Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)

District Irrigation Plan (2016-2020)GIR SOMNATH, GUJARAT

GIR SOMNATH

Page 2: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)

District Irrigation Plan (2016-2020)GIR SOMNATH, GUJARAT

GIR SOMNATH

Page 3: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

1 | P a g e

CONTENTS

EXECUTIVE SUMMARY ...................................................................................................................... 3

INTRODUCTION ................................................................................................................................... 6

Background ............................................................................................................................................. 6

Vision ..................................................................................................................................................... 11

Objective ................................................................................................................................................ 11

Strategy/approach................................................................................................................................ 12

Programme Components .................................................................................................................... 12

Rationale/ Justification ....................................................................................................................... 14

Methodology ......................................................................................................................................... 15

Chapter 1. General Information of the District ................................................................. 17

1.1 District Profile ................................................................................................................................. 17

1.2 Demography .................................................................................................................................... 19

1.3 Biomass and Livestock .................................................................................................................. 21

1.4 Climate and Rainfall ...................................................................................................................... 23

1.5 Soil Profile ...................................................................................................................................... 23

1.6 Land Use Pattern ............................................................................................................................ 24

Chapter 2. District Water Profile ............................................................................................ 26

2.1 Area Wise, Crop Wise Irrigation Status ...................................................................................... 26

2.2 Production and Productivity of Major Crops ............................................................................. 28

2.3 Irrigation Based Classification ..................................................................................................... 36

Chapter 3. Water Availability ................................................................................................... 38

3.1 Status of Water Availability .......................................................................................................... 38

3.2 Status of Ground Water Availability ........................................................................................... 39

3.3 Status of Command Area ............................................................................................................. 43

3.4 Existing types of Irrigation ................................................................................................................ 43

Chapter 4. Water Requirement /Demand ........................................................................... 44

4.1 Domestic Water Demand .............................................................................................................. 45

4.2 Crop Water Requirement ............................................................................................................. 46

4.3 Livestock ......................................................................................................................................... 46

4.4 Industrial Water Requirement. ................................................................................................... 47

Page 4: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

2 | P a g e

4.5 Water Demand for Power Generation ........................................................................................ 48

4.6 Total Water Demand of the district for various sectors ........................................................... 48

4.7 Water Budget .................................................................................................................................. 49

Chapter 5. Strategic Action Plan for Irrigation in District under PMKSY ............. 51

5.1 Strategic Plan for irrigation in PMKSY ....................................................................................... 51

5.2 Component wise Strategic Action Plan ....................................................................................... 55

5.3 Year wise Strategic Action Plan ................................................................................................... 55

5.4 Monitoring and Evaluation .......................................................................................................... 56

5.5 Suggestions ..................................................................................................................................... 57

Annexure ................................................................................................................................................ 60

Annexure-1- Department wise Summary of Strategic Action Plan ............................................... 60

Annexure-2 Strategic Action Plan of Water Resource Department .............................................. 62

Annexure-3 – Strategic Action Plan of GWRDC .............................................................................. 65

Annexure-4 – Strategic Action Plan of GLDC .................................................................................. 66

Annexure-5 – Strategic Action Plan of GGRC .................................................................................. 67

Annexure-6 Strategic Action Plan of GSWMA ................................................................................. 69

List of tables:

Table 1: District Profile ....................................................................................................................................................... 18 Table 2: Population of Girsomnath as per Census 2011 ..................................................................................................... 19 Table 3: Sex ratio by Sub-district, 2011 .............................................................................................................................. 20 Table 4: Demographic profile of Girsomnath .................................................................................................................... 20 Table 5: Biomass and livestock in Girsomnath district ...................................................................................................... 21 Table 6: Block Wise No of Livestock in Girsomnath District as per 2012 Livestock Census ........................................... 22 Table 7: Block Wise No of Livestock in Girsomnath District as per 2012 Livestock Census ........................................... 22 Table 8: Agro ecology of Girsomnath ................................................................................................................................. 23 Table 9: Block wise Soil Classification ............................................................................................................................... 23 Table 10: Blockwise land use pattern ................................................................................................................................. 24 Table 11: Block wise Area under Various Crops ................................................................................................................. 26 Table 12: Area with horticulture crops ............................................................................................................................... 28 Table 13: Block wise Area under Various Crops ................................................................................................................ 28 Table 14: Block wise Irrigation based Classification.......................................................................................................... 36 Table 15: Status of water availability in Girsomnath ......................................................................................................... 38 Table 16: Ground Water Status of Girsomnath ................................................................................................................. 42 Table 17: Status of Command ............................................................................................................................................. 43 Table 18: Block wise Area under various irrigation infrastructure ................................................................................... 43 Table 19: Domestic Water Demand (MCM) ....................................................................................................................... 45 Table 20: Crop wise Water Requirement ........................................................................................................................... 46 Table 21: Livestock Water Demand .................................................................................................................................... 47 Table 22: Water Demand for Industries ............................................................................................................................ 48 Table 23: Total Water Demand of the district for Various sectors ................................................................................... 48 Table 24: Water Budget ...................................................................................................................................................... 50 Table 25: Department wise Planned Coverage of Area under PMKSY .............................................................................. 51 Table 26: Component wise Financial Outlay for PMKSY .................................................................................................. 55 Table 27: Total amount to be spent by various agencies under PMKSY for four years ................................................... 55

Page 5: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

3 | P a g e

EXECUTIVE SUMMARY

Water is of vital importance for human & animal life, for maintaining ecological balance

and for developmental efforts. With the ever-increasing demand for water due to

population growth, urbanization and industrialization, making water available to

multiple uses, planning and management of water resources and utilization of water

economically, optimally and equitably assumes greater significance. Government of

India formulated PMKSY with the vision of extending the coverage of irrigation (Har

Khet Ko Pani) and improving water use efficiency (More Crop Per Drop) in a focused

manner with end to end solution on water resource creation, distribution, management,

field application and extension activities. Under PMKSY, an integrated planning and

management of water resources, through estimation of water budget for each of the

district and sub districts and preparation of strategic action plan to address the water

gap through District Irrigation Plan (DIP) is envisaged. The present report presents the

District Irrigation Plan under PMSY in Girsomnath District.

Further, Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) incentivizes states to

enhance expenditures on irrigation and water resources management by making the

access to PMKSY funds to states on certain conditions. This means the states will have

access only if the expenditure in water resource development for agriculture sector in

the year under consideration is not less than the baseline expenditure, which is defined

as the average of the expenditure in irrigation sector irrespective of the department in

the state plan in three years prior to the year under consideration.

PMKSY will be implemented in area development mode only by adopting a

„decentralized State level planning and projective execution‟ structure that will allow

States to draw up their own irrigation development plans based on DIPs and SIPs with a

horizon of 5-7 years. A three-tier structure at national, state and district level will

oversee implementation and coordination of the program. The District Level

Implementation Committee will form the third tier of the PMKSY. The DLIC will be

chair by the Deputy Commissioner, Girsomnath and is comprised of the Departments of

Agriculture, Horticulture, District Rural Development Agency (DRDA), Irrigation and

Public Health Department, Forest Department, Lead bank of the District and any other

line Departments in the District. The DLIC will oversee the implementation and inter-

departmental coordination at district level.

District Water Profile: Girsomnath district is a predominantly rural district where

households were dependent on agriculture and allied activities for their livelihood.

Watering of crops is the main purpose of irrigation infrastructure created in the district.

Out of gross cropped area of 2,27,800 ha (exclusive of horticulture crops) in the district,

only kharif cereals have a share of 1,28,000 ha (or 56.19%).Groundnutis themajor crops

cultivated in kharif. In rabi season, 78.39 per cent area, i.e. 63,500 ha was covered

under wheat. Groundnutwas the major crops cultivated in summer season with area

Page 6: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

4 | P a g e

share of 45.81 per cent. A total of 56,205 ha area out of 2,27,800 ha is rainfed in the

district. A single Bajra occupies most of the rainfed area..

The district reports to have a total area of 98017.80 ha under horticulture crops during

2014-15.

