GIS tech 2011 AppGallery award - ArcGIS for iOS app by Grontmij
Presentation of GIR 2015 04 Grontmij
-
Upload
samuel-robin -
Category
Documents
-
view
34 -
download
1
Transcript of Presentation of GIR 2015 04 Grontmij
Ginger Invest Rus
Branch of Grontmij in Russia:
Address: 129085 Moscow, Prospect Mira 101
Contact: +7.495.380.21.15 / +7.909.695.59.40
www.grontmij.fr
G R O U P E I N G E N I E R I E E U R O P E - 2
SUMMARY
I. GINGER INVEST RUS IN RUSSIA
II. MAJOR PROJECTS OF GINGER IN RUSSIA
III. MAJOR PROJECTS OF GINGER INVEST RUS IN RUSSIA
G R O U P E I N G E N I E R I E E U R O P E - 3
GINGER IN RUSSIA
GINGER branch in Russia was created in 2007.
Its field of activities includes :
• Strategic advisory services
• Project feasibility studies and financial plans
• Audits and due diligence services
• Project development services
• Design management and value engineering services
• Project and construction management services
• Maintenance services
Ginger Invest Rus – branch of Grontmij in Russia:
Address: 129085 Moscow, Prospect Mira 101, Office 1107
Contact: +7.495.380.21.15 / +7.909.695.59.40
www.grontmij.fr
G R O U P E I N G E N I E R I E E U R O P E - 4
MAJOR PROJECTS GINGER
Shopping Mall (St Petersburg) : 236 000 m2, 4 HA - 2005
• Marketing studies
• Strategic advise
• Business structuring
• Design management
• Feasibility studies
• Programming
G R O U P E I N G E N I E R I E E U R O P E - 5
MAJOR PROJECTS GINGER
Logistic Parks MLP (Tchernaya Griaz, Podolsk, Saint
Petersburg) - 2006: 1 500 000 m2 • Marketing management
• Strategic advise
• Business structuring
• Feasibility studies
• Design management
• Permitting
•Tendering
G R O U P E I N G E N I E R I E E U R O P E - 6
MAJOR PROJECTS GINGER
Arkhangelskoye Satellite Town (Moscou) - 2006 : 2 500 000 m2,
430 HA
• Strategic studies
• Business plans
• Value Engineering
• Design management
•Project development (specific assignments)
G R O U P E I N G E N I E R I E E U R O P E - 7
MAJOR PROJECTS GINGER
Other major projects :
• MBI Business Park (Moscou) : 680 000 m2, 32 HA
strategic planning
master planning
concept design
business plans
• New Satellite Town (Almaty) : 1 500 000 m2, 350 HA
strategic planning
business plan
• Kailas Group (Almaty) : 281 300 m2, 11,2 HA
strategic planning
business plan
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS GINGER INVEST RUS
8
Decathlon – Sport shop Teplostan – Moscow – 2014/2015:
19.500 m2
• Project management
Design coordination,
Technical customer
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS GINGER INVEST RUS
9
Decathlon – Sport shop NOGINSK – Moscow region –
2014/2015: 4.000 m2
• Project management
Design coordination,
Construction supervision
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS GINGER INVEST RUS
10
Decathlon – Sport shop UFA – 2014/2015: 4.000 m2
• Project management
Construction project management,
Construction supervision
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS GINGER INVEST RUS
11
Decathlon – Sport shop ROSTOV - 2014: 3.000 m2
• Project management
Obtaining of all technical conditions,
approvals, initial permissive documentation,
positive conclusions of expertise
building permit
G R O U P E I N G E N I E R I E E U R O P E - 12
MAJOR PROJECTS - GINGER INVEST RUS
FM Logistic warehouse – Gatchina Saint Petersburg
(Leningradski region) – 2013/2014: 165.500 m2
• Project management
Design stage P
Obtaining of all technical conditions, approvals, initial permissive
documentation, positive conclusions of expertise and building permit
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS - GINGER INVEST RUS
13
FM Logistic warehouse – Noginsk (Moscow region) –
2012/2013: 74.500 m2
• Project management
Design stage P
Obtaining of all technical conditions, approvals, initial permissive
documentation, positive conclusions of expertise and building permit
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECT - GINGER INVEST RUS
SPF-DIANA – Pets food
factory – Belgorod - 2013
3.000m2
• Due diligence
• Assistance during land search
• Design Management
• Permitting and Technical
conditions
• Construction project
Management
• Technadzor
14
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS GINGER INVEST RUS
15
Decathlon – Sport shop ROSTOV - 2013: 6.000 m2
• Project management
Obtaining of all technical conditions,
approvals, initial permissive documentation,
positive conclusions of expertise
building permit
G R O U P E I N G E N I E R I E E U R O P E - 16
MAJOR PROJECTS GINGER INVEST RUS
Decathlon – Warehouse – Domodedovo Moscow region -
2013: 30.000 m2
• Construction supervision
Control of quality of works and its conformity with design and
contruction norms.
