DATE & RESP. CLOSED/OPEN

    Instructed to operator for care taking

    on printing matter. 1.10.12 OPEN

    Before taking the production ,

    first approval should be taken

    from QA & MD 17.10.12 CLOSED

    PROCESS IT IS INSTRUCTED

    TO BUNCHING M/C OPERATOR ,

    TO SELECT ONLY BRIGHTANNEALED COPPER & ALSO

    BEFORE DESPATCH ALL

    MATERIALS SHOULD BE

    FINALLY CHECKED BY QC

    PERSON. 22.10.12 CLOSED

    INSTRUCTION GIVEN TO OPERATOR

    FOR PROPER MAINTAINING OF OUTER

    SHEATH THICKNESS 7.11.12 CLOSED

    7.11.12 OPEN

  • 7/29/2019 Presentation Qc Department

    24/33

    DOC. ENCLOSED

  • 7/29/2019 Presentation Qc Department

    25/33

    NC REGISTER QC & PROD.

    Sr. No. Date Description of Non-Conformity

    2 May-12

    3 Jun-12

    Emerson export 28core x 1.0sqmm 2nd lay stranding

    defect ( core damage) due to wrong selection of Die _

    Yogesh reworked -100Mtr

    4 Jun-12

    On Reliance item FRLS not printed on cable as per

    customer requirement, QTY : 3000M-black -Multicore-

    cable,1.50sqmm x 3 core BC - Vinod -operator

    5 Jun-12

    2CORE not printed on multi core 0.75 sqmm BC cable

    HIREL-grey cable -1700Mtr, Reworked Kumar -operator

    6 Jun-12

    Wrong production taken , 50/42swg ATC White -

    5000Mtr instead of White/Red.

    Anna/Rajendra

    7 Jun-12

    Bobst items- 22 AWG BC X 11core 1st

    lay wrong

    stranding -100mtr,

    Reworked - Kamlesh

    8 Jun-12 ESSEL1.50 sqmm x 4core wrong stranding 50 Mtrs.

    Without Drain wire Tape Shielded 200Mtr Reliance-

    0.5sqmmx 4Pair Manish-Taping m/c.

    Wrong production taken , BSA 16awg Green colour -

    10000Mtr. ANNA1 May-12

  • 7/29/2019 Presentation Qc Department

    26/33

    Kamlesh

    9 Jun-12

    THYSEN 0.75sqmm x 3core Flat cable Wrong outer PVC

    sheathed instead of HOFR pvc sheathing pvc used.-

    Ambernath Harness .

    Vinod.

    10 Jul-12 ESSEL-1.50 SQ MM BC X 4 CORE

    ROHS CABLE PRINTING MISTAKE.-

    VINOD

    11 Aug-12 Emerson H.W.

    10.00 Sq mm ATC X 1 core FRLS . Red.

    Prakash Patil

    12 Sept.2012 Quality Automation

    1.00 sqmm x 4 core BC .

    200 Mtrs.

    Sambhajeet / Patil/Anna/Rajendra/Kumar

  • 7/29/2019 Presentation Qc Department

    27/33

    13 Sept. 2012 Quality Automation

    1.00 sqmm x 2 core BC .400 Mtrs.

    Sambhajeet / Patil/Anna/Rajendra/Kumar

    14 Sept. 2012 Quality Automation

    1.00 sqmm x 2 core BC .400 Mtrs.

    Sambhajeet / Patil/Anna/Rajendra/Kumar

    15 Sept. 2012 Harness Dept.

    Uninyvin wire Like size-12 & 14 appx.-

    25 Mtrs

    16 Nov. 2012 KUSHAL UDYOG

    0.50 SQMM ATC X 6 CORE BRAIDED CABLE. - 22 MTRS.

  • 7/29/2019 Presentation Qc Department

    28/33

    Reason for Non- Conformity Corrective Action Taken

    No availability of cable Continuity on

    core to core shorted

    Removed & Rectified V The 2nd Lay

    Stranding

    By over view & wrong setting of

    printing matter.

    Removed the existing printing and Re-

    printed as per requirement

    By over view & wrong setting of

    printing matter

    Removed the existing printing and Re-

    printed as per requirement

    1. Due to wrong preparation of job

    sheet.

    White colour is sent to store for other

    costomers future requirements and

    New production is taken as per the

    costomers requirement.

    Not carefully study of p.o.