Area under Irrigation: The Gross Irrigated Area of Girsomnath district is

1,36,031hectare. Among the blocks, Kodinar blockis 100 percent irrigated. Vanthali

block has largest unirrigated area of 19,280 ha, followed by Veraval (18421 ha) and Una

(18,390 ha.)

Availability of Water Sources: Both surface and groundwater facilities are available

in the Girsomnath district. Major source of Surface water in the district is canal.The

availability of surface water is across all the six blocks of the district. The total

availability of Surface water in the district is 210.89 MCM. Girgadhada block has the

largest surface water availability of 46.15 MCM, followed by Talala (41.79) and Kodinar

(41.70).

As per Central Ground Water Board notification, the status ground water in all six

blocks of the district is safe

Existing Type of Irrigation: The district has 5,048 ha area under developed canal

command. It is having total 3 ponds, which are limited to Talala and Kodinar block.

Open wells and tubewells (36,651) irrigate 86,322 ha in the district.

Demand for Water Sources: The present water demand of the district has assessed

to be 1385.03 MCM annually. Out of the total water demand 1308.47 mcm (94.47%) is

the requirement from crop production. Nearly 53.24 mcm (or 3.84%) is required for

domestic drinking water requirement and another 11.53 mcm (or 0.83%) is required for

livestock water requirement purpose. Water demand for power generation and

industrial sector is negligible.

Planned Coverage of Area under PMKSY:

Out of the total area planned to cover under PMKSY, Water Resource Department is to

bring an additional area of 77,207.40 ha under irrigation by various activities such as

lining work, canal gates, watercourse, deepening of ponds and construction of water

harvesting structures. Gujarat Water Resource Development Corporation Ltd. Gujarat

Water Resource Development Corporation Ltd. (GWRDC) will bring 100 ha new area

under irrigation through new tube wells with drip irrigation system across six blocks of

the district. As per the plan Gujarat Land Development Corporation (GLDC), is to

irrigate a total area of 2134 ha in the district.

Gujarat Green Revolution Company Ltd. (GGRC) is implementing all the micro

irrigation schemes of the state,is expected to cover a total area of 28,807.80 ha under

Page 7: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

5 | P a g e

drip and sprinkler irrigation. Gujarat State Watershed Management Agency (GSWMA)

will cover a total area of 4,766.50 ha under various component of watershed.

Component wise Financial Outlay:

Figures in Rupees Lakh

Agency 2016-17 2017-18 2018-19 2019-20 Total

GGRC 3545.57 2659.18 2659.18 2659.18 11523.12

PMKSY Watershed 2463.45 385.87 0.00 0.00 2849.32

GWRDC 50.00 50.00 50.00 50.00 200.00

ATMA 17.64 28.20 33.96 42.12 121.92

WRD 957.00 11726.50 14217.00 43589.50 70490.00

GLDC 397.20 397.20 397.20 397.20 1588.80

Total 7430.86 15246.95 17357.34 46738.00 86773.16

Department wise Financial Outlay:

Figures in Rupees Lakh

Component 2016-17 2017-18 2018-19 2019-20 Total

Per drop more crop 3545.57 2659.18 2659.18 2659.18 11523.12

PMKSY Watershed 2463.45 385.87 2849.32

Har Khet Ko Pani 1404.20 12173.70 14664.20 14036.70 42278.80

Training and Capacity Building

17.64 28.20 33.96 42.12 121.92

AIBP 0.00 0.00 0.00 30000.00 30000.00

Total 7430.86 15246.95 17357.34 46738.00 86773.16

Expected Output and Outcome: At present, a total of 1,12,669.70 ha of area under

crops is unirrigated in the district. Out of which, under PMKSY is proposed to cover an

additional area of 83,861.90 ha under irrigation during the upcoming four years. This

will save not only significant amount of water but also significantly larger area can be

irrigated with limited quantity of water.

Page 8: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

6 | P a g e

INTRODUCTION

Background

Preparation of decentralized area specific district planning process visualized in various

plans took concrete shape through the years and initiatives like specific guidelines on

methodologies and processes for preparation of district plans. Framework for

preparation of perspective plan, medium term and annual term by the planning

commission in 1969 and the 73rd and 74th constitutional amendments conferring

constitutional status to Panchayats at district and sub district level; local self-

government in urban areas; constitution of district planning committee to consolidate

the plans prepared at Panchayats and municipalities and prepare a draft development

plan for the whole district.

The decentralized planning process was further strengthened through emphasis by

planning commission on preparation of district level plans and making it an integral

part of the process of preparation of the states 11th five year plan. The Planning

commission issued guidelines in August 2006 for preparation of the district plans. The

guidelines define the District Planning as „the process of preparing an integrated plan

for the local government sector in a district taking into account the resources (natural,

human and financial) available and covering the sectoral activities and schemes

assigned to the district level and below and those implemented through local

governments in a state. The document that embodies this statement of resources and

their allocation for various purposes is known as the District Plan”.

Government of India through a resolution in National Development Council on 29th May

2007 conceived a special Additional Central Assistance Scheme (ACAS) to address the

slow growth of agriculture and allied sectors by incentivizing states to draw up plans for

their agriculture sectors more comprehensively. The NDC resolution states "GoI

introduced a new Additional Central Assistance Scheme to incentivize states to draw up

plans for their agriculture sector more comprehensively, taking agro-climatic

conditions, natural resource issues and technology into account, and integrating

livestock, poultry and fisheries, etc. This involved a new scheme for Additional Central

Assistance (ACA) to State Plans, administered by the Union Ministry of Agriculture over

and above its existing Centrally Sponsored Schemes, to supplement the State-specific

strategies including special schemes for beneficiaries of land reforms. The newly created

National Rain fed Area Authority on requestwas to assist States in planning for rain fed

areas".

The NDC in its resolution advised the states to prepare a comprehensive district

agriculture plans (C-DAP) that will fully utilize available resources and include allied

agriculture sectors. Further, GOI issued a manual on preparation of comprehensive

Page 9: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

7 | P a g e

district agriculture plans to help the states prepare C-DAP. As per these guidelines, the

objective of district planning is „to design an integrated and participatory action plan for

the development of local area in general and agriculture and allied sectors in particular‟.

The objectives of Comprehensive District Agriculture Plan (C-DAP) were:

To prepare a Comprehensive District Agriculture Plan (C-DAP) through

participatory process involving various organizations and stakeholders.

To enable optimum utilization of scarce natural, physical & financial resources.

To assess and plan for the infrastructure required to support the agriculture

development.

To establish linkages with the required institutional support services, like

credit, technology transfer, ICT, research etc.

To evolve an action plan for achieving sustainable agricultural growth with food

security and cropping system that will improve farmers‟ income.

The guidelines required the state/district authorities to: (i) ensure that the agricultural

plans prepared for the district and then integrated into the agricultural plans of the

State based on the agro-climatic conditions, availability of technology, trained

manpower and natural resources; (ii) local needs / crops / feed and fodder / animal

husbandry / dairying / fisheries / priorities are reflected in the plan; (iii) productivity

gaps for important crops and livestock and fisheries are reduced; and (iv) the returns to

the farmers from these are maximized.

The latest move in the process of strengthening of decentralized planning process was

the Government of India guidelines issued in 2015 in the form of a template for the

preparation of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of

the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) program and made the

preparation of DIP and SIP mandatory for the states to receive funds from the program.

The present report is a product of these long drawn efforts of Government of India to

strengthen the decentralized planning process in the country focusing on the vital

resource i.e., water.

Water is of vital importance for human & animal life, maintenance of ecological balance

and promotion of developmental activities. Considering its vital importance and ever

increasing demand for water, in the face of population growth, urbanization &

industrialization and considerations of climatic change, making water, an increasingly a

scarce resource, available to multiple uses, planning and management of this vital

resources, utilization of water economically, optimally and equitably assumes greater

importance.

Page 10: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

8 | P a g e

According to the 12th Five year Plan the water budget estimates of India by Ministry of

Water Resources suggests an availability of 1123 billion cubic meters (BCM) against a

current estimated demand of 710 BCM. The Standing Committee of the Ministry of

Water Resources estimates that this water demand will rise to 1093 BCM by 2025.