Invoicing control
Punch listing
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS - GINGER INVEST RUS
17
Rostov Orbitalnaya– Construction of Fire depot - 2014
•Coordination of design
•Obtaining of building permit and exploitation permit
•Tender organization
•Project Management during construction and Technadzor
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS - GINGER INVEST RUS
18
GEFCO Automotive Park (PSA) – (Moscow Region) - 2012 : 38ha
•Feasability study
•Land search
•Investor search
•Design management
•Permitting
•Tendering
•Construction man.
•Technadzor
G R O U P E I N G E N I E R I E E U R O P E - 19
MAJOR PROJECTS - GINGER INVEST RUS MAJOR PROJECTS - GINGER INVEST RUS
DECATHLON – 2012-2015: Due diligence of 18 land plots
• Technical audit of land plots before purchase or lease
Analysis of town planning issues, technical conditions, potential limitations,
access, potential point of connection for utilities
Analysis of topographical, ecological, geological surveys
Risk analysis
Scheduling of design and construction phases
Cost forecasting
Due diligences performed in the following cities:
Oulianovsk, Krasnodar, Stavropol, Noginsk, Krasnogorsk, Omsk, Saint
Petersburg, Khimki, Naberjnie Tchelnie, Vidnoe, Moscow, Novokuznets,
Tiumen, Krasnoyarsk, Saratov, Pitigorsk
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS – GINGER INVEST RUS
20
AUCHAN Mitishi – Reconstruction- 3.000m2 additional
office- Centrale d’achat - 2012
•Design and permitting (Expertise)
•Tender organization
•Project Management for office reconstruction and Technadzor
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS GINGER INVEST RUS
21
Rusfinance Bank Offices (BSGV) – Citydel (Moscow) - 2008 :
6.500 m2
• Project management
for fit-out design and
construction works
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS - GINGER INVEST RUS
22
GEFCO Offices (Peugeot Citroen) – Roumiantsevo BP
(Moscow Region) - 2008 : 3.000 m2
• Project management for fit-out works
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS – GINGER INVEST RUS
23
PSA PEUGEOT CITROEN – Factory - Kaluga - 200ha -
2007
•Earthworks technical supervision (2,5million m3)
•Coordination with the Administration during Investment Phase
•Consultancy during Design Phase and Construction Tender phase
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS - GINGER INVEST RUS
24
Posolski Dom - Cultural / Recreation Center – Tula -
25.000m2 - 2008
•Feasability study
•Design Management
G R O U P E I N G E N I E R I E E U R O P E -
MAJOR PROJECTS - GINGER INVEST RUS
25
GEFCO SA – Office fit-out - Podolsk - 500m2 - 2008
•Project Management for office reconstruction
G R O U P E I N G E N I E R I E E U R O P E -
OUR CLIENTS
26
G R O U P E I N G E N I E R I E E U R O P E - 27
PROJECTS TURN-KEY MANAGEMENT
« From land to maintenance »
• Land acquisition issues
• Market and risks analysis
• Business structuring and Financing
• Feasibility studies
• Programming
• Design management
• Permitting
• Tendering services
• Construction management
• Maintenance