    Due to wrong selection of gear.

    Removed the cores and Re-stranding

    done.

    Missing of one core . Only 3 core

    stranding instead of 4 CORE

    STRANDING.

    Removed the cores and Re-stranding

    done

    Wrong colour Job sheet prepared as

    per Customer P.O. mentioned short

    description like GR instead of GREY

    Green colour cable sent to Store foranother customers future requirements

    and New production taken as per

    customer colour requirement GR

    means GREY colour.

    Under training person is on taping

    m/c. so this incident happened.Re-worked 200 mtrs

  • 7/29/2019 Presentation Qc Department

    29/33

    Even mentioned in job sheet

    for using HOFR PVC . By

    over looking mistakehappened by Operator & No

    proper communication

    between Production Head &

    Operator.

    Sent to store for costomers

    future requirements. And

    Taken the new production

    By over looking Removed the

    This mistake was happened

    BY OPERATOR

    Existing printing & re-

    printing done as per

    costomer requirement

    Instead of RED Colour ,

    BLACK Colour production

    taken.

    Black colour sent to store for

    future requirements of

    customers And new

    production taken..

    Wrong job sheet preparation

    Wrong Aluminium Mylar

    taping .

    Removed the existing tape

    .And Re-taping properly.Also removing of outer

    sheathing

  • 7/29/2019 Presentation Qc Department

    30/33

    Wrong Aluminium Mylar

    Removed the existing tape

    .And Re-taping properly.

    Taping.

    Wrong Aluminium Mylar

    taping .

    Removed the existing tape

    .And Re-taping properly.

    Rough surface & Bubbles on

    surface of wire Disposal of wire.

    Rough surface & Bubbles on

    surface of wire Due to

    Improper setting of Extruder

    M/c Temp.

    Removed the Outer sheathing of said

    cable & Set the proper Temp. of

    Extruder & Start the production.

  • 7/29/2019 Presentation Qc Department

    31/33

    Preventive Action Taken

    Method of Disposition / Rectification (If

    Applicable)

    1) Inform to Marketing dept. While

    receiving the Orders from Customers,colour of wire/ cable to be mention clearly

    in their P.O.s.

    2 ) During preparation of Internal Job

    Sheet , production Head to be check

    description of Colour completely.

    Instructed to stranding m/c operator to

    carefully select the Die sizes before running

    the items. NC closed: Date : 30.5.2012

    Instruction is given to operator regarding

    proper selection of printing matter as per the

    job sheet.

    NC closed: Date : 30.6.2012

    Instruction is given to operator regarding

    proper selection of printing matter as per the

    job sheet

    Before preparation of job sheets carefully

    study the p.o. and than prepare the job sheet.

    NC : Closed: Date : 14.06.2012

    Instructed to stranding m/c Operrator for

    proper selection of gear. NC : Closed : Date: 08.06.2012

    Instructed to stranding m/c Operrator for

    proper care should be taking. NC : Closed : Date : 16.06.2012

    NC closed: 27.5.2012

    Trained person is look out the taping m/c. NC closed:Date: 04.06.12

  • 7/29/2019 Presentation Qc Department

    32/33

    Instructed the Operator to

    Carefully study the job sheet

    before run the Extr. M/c. NC : Closed : Date : 19.06.2012

    Instructed to operator before

    running any item,proper care

    should be taking while selecting

    the printing matter. NC: Closed :Date :22.07.2012

    and than run the extruder m/c.

    Also check the printing matter in

    starting length.

    Instructed to Production Head ,

    before preparation of job sheets

    carefully study the P.O. And than

    prepare the job sheet. NC : Closed :Date:30.08.2012

    Instructed to taping m/c operator

    to follow the carefully time to timechanges & instructions from

    production head

    NC: Closed :Date:18.09.2012

  • 7/29/2019 Presentation Qc Department

    33/33

    Instructed to taping m/c operator

    to follow the carefully time to time

    changes & instructions from

    production head

    NC: Closed :Date :18.09.2012

    Instructed to taping m/c operator

    to follow the carefully time to time

    changes & instructions from

    production head NC: Closed :18.09.2012

    Instruction given to operator to

    check the surface of wire during

    the Nylon coating time.

    NC: Closed : Date : 22.09.2012

    Instructed to OPERRATOR Before start the

    production set the proper Temp. of Extruder

    M/c.

    NC: Closed : Date : 8.11.2012