Though the existing water availability in the immediate future seems to be adequate,

with the near constant supply of water resources in the face of increasing demand on

account of population growth, urbanization and industrialization will strain the water

supply-demand balance.

The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced

to 1820 cubic meters in 2001 while the international prescribed limit is 1800 cubic

meters. The projected per capita availability of water is 1341 cubic meters in 2025 and

1140 cubic meters in 2050 suggesting shortage of water in the medium term1. Further,

the all India water balance estimates does not reflect the variations in water balance

across time and space- certain areas having a positive water balance and the others

facing acute shortage. The problem is further accentuated by water quality related

issues.

With the abundant surface and ground water supply in the first five decades since

independence, more than 80 percent of the total available water resources were

allocated for irrigation purposes and the rest meeting the domestic and industrial

demands. In a recent study2on the demand for water from agriculture, domestic and

industrial uses in 2000, 2025 and 2050 seems to suggest that domestic demand (34

BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42 BCM

in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the total balance

water available while agriculture demand for water will be (605 BCM in 2000, 675 BCM

in 2025 and 637 BCM in 2050). This change is partly because of the changing sectoral

contributions of India‟s GDP and also partly because of dynamics of irrigation

development in the country where the initial expansion in area under irrigation is

propelled by the availability of abundant water resources and availability of good quality

land. This is no longer the case in many of the states where the availability of land and

water are serious constraints for further expansion of irrigation. Further, as per the

erstwhile planning commission up to March 2012 out of 141 million hectares of net sown

area in the country 114 (or 81%) million hectares is Irrigation Potential Created (IPC)

and 88 (or 62%) million hectares is Irrigation Potential Utilized (IPU) leaving almost

20% of irrigated potential unutilized. This leaves 40 percent of the net sown area in the

country dependent on rainfall which makes farming a high risk and less productive.

1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India, New

Delhi. 2Amarasinghe, U.A., Shah T., Turral, H. and Girsomnath, B.K. 2007. India’s water future to 2025-

2050:Business-as-usual scenario and deviations. Research Report 123, International Water Management

Institute, Colombo.

Page 11: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

9 | P a g e

The competing demands for water resources and the emerging issues and concerns were

to be addressed through certain basic principles and commonality in approaches in

dealing with planning, development and management of water resources3 under an

Integrated Water Resource Management framework. The main objectives of water

resource management as delineated in National Water Policy 2012 are:

a) Planning, development and management of water resources need to be governed

by common integrated perspective considering local, regional, State and national

context, having an environmentally sound basis, keeping in view the human,

social and economic needs.

b) Principle of equity and social justice must inform use and allocation of water.

c) Good governance through transparent informed decision making is crucial to the

objectives of equity, social justice and sustainability. Meaningful intensive

participation, transparency and accountability should guide decision making and

regulation of water resources.

d) Water needs to be managed as a common pool community resource held, by the

state, under public trust doctrine to achieve food security, support livelihood, and

ensure equitable and sustainable development for all.

e) Water is essential for sustenance of eco-system, and therefore, minimum

ecological needs should be given due consideration.

f) Safe Water for drinking and sanitation should be considered as pre-emptive

needs, followed by high priority allocation for other basic domestic needs

(including needs of animals), achieving food security, supporting sustenance

agriculture and minimum eco-system needs. Available water, after meeting the

above needs, should be allocated in a manner to promote its conservation and

efficient use.

g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff,

river, lakes, soil moisture, and ground water, sea, etc., are interdependent and the

basic hydrological unit is the river basin, which should be considered as the basic

hydrological unit for planning.

h) Given the limits on enhancing the availability of utilizable water resources and

increased variability in supplies due to climate change, meeting the future needs

will depend more on demand management, and hence, this needs to be given

priority, especially through (a) evolving an agricultural system which economizes

on water use and maximizes value from water, and (b) bringing in maximum

efficiency in use of water and avoiding wastages.

i) Water quality and quantity are interlinked and need to be managed in an

integrated manner, consistent with broader environmental management

approaches inter-alia including the use of economic incentives and penalties to

reduce pollution and wastage.

3Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.

Page 12: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

10 | P a g e

j) The impact of climate change on water resources availability must be factored

into water management related decisions. Water using activities need to be

regulated keeping in mind the local geo climatic and hydrological situation.

Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to

address the constraints in providing assured irrigation as well as increasing efficiency

and productivity of current water use to bring more prosperity to the rural areas.

Priorities of Government of India were reflected in the Hon‟ble President‟s address to

the joint Session of the Parliament of 16th Lok Sabha where he indicated that “Each

drop of water is precious. Government is committed to giving high

priority to water security. It will complete the long pending irrigation

projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee

Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously

considering all options including linking of rivers, where feasible; for

ensuring optimal use of our water resources to prevent the recurrence of

floods and drought. By harnessing rain water through ‘Jal Sanchay’ and

‘Jal Sinchan’, we will nurture water conservation and ground water

recharge. Micro irrigation will be popularised to ensure ‘Per drop-More

crop”.

PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of

five years from 2015-16 to 2019-20. The programme is an amalgamation of on-going

schemes of Ministry of Water Resources, River Development and Ganga Rejuvenation,

Ministry of Agriculture & Cooperation and Ministry of Rural Development. The existing

schemes AIBP, CADWM, MI, SWMA,Watershed& Convergence with MGNREGA were

brought together under the umbrella program of PMKSY. Further the scheme seeks

convergence with scheme likeMahatma Gandhi National Rural Employment Guarantee

Scheme (MGNRES), Rashtriya Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National

Solar Mission and Rural Electrification programmes (JLNNSM&REP), Rural

Infrastructure Development Fund (RIDF), Members of Parliament Local Area

Development Scheme (MPLAD), Members of Legislative Assembly Local Area

Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest

Department (WPSFD) etc. The PMKSY will be implemented in an area development

mode only by adopting a decentralized state level planning and projectised execution

structure that will allow the state to draw up their own irrigation development plans

based on DIPs and SIPs with a horizon of 5-7 years. The program will be implemented

as part of Rashtriya Krishi Vikas Yojana (RKVY) with state agriculture department

acting as the State Nodal Agency. However, the implementing departments for the four

components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop) and

PMKSY (watershed development) will be decided by the respective program

ministry/department.

Page 13: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

11 | P a g e

The funds under this program would be provided to the states as per the pattern of

assistance of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance

and NITI Aayog. During 2015-16 the existing pattern of assistance of ongoing scheme

was continued. An outlay of Rs. 50,000 crore has been approved for 2015-20. The

financial assistance provided to the state governments from this centrally sponsored

scheme is subject to fulfillment of certain conditions. Firstly, a state will become eligible

to access PMKSY fund only if it has prepared the District Irrigation Plans (DIP) and

State Irrigation Plan (SIP), excepting for the initial year, and the expenditure in water

resource development for agriculture sector in the year under consideration is not less

than the baseline expenditure, which is defined as the average of the expenditure in

irrigation sector irrespective of the department in the state plan in three years prior to

the year under consideration. Secondly, States will be given additional weightage for

levying charges on water and electricity for irrigation purposes, so as to ensure

sustainability of the programme. Thirdly, interstate allocation of PMKSY fund will be

decided based on

Share of percentage of unirrigated area in the state vis-à-vis national average

including prominence of areas classified under Desert Development Programme

(DDP) and Drought Prone Area Development Programme (DPAP)

Increase in percentage share of expenditure on water resource development for

agriculture sector in State Plan expenditure in the previous year over three years

prior to it and,

Improvement in irrigation efficiency in the state.

Vision

The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to

ensure access to some means of protective irrigation to all agricultural farms in the

country, to produce „per drop more crop‟, thus bringing much desired rural prosperity.

Objective

The objectives of the PMKSY are to:

a) Achieve convergence of investments in irrigation at the field level (preparation of

district level and, if required, sub district level water use plans).

b) Enhance the physical access of water on the farm and expand cultivable area

under assured irrigation (Har Khet Ko Pani),

c) Integration of water source, distribution and its efficient use, to make best use of

water through appropriate technologies and practices.

d) Improve on-farm water use efficiency to reduce wastage and increase availability

both in duration and extent,

Page 14: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

12 | P a g e

e) Enhance the adoption of precision-irrigation and other water saving technologies

(More crop per drop).

f) Enhance recharge of aquifers and introduce sustainable water conservation

practices

g) Ensure the integrated development of rainfed areas using the watershed

approach towards soil and water conservation, regeneration of ground water,

arresting runoff, providing livelihood options and other NRM activities.

h) Promote extension activities relating to water harvesting, water management and

crop alignment for farmers and grass root level field functionaries.

i) Explore the feasibility of reusing treated municipal waste water for peri-urban

agriculture, and

j) Attract greater private investments in irrigation.

Strategy/approach

To achieve these objectives PMKSY adopted strategies that include:

a) Creation of new water sources; repair, restoration and renovation of defunct

water sources; construction of water harvesting structures, secondary & micro

storage, groundwater development, enhancing potentials of traditional water

bodies at village level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo

(Nagaland); Eri, Ooranis (T.N.); Dongs (Assam); Katas, Bandhas (Odisha and

M.P.) etc.

b) Developing/augmenting distribution network where irrigation sources (both

assured and protective) are available or created;

c) Promotion of scientific moisture conservation and run off control measures to

improve ground water recharge so as to create opportunities for farmers to access

recharged water through shallow tube/dug wells;

d) Promoting efficient water conveyance and field application devices within the

farm viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and

other application devices etc.;

e) Encouraging community irrigation through registered user groups/farmer

producers‟ organisations/ NGOs; and

f) Farmer oriented activities like capacity building, training and exposure visits,

demonstrations, farm schools, skill development in efficient water and crop

management practices (crop alignment) including large scale awareness on more

crop per drop of water through mass media campaign, exhibitions, field days, and

extension activities through short animation films etc.

Programme Components

PMKSY has following four components:

Page 15: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

13 | P a g e

1. Accelerated Irrigation Benefit Programme (AIBP)

To focus on faster completion of ongoing Major and Medium Irrigation including

National Projects.

2. PMKSY (Har Khet ko Pani)

This component focuses on-

a) Creation of new water sources through Minor Irrigation (both surface and ground

water)

b) Repair, restoration and renovation of water bodies; strengthening carrying

capacity of traditional water sources, construction rain water harvesting

structures (Jal Sanchay);

c) Command area development, strengthening and creation of distribution network

from source to the farm;

d) Ground water development in the areas where it is abundant, so that sink is

created to store runoff/ flood water during peak rainy season.

e) Improvement in water management and distribution system for water bodies to

take advantage of the available source which is not tapped to its fullest capacity

(deriving benefits from low hanging fruits). At least 10% of the command area to

be covered under micro/precision irrigation.

f) Diversion of water from source of different location where it is plenty to nearby

water scarce areas, lift irrigation from water bodies/rivers at lower elevation to

supplement requirements beyond IWMP and MGNREGS irrespective of

irrigation command.

g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc.

at feasible locations.

3. PMKSY (Per Drop More Crop)

a) Programme management, preparation of State/District Irrigation Plan, approval

of annual action plan, Monitoring etc.

b) Promoting efficient water conveyance and precision water application devices

like drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);

c) Topping up of input cost particularly under civil construction beyond permissible

limit (40%), under MGNREGS for activities like lining inlet, outlet, silt traps,

distribution system etc.

d) Construction of micro irrigation structures to supplement source creation

activities including tube wells and dug wells (in areas where ground water is

available and not under semi critical/ critical/ over exploited category of

development) which are not supported under AIBP, PMKSY (Har Khet Ko Pani),

PMKSY (Watershed) and MGNREGS as per block/district irrigation plan.

Page 16: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

14 | P a g e

e) Secondary storage structures at tail end of canal system to store water when

available in abundance (rainy season) or from perennial sources like streams for

use during dry periods through effective on-farm water management;

f) Water lifting devices like diesel/ electric/ solar pumpsets including water carriage

pipes, underground piping system.

g) Extension activities for promotion of scientific moisture conservation and

agronomic measures including cropping alignment to maximise use of available

water including rainfall and minimise irrigation requirement (Jal Sarankchan);

h) Capacity building, training and awareness campaign including low cost

publications, use of pico projectors and low cost films for encouraging potential

use water source through technological, agronomic and management practices

including community irrigation.

i) The extension workers will be empowered to disseminate relevant technologies

under PMKSY only after requisite training is provided to them especially in the

area of promotion of scientific moisture conservation and agronomic measures,

improved/ innovative distribution system like pipe and box outlet system, etc.

Appropriate Domain Experts will act as Master Trainers.

j) Information Communication Technology (ICT) interventions through NeGP-A to

be made use in the field of water use efficiency, precision irrigation technologies,

on farm water management, crop alignment etc. and also to do intensive

monitoring of the Scheme.

4. PMKSY (Watershed Development)

a) Effective management of runoff water and improved soil & moisture conservation

activities such as ridge area treatment, drainage line treatment, rain water

harvesting, in-situ moisture conservation and other allied activities on watershed

basis.

b) Converging with MGNREGS for creation of water source to full potential in

identified backward rainfed blocks including renovation of traditional water

bodies

Rationale/ Justification

In reference to the status and need of irrigation, the water resource management

including irrigation related priorities was identified for Girsomnath district by the

peoples‟ representatives of district with support from administration and technical

experts. For instance the reports of Strategic Research and Extension Plan (SREP)

prepared under ATMA program, Comprehensive District Agriculture Plan (C-DAP)

prepared as part of Rashtriya Krishi Vikas Yojana (RKVY), Potential Linked Credit Plans

(PLP) of NABARD and the Integrated District Development Plan etc. identified number

of irrigation related issues for Girsomnath district including (i) promoting water use

Page 17: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

15 | P a g e

efficiency through sprinkler and drip irrigation; (iii) promoting protected polyhouse

cultivation to minimize risk factors and enhance quality and productivity; (iv)

Improvement of on-farm water delivery and efficiency of existing irrigation systems; (v)

promotion of soil conservation of arable & non-arable land through engineering

measures; (vi) creation of new water harvesting structures, check dams, ponds, tanks,

etc (vii) increase the forest cover in the district and (viii) land improvement measures.

Methodology

During the course of preparation of District Irrigation Plan (DIP) the team visited

Girsomnath district to collect data and have interaction with all the stakeholders.

Methodology adopted to prepare DIP is outlined in brief as under:

a) Collection of primary and secondary data from field from various sources

including published documents and websites.

b) Various meetings were held to obtain ground level realities and data from key

personnel/stakeholders through structured, unstructured interviews, focused

group discussions etc.

c) Meetings with various State Government departments and related institutions

were held

d) Meeting through VC was also held with State Level authorities.

e) GIS maps of the area‟s/clusters were studied to understand the land

morphology, topography of the district.

f) Focused group discussions and interaction with of agriculture officers,

horticulture officers, soil conservation officers, extension officers, rural

development department, animal husbandry department, irrigation officers

both at blocks and district level for identifying the key issues and focus areas of

the region.

g) Discussion with NABARD officer of Girsomnath district was also held during

the visit.

h) Team members also participated in the State Level workshop and held active

discussions with GoI officers, State Level officers and scientists of various

institutions

i) In the district at Panchayat level schemes were identified as per the need and

potential and resolutions were passed by the Panchayat to include the schemes

in PMKSY. The Panchayat resolutions were then consolidated and put up in the

Block Development Committee and a block plan was put up in the Zila

Parishad along with the programme of other line departments participating in

implementation of PMKSY. Besides IWMP prepared by District Water

Development agency was also proposed and approved by the Zila Parishad

Girsomnath in its meeting.

Page 18: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

16 | P a g e

On the basis of detailed discussion and analysis of data, the team arrived at the

projections various components of PMKSY and Department wise plan for four years

from 2016-17 to 2019-20 as detailed in the plan.

Page 19: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

17 | P a g e

CHAPTER 1. GENERAL INFORMATION OF THE DISTRICT

1.1 District Profile

Girsomnath district was carved from Junagad district as one of the new seven districts

in August 2013. Head quarter of the district is at Veraval. Gir somnath district is located

in Saurastra region of Gujarat and surrounded by the Arabian Sea to its south. The

district is divided in to six talukas, Veraval, Una, Kodinar, Sutrapada, Talala and newly

formed Gir gadhada, Gir somnath is very famous for Somnath Temple, first jyotirlinga

of lord shiva among the tweleve Jyotirlinga of India and Gir Sanctuary, only abode to

Asiatic lion.

Major industries such as, Ambuja cement, Gujarat heavy chemicals, Aditya birla nuvo

ltd(Indian Rayon), Gujarat siddhi cement have their presence in this district, Total

population of the district was about 12.5 lacs in 2011 census. Major crops of gir somnath

district are groundnut, wheat, cotton and sugar cane.

Veraval is a Municipality and the headquarters of Gir Somnath district. Fisheries have

always been the main industries in the town and are dominated by the Kharwas

(fisherfolk). Fishing is done mostly on traditional boats and trawlers. Veraval also has a

large boat making industry. Veraval is home to a large number of fish processing

factories in G.I.D.C, which export prime quality seafood to USA, Japan, SE Asian, Gulf

and EU Countries. The seafood-industry, which has started through government

initiative, now is in its prime and many importers are attracted towards Veraval from

around the globe. Regional research centers of CIFT and CMFRI situated at Veraval,

which are helping development of fisheries sector in Gujarat. Veraval also is home to

Aditya Birla Nuvo Ltd (Formerly: India-Rayon Industries Ltd) which is one of India‟s

largest rayon manufacturing companies.

Una is the biggest talukain Gir Somnath district in number of villages. Main tourist

attractions are Pauranik Talav (Ancient Lake), Rawal Dam, Ahmedpur Mandvi Beach,

Sana Cave an ancient places, Tulsishyam famous for temple of lord Krishna, Banej

Temple of Mahadev in middle of Gor forest. Una is one of the "the biggest Limestone

supplier" in Gujarat State.

Kodinar : Main tourist attractions are Mul Dwarka, Kaj and Kanjotar a small seashore

villages near Kodinar in which mul dwarka is a historic place of the original Dwarka of

Mahabharata. Kodinar is home to Gujarat Ambuja Cement Ltd. One of the largest

cement manufacturing company.

Talala Gir is Famous for its "KESAR MANGO", Siddi‟s folk dance "Dhamal and Gir

Page 20: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

18 | P a g e

national park and Sanctuary". Siddi people who are originally from the south Africa are

found in Jambur village, also known as Mini Africa of India.

Sutrapada is a coastal taluka of Gir somnath district. This place is known for GHCL

plant, largest "Soda ash" producing company in the world. Gujarat Siddhi cement

manufacturing plant is also located in the taluka.

Gir Gadhada is the newly formed taluka of the district. It is curved out from Una taluka

in August 2013. Famous Tulsi shyam, temple of Lord Krishna is situated in this taluka.

The District Comprises 06 Talukas.

SR. NO NAME OF TALUKA

1 Talala 2 Veraval 3 Una 4 Kodinar 5 Sutrapada 6 Gir Gadhada

Table 1: District Profile

Name of the District

District Code Latitude Longitude

Girsomnath 20.9060 N 70.3844 E

.

Page 21: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

19 | P a g e

Map 1: Location and administrative boundaries of Girsomnath

1.2 Demography

As per the 2011 census, the population of the district was 1217477 out of which number

of males and females were 620026 and 597451, respectively (Table 2.2). The male

literacy rate of the district is 54 per cent and female literacy rate is 46% currently as per

Collectorate website.

Table 2: Population of Girsomnath as per Census 2011 Block Name Population

M F Total

Talala 69833 65898 135731

Patan Verawal 164466 158026 322492

Sutrapada 72091 69877 141968 Kodinar 115684 113125 228809

Una 197952 190525 388477

Total 620026 597451 1217477

It must be noted that as GirGadhada was formed in 2013,Census data of 2011 pertaining

to it is not available separately.

As we can see from the above pie chart, Una holds the largest proportion (32%) of

population of Girsomnath District.

135731, 11%

322492, 26%

141968, 12%228809, 19%

388477, 32%

Taluka wise population and their percentage in total population of

Girsomnath

Talala Patan Verawal Sutrapada Kodinar Una

Page 22: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

20 | P a g e

The sex ratios of various talukas of Girsomnath district is shown in the following table:

Table 3: Sex ratio by Sub-district, 2011 Sr.No. Name of Sub-district Sex ratio

Total Rural Urban

1 03834-Talala 944 950 911

2 03835-Patan-Veraval 961 955 965

3 03836-Sutrapada 969 972 959

4 03837-Kodinar 978 981 965

5 03838-Una 962 966 943

Source: Census 2011

The number of Schedule Caste and Schedule Tribes population and their proportion to

the total population is shown in the following table. It can be seen from the table that

Kodinar leads in Schedule Castes population with 35,346 persons comprising 15.45% of

the total population of the district. In case of Schedule Tribes, Talala leads with 7,672

persons comprising of 5.65% of the total population of the district.

Table 4: Demographic profile of Girsomnath

Table 2.4: Number and percentage of scheduled castes and scheduled tribes population in Sub-districts, 2011

Sr.No. Name of Sub-District

Total/ Rural/ Urban

Total population

Total scheduled

castes population

Total scheduled

tribes population

Percentage of

scheduled castes

population to total

population

Percentage of scheduled

tribes population

to total population

1 2 3 4 5 6 7 8 1 03834-Talala Total 135731 10451 7672 7.7 5.65

Rural 114671 9238 5560 8.06 4.85

Urban 21060 1213 2112 5.76 10.03

2 03835-Patan-Veraval Total 322492 26790 5798 8.31 1.8

Rural 136695 17357 2802 12.7 2.05

Urban 185797 9433 2996 5.08 1.61

3 03836-Sutrapada Total 141968 14588 1042 10.28 0.73

Rural 115836 13221 819 11.41 0.71

Urban 26132 1367 223 5.23 0.85

4 03837-Kodinar Total 228809 35346 1142 15.45 0.5

Rural 187317 30825 956 16.46 0.51

Urban 41492 4521 186 10.9 0.45

Page 23: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

21 | P a g e

5 03838-Una Total 388477 26647 2107 6.86 0.54

Rural 329949 23438 1805 7.1 0.55

Urban 58528 3209 302 5.48 0.52

Source: Census 2011

1.3 Biomass and Livestock

Livestock Population

The livestock population in various taluka for Girsomnath district is provided in the

following table.The data is as per Livestock Census, 2012.The total livestock population

of the district is 607,673.

Table 5: Biomass and livestock in Girsomnath district

Sr. No. Name of Block/Taluka Total

1 VERAVAL 136731

2 SUTRAPADA 94556

3 TALALA 55099

4 KODINAR 143722

5 UNA 95468

6 GIR GADHADA 82097

Total 607673

Source: Livestock Census, GoG

136731

94556

55099143722

95468

82097

Livestock population of Girsomanthy distrcit taluka wise

VERAVAL SUTRAPADA TALALA KODINAR UNA GIR GADHADA

Page 24: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

22 | P a g e

As we can see from the above chart, Kodinar leads in the livestock population with

143,722 animals comprising 23.65% of the total livestock of the district.

Small Animals

The small animals‟ livestock population data is providedin Table 1.3 (a). Verawal has the

largest number of poultry(44,669) followed by Kodinar(6,887).Kodinar leads in the total

number of goats(14,761) while Una leads in the total number of sheep (8,612).

Table 6: Block Wise No of Livestock in Girsomnath District as per 2012 Livestock Census Sr. No.

Name of Block/Taluka

Small Animals

Poultry (No.)

Ducks (No.)

Pigs (No.)

Goats (No.)

Sheeps (No.)

1 VERAVAL 44669 0 0 10769 1255

2 SUTRAPADA 4093 0 0 9253 2660

3 TALALA 0 0 0 4367 590

4 KODINAR 6887 0 0 14761 3546

5 UNA 5000 0 0 7460 8612

6 GIR GADHADA

0 0 0 4955 2351

Total 60649 00 0 51565 19014

Source: Livestock Census,2012

Large Animals

The large animals and other milch animals population data is provided in Table.

The total large livestock population of the district is 310,674. Talala has the largest

number of indigenous cows(39,138) while Una leads in the number of

buffaloes(42,442).

Table 7: Block Wise No of Livestock in Girsomnath District as per 2012 Livestock Census Sr. No.

Name of Block/Taluk

a

Large Animals

Indigenous Cow (Nos.)

Hybrid Cow (No.)

In Descriptive Buffalo

(No.)

Hybrid Buffalo (No.)

Any other MilchorMeatAnimal(Nos.)

Draft Animal (Buffalo/yak/bulls/any other (Nos.)

1 VERAVAL 19679 0 16592 0 0 82

2 SUTRAPADA 28391 0 31033 0 0 257

3 TALALA 39138 0 30538 0 0 112

4 KODINAR 16710 0 23707 0 0 160

5 UNA 30147 0 42442 0 0 291

6 GIR 15497 0 15838 0 0 60

Page 25: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

23 | P a g e

GADHADA

Total 149562 160150 962

Source: Livestock Census,2012

1.4 Climate and Rainfall

The district is in agro-climatic zone VI (South Saurashtra) and VII (North Saurashtra).

The climate of the district varies from hot to moderately hot throughout the year except

in winter. The climate is humid in coastal belt, (The temperature varies between 10

Centigrade being minimum in January and 42 Centigrade being maximum in May).

It receives rains from southwest monsoon from June to September. The average rainfall

of last three years is 559 MM

The following table depicts normal annual rainfall and temperature data.

Table 8: Agro ecology of Girsomnath

Name of District

Agro Ecological Zone Type

Normal Annual Rainfall(mm)

Average Monthly Rainfall

(mm)

Average Weekly Temperature (°C)

Period

Summer (April-May)

Winter (Oct-Mar)

Rainy (June-Sept)

Min. Max.

Mean

Min.

Max.

Mean

Min. Max. Mean

Girsomnath

South Saurastra Agro Climatic Zone

745.1 67.73 24.05

29.97

27.22

16.2

29.4

23.16

24.82

30.85

27.95

Source: C-DAP JAU Junagadh(Aug 2012),_Jilla ni Ankadakiya Ruprekha 2012-13, District panchayat,

Junagadh, Weather station Ambuja Cement Limited Ambujanagar

1.5 Soil Profile

The soils in the district are formed from sedimentary rocks and partly from volcanic

rocks. They are generally calcareous, rich in potassium content but comparatively

deficient in nitrogen and humus. The main types of soils occurring in the district are

Black soil, Medium black soil, Alluvial soil and in low-lying and coastal area, calcareous

and brackish soils. The black soil is foundin every part of the district. Though the soil of

this tract is fertile, water logging conditions prevent effective utilization of the land.

The soil profile of the district is summarized below in the following table 1.5:

Table 9: Block wise Soil Classification

Sr. No.

Name of Taluka Soil Type

Major Soil Classes Area ('000ha)

1 Kodinar Medium to Shallow Black 37.56

Mixed Red and Black 5.36

Page 26: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

24 | P a g e

Coastal Alluvial 10.73

2 Sutrapada Medium to Shallow Black 15.31

Coastal Alluvial 6.09

3 Talala Shallow to Medium Black 30.22

4 Veraval Shallow to Medium Black 15.49

Coastal Alluvial 9.6

5 Una, Girgadhda Medium to Shallow Black 110.93

Mixed Red and Black 15.84

Coastal Alluvial 31.69

Source: C-DAP-Junagad,2012.

1.6 Land Use Pattern

The land use pattern is described in the following table. The total geographical area of

the district is 375,452 out of which 182,584 is under agriculture(48.63%).The cropping

intensity is 4 talukas is phenomenal and low cropping intensity in Talala can be owed to

large forest areas in the Taluka.

Table 10: Blockwise land use patternArea in Ha

Sr. No.

Name of the Block

Total Geographical

Area

Area under Agriculture

Area under Forest

Non-agri use

Gross Cropped Area(1)

Net Sown Area (2)

Area Sown more

than one (1-2)

Cropping Intensity

(%)

Page 27: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

25 | P a g e

1 Kodinar 53681 59069 40131 18938 147.19 2739 3985

2 Talala 95156 33839 30216 3623 111.99 10023 11398

3 Sutrapada 32671 29467 21400 8067 137.7 0 5617

4 Una 157847 87173 65745 64038 132.59 5246 15176

5 Veraval 36097 46282 25092 21190 184.45 1770 6050

Total 375452 255830 182584 115856 142.78 19778 42226

Source: C-DAPJunagad-2012.

Note: The data related to irrigation in point 2.3 is provided by the Agriculture department and those

above is provided by C-DAP, so the figures might differ.

Page 28: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

26 | P a g e

CHAPTER 2. DISTRICT WATER PROFILE

Agriculture and horticulture plays an important role in rural economy of Girsomnath.

Major cropsgrown in the district are Groundnut, Wheat, Gram, Cotton, and sugarcane,

Bajri and Jowar, Pulses. Groundnut is the most important crop of the district. Second

most important crop in the district is wheat.

2.1 Area Wise, Crop Wise Irrigation Status

The taluka wise details regarding irrigation availability and potential is provided in the

following tables. It can be observed from the table that to make farmer competent to go

for multiple-cropping and to ensure that they can grow crops in summer and rabi

seasons too to expand their income, it is essential that irrigation potential of the district

has to be upgraded significantly.

Table 11: Block wise Area under Various Crops(Area in hectare)

YEAR:2015-16

Source:Dist Agri Dept

Area-Wise ,Crop-wise Irrigation status Block: Veraval

Crop type Kharif (Area in ha.) Rabi(Area in ha.) Summer crop(Area in ha.)

Tot (Area in ha.)

Irr RF Tot Irr RF

Tot Irr RF Tot Irr RF Tot

A)Cereals 0 450 450 1850

0 1850

105 0 105 1955 450 2405

B)Coarse cereals 0 0 0 0 0 0 0 0 0 0 0 0

C)Pulses 0 1100 1100 100 0 100 2400 0 2400 2500 1100 3600

D)Oil seeds 8800

10450

19250

0 0 0 40 0 40 8840 10450

19290

E)Fiber 200 0 200 0 0 0 0 0 0 200 0 200

F).Any other crops

4250 0 4250 9250

0 9250

1075 0 1075 14575

0 14575

Block: Sutrapada

Crop type Kharif (Area in ha.) Rabi(Area in ha.) Summer crop(Area in ha.)

Tot (Area in ha.)

Irr RF Tot Irr RF

Tot Irr RF Tot Irr RF Tot

A)Cereals 0 225 225 6410

0 6410

70 0 70 6480 225 6705

B)Coarse cereals 0 0 0 0 0 0 0 0 0 0 0 0

C)Pulses 0 135 135 20 0 20 2225 0 2225 2245 135 2380

D)Oil seeds 3700 14800

18500

0 0 0 40 0 40 3740 14800

18540

E)Fiber 1500 0 1500 0 0 0 0 0 0 1500 0 1500

F).Any other crops

3340 0 3340 3710

0 3710

310 0 310 7360 0 7360

Block: Talala

Page 29: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

27 | P a g e

Crop type Kharif (Area in ha.) Rabi(Area in ha.) Summer crop(Area in ha.)

Tot (Area in ha.)

Irr RF Tot Irr RF

Tot Irr RF Tot Irr RF Tot

A)Cereals 0 65 65 1080

0 1080

280 0 280 1360 65 1425

B)Coarse cereals 0 0 0 0 0 0 0 0 0 0 0 0

C)Pulses 0 810 810 75 0 75 3300 0 3300 3375 810 4185

D)Oil seeds 830 7544 8374 0 0 0 775 0 775 1605 7544 9149

E)Fiber 682 0 682 0 0 0 0 0 0 682 0 682

F).Any other crops

5865 0 5865 10435

0 10435

2575 0 2575 18875

0 18875

Block:Kodinar

Crop type Kharif (Area in ha.) Rabi(Area in ha.) Summer crop(Area in ha.)

Tot (Area in ha.)

Irr RF Tot Irr RF

Tot Irr RF Tot Irr RF Tot

A)Cereals 0 1600 1600 8500

0 8500

220 0 220 8720 1600 10320

B)Coarse cereals 0 0 0 0 0 0 0 0 0 0 0 0

C)Pulses 0 400 400 20 0 20 4850 0 4850 4870 400 5270

D)Oil seeds 8000

10227

18227

0 0 0 65 0 65 8065 10227

18292

E)Fiber 5000 0 5000 0 0 0 0 0 0 5000 0 5000

F).Any other crops

7700 0 7700 6250

0 6250

785 0 785 14735

0 14735

Block:Una

Crop type Kharif (Area in ha.)

Rabi(Area in ha.)

Summer crop(Area in ha.)

Tot (Area in ha.)

Irr RF Tot Irr RF

Tot Irr RF Tot Irr RF Tot

A)Cereals 0 800 800 3200

0 3200

50 0 50 3250

800 4050

B)Coarse cereals

0 0 0 0 0 0 0 0 0 0 0 0

C)Pulses 0 0 0 155 0 155 100 0 100 255 0 255

D)Oil seeds 1800

16650

18450

0 0 0 170 0 170 1970 16650

18620

E)Fiber 16800

0 16800

0 0 0 0 0 0 16800

0 16800

F).Any other crops

7450

0 7450

5765

0 5765

400 0 400 13615

0 13615

Block: Gir Gadhada

Crop type Kharif (Area in ha.)

Rabi(Area in ha.)

Summer crop(Area in ha.)

Tot (Area in ha.)

Irr RF Tot Irr RF

Tot Irr RF Tot Irr RF Tot

A)Cereals 0 650 650 2240

0 2240

50 0 50 2290

700 2990

B)Coarse 0 0 0 0 0 0 0 0 0 0 0 0

Page 30: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

28 | P a g e

cereals

C)Pulses 0 45 45 180 0 180 130 0 130 310 175 485

D)Oil seeds 3700

7700

11400

0 0 0 280 0 280 3980

7980

11960

E)Fiber 7050

0 7050

0 0 0 0 0 0 7050

0 7050

Block wise area under Horticulture in Ha

Table 12: Area with horticulture cropsArea in Ha

Sr No Taluka Name

Flower Area

Vegetable Area

Fruit area

Total area

1 Veraval 1000 2535 1448 4983

2 Sutrapada 460 1335 370 2165

3 Una 430 4845 5458 10733

4 Talala 807 1560 7514 9881

5 Kodinar 890 2605 1644 5139

Total 3587 12880 16434 32901

Source: Horticulture Dept, GoG

As we can see from the above table, Girosmnath has 31,901 Ha of land under

horticulture, which is fully irrigated. The highest area under Horticulture is in the Una

Taluka of the district (10,733 Ha).

2.2 Production and Productivity of Major Crops

Agricultural productivity measures the ratio of agricultural outputsto Agricultural inputs

and it is indispensable to raise the level of productivity so that the farmer can earn more

from his limited land, which is invariable factor. The productivity and production of

various crops in each district is provided in the table below:

Table 13: Block wise Area under Various Crops(Area in hectare) Block :Talala

Season

Rainfed Irrigated Total

Crops

Area (ha)

Production

(qtn/yr)

Productivity or yield (kg/h

a)

Cost of

cultivation

(rs/ha)

Area (ha)

Productio

n (qtn/yr)

Productivity or yield (kg/h

a)

Cost of

cultivation (rs/h

a)

Area(ha)

Production

(qtn/yr)

Productivity

or yield

(kg/ha)

Cost of

cultivation

(rs/ha)

Kharif

Paddy

0 0 0 Na 0 0 Na 0 0 0 Na

Jowar

0 0 0 Na 0 0 Na 0 0 0 Na

Page 31: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

29 | P a g e

Bajri 0 0 0 Na 50 719 1437 Na 50 719 1437 Na

Maize

0 0 0 Na 0 0 Na 0 0 0 Na

Ragi 0 0 0 Na 0 0 Na 0 0 0 Na

Mung

0 0 0 Na 60 259 431 Na 60 259 431 Na

Math

0 0 0 Na 0 0 Na 0 0 0 Na

Udid 0 0 0 Na 310

1764 569 Na 310 1764 569 Na

Tur 0 0 0 Na 0 0 0 Na 0 0 0 Na

Groundnut

0 0 0 Na 19200

302976

1578 Na 19200

302976

1578 Na

Castor

0 0 0 Na 200

4054

2027 Na 200 4054 2027 Na

Sesamum

0 0 0 Na 20 71 357 Na 20 71 357 Na

Cotton

0 0 0 Na 95 599 630 Na 95 599 630 Na

Tobacco

0 0 0 Na 0 0 0 Na 0 0 0 Na

Guar seed

0 0 0 Na 0 0 0 Na 0 0 0 Na

Soyabean

0 0 0 Na 0 0 0 Na 0 0 0 Na

Rabi

Wheat

0 0 0 Na 0 0 0 Na 0 0 0 Na

Jowar

0 0 0 Na 0 0 0 Na 0 0 0 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Gram

0 0 0 Na 0 0 0 Na 0 0 0 Na

Rapeseed & mustard

0 0 0 Na 0 0 0 Na 0 0 0 Na

Sugarcane

0 0 0 Na 1850

136919

7401 Na 1850 136919

7401 Na

Isabgul

0 0 0 Na 0 0 0 Na 0 0 0 Na

Fennel

0 0 0 Na 0 0 0 Na 0 0 0 Na

Tobacco

0 0 0 Na 0 0 0 Na 0 0 0 Na

Summe

Groundnut

0 0 0 Na 500

9140 1828 Na 500 9140 1828 Na

Page 32: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

30 | P a g e

r Bajra

0 0 0 Na 200

5390 2695 Na 200 5390 2695 Na

Paddy

0 0 0 Na 0 0 0 Na 0 0 0 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Mung

0 0 0 Na 300

1530 510 Na 300 1530 510 Na

Udid 0 0 0 Na 200

1288 644 Na 200 1288 644 Na

Sesamum

0 0 0 Na 1500

7785 519 Na 1500 7785 519 Na

Total

0 0 0 0 24485

472492

20626

0 24485

472492

20626 0

Block :Veraval

Season

Rainfed Irrigated Total

Crops

Area (ha)

Productio

n (qtn/yr)

Productivity or yield (kg/h

a)

Cost of

cultivation

(rs/ha)

Area (ha)

Productio

n (qtn/yr)

Productivity or yield (kg/h

a)

Cost of

cultivation (rs/h

a)

Area(ha)

Production

(qtn/yr)

Productivity

or yield

(kg/ha)

Cost of

cultivation

(rs/ha)

Kharif

Paddy

0 0 0 Na 0 0 0 Na 0 0 0 Na

Jowar

0 0 0 Na 0 0 0 Na 0 0 0 Na

Bajri 0 0 0 Na 3000

43110

1437 Na 3000 43110 1437 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Ragi 0 0 0 Na 0 0 0 Na 0 0 0 Na

Mung

0 0 0 Na 340

1465 431 Na 340 1465 431 Na

Math

0 0 0 Na 0 0 0 Na 0 0 0 Na

Udid 0 0 0 Na 470

2674 569 Na 470 2674 569 Na

Tur 0 0 0 Na 45 465 1034 Na 45 465 1034 Na

Groundnut

11000

173580

1578 Na 4800

75744

1578 Na 15800

249324

1578 Na

Castor

0 0 0 Na 700

14189

2027 Na 700 14189 2027 Na

Sesamum

140 499.8

357 Na 0 0 0 Na 140 500 357 Na

Cotton

0 0 0 Na 7850

49455

630 Na 7850 49455 630 Na

Tobacco

0 0 0 Na 0 0 0 Na 0 0 0 Na

Page 33: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

31 | P a g e

Guar seed

0 0 0 Na 55 367 667 Na 55 367 667 Na

Soyabean

0 0 0 Na 0 0 0 Na 0 0 0 Na

Rabi

Wheat

0 0 0 Na 15100

606265

4015 Na 15100 606265

4015 Na

Jowar

0 0 0 Na 0 0 0 Na 0 0 0 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Gram

0 0 0 Na 30 566 1886 Na 30 566 1886 Na

Rapeseed & mustard

0 0 0 Na 50 500 1000 Na 50 500 1000 Na

Sugarcane

0 0 0 Na 5100

377451

7401 Na 5100 377451

7401 Na

Isabgul

0 0 0 Na 0 0 0 Na 0 0 0 Na

Fennel

0 0 0 Na 0 0 0 Na 0 0 0 Na

Tobacco

0 0 0 Na 0 0 0 Na 0 0 0 Na

Summer

Groundnut

0 0 0 Na 2610

47711

1828 Na 2610 47711 1828 Na

Bajra

0 0 0 Na 1950

52553

2695 Na 1950 52553 2695 Na

Paddy

0 0 0 Na 0 0 0 Na 0 0 0 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Mung

0 0 0 Na 55 281 510 Na 55 281 510 Na

Udid 0 0 0 Na 0 0 0 Na 0 0 0 Na

Sesamum

0 0 0 Na 0 0 519 Na 0 0 0 Na

Total

11140

174080

1935 0 42155

1272795

28227

0 53295 1446875

28065 0

Block :Sutrapada

Season

Rainfed Irrigated Total

Crops

Area (ha)

Productio

n (qtn

Productivity or yield

Cost of

cultivati

Area (ha)

Productio

n (qtn

Productivity or yield

Cost of

cultivation

Area(ha)

Production

(qtn/yr)

Productivity

or yield

Cost of

cultivati

Page 34: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

32 | P a g e

/yr) (kg/ha)

on (rs/ha)

/yr) (kg/ha)

(rs/ha)

(kg/ha)

on (rs/ha)

Kharif

Paddy

0 0 0 Na 0 0 0 Na 0 0 0 Na

Jowar

0 0 0 Na 0 0 0 Na 0 0 0 Na

Bajri 305 4382.85

1437 Na 0 0 0 Na 305 4383 1437 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Ragi 0 0 0 Na 0 0 0 Na 0 0 0 Na

Mung

315 1357.65

431 Na 0 0 0 Na 315 1358 431 Na

Math

0 0 0 Na 0 0 0 Na 0 0 0 Na

Udid 495 2816.55

569 Na 0 0 0 Na 495 2817 569 Na

Tur 0 0 0 Na 0 0 0 Na 0 0 0 Na

Groundnut

20435

322464.3

1578 Na 0 0 0 Na 20435

322464

1578 Na

Castor

0 0 Na 0 0 0 Na 0 0 0 Na

Sesamum

0 0 357 Na 0 0 0 Na 0 0 0 Na

Cotton

1235 2457.65

199 Na 0 0 0 Na 1235 2458 199 Na

Tobacco

0 0 0 Na 0 0 0 Na 0 0 0 Na

Guar seed

0 0 0 Na 80 534 667 Na 80 534 667 Na

Soyabean

0 0 0 Na 0 0 0 Na 0 0 0 Na

Rabi

Wheat

0 0 0 Na 18200

730730

4015 Na 18200

730730

4015 Na

Jowar

0 0 0 Na 5 85 1701 Na 5 85 1701 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Gram

0 0 0 Na 50 943 1886 Na 50 943 1886 Na

Rapeseed & mustard

0 0 0 Na 60 600 1000 Na 60 600 1000 Na

Sugarcane

0 0 0 Na 0 0 0 Na 0 0 0 Na

Page 35: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

33 | P a g e

Isabgul

0 0 0 Na 0 0 0 Na 0 0 0 Na

Fennel

0 0 0 Na 0 0 0 Na 0 0 0 Na

Tobacco

0 0 0 Na 0 0 0 Na 0 0 0 Na

Summer

Groundnut

0 0 0 Na 280

5118 1828 Na 280 5118 1828 Na

Bajra

0 0 0 Na 550

14823

2695 Na 550 14823 2695 Na

Paddy

0 0 0 Na 0 0 0 Na 0 0 0 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Mung

0 0 0 Na 145

740 510 Na 145 740 510 Na

Udid 0 0 0 Na 275

1771 644 Na 275 1771 644 Na

Sesamum

0 0 0 Na 1000

5190 519 Na 1000 5190 519 Na

Total

22785

333479

4571 0 20645

760533

15465

0 43430

1094012

19679 0

Block :Kodinar Season

Rainfed Irrigated Total

Crops

Area (ha)

Productio

n (qtn/yr)

Productivity or yield (kg/h

a)

Cost of

cultivation

(rs/ha)

Area (ha)

Productio

n (qtn/yr)

Productivity or yield (kg/h

a)

Cost of

cultivation (rs/h

a)

Area(ha)

Production

(qtn/yr)

Productivity

or yield

(kg/ha)

Cost of

cultivation

(rs/ha)

Kharif

Paddy

0 0 0 Na 0 0 0 Na 0 0 0 Na

Jowar

0 0 0 Na 0 0 0 Na 0 0 0 Na

Bajri 0 0 0 Na 3000

43110

1437 Na 3000 43110 1437 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Ragi 0 0 0 Na 0 0 0 Na 0 0 0 Na

Mung

0 0 0 Na 340

1465 431 Na 340 1465 431 Na

Math

0 0 0 Na 0 0 0 Na 0 0 0 Na

Udid 0 0 0 Na 470

2674 569 Na 470 2674 569 Na

Tur 0 0 0 Na 45 465 1034 Na 45 465 1034 Na

Page 36: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

34 | P a g e

Groundnut

11000

173580

1578 Na 4800

75744

1578 Na 15800

249324

1578 Na

Castor

0 0 0 Na 700

0 0 Na 700 0 0 Na

Sesamum

140 499.8

357 Na 0 0 0 Na 140 500 357 Na

Cotton

0 0 0 Na 7850

49455

630 Na 7850 49455 630 Na

Tobacco

0 0 0 Na 0 0 0 Na 0 0 0 Na

Guar seed

0 0 0 Na 55 367 667 Na 55 367 667 Na

Soyabean

0 0 0 Na 0 0 0 Na 0 0 0 Na

Rabi

Wheat

0 0 0 Na 15100

606265

4015 Na 15100 606265

4015 Na

Jowar

0 0 0 Na 0 0 0 Na 0 0 0 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Gram

0 0 0 Na 30 566 1886 Na 30 566 1886 Na

Rapeseed & mustard

0 0 0 Na 50 500 1000 Na 50 500 1000 Na

Sugarcane

0 0 0 Na 5100

377451

7401 Na 5100 377451

7401 Na

Isabgul

0 0 0 Na 0 0 0 Na 0 0 0 Na

Fennel

0 0 0 Na 0 0 0 Na 0 0 0 Na

Tobacco

0 0 0 Na 0 0 0 Na 0 0 0 Na

Summer

Groundnut

0 0 0 Na 2610

47711

1828 Na 2610 47711 1828 Na

Bajra

0 0 0 Na 1950

52553

2695 Na 1950 52553 2695 Na

Paddy

0 0 0 Na 0 0 0 Na 0 0 0 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Mung

0 0 0 Na 55 281 510 Na 55 281 510 Na

Udid 0 0 0 Na 0 0 0 Na 0 0 0 Na

Sesa 0 0 0 Na 0 0 519 Na 0 0 0 Na

Page 37: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

35 | P a g e

mum

Total

11140

174080

1935 0 42155

1258606

26200

0 53295 1432686

26038 0

Block :Una Season

Rainfed Irrigated Total

Crops

Area (ha)

Productio

n (qtn/yr)

Productivity or yield (kg/h

a)

Cost of

cultivation

(rs/ha)

Area (ha)

Productio

n (qtn/yr)

Productivity or yield (kg/h

a)

Cost of

cultivation (rs/h

a)

Area(ha)

Production

(qtn/yr)

Productivity

or yield

(kg/ha)

Cost of

cultivation

(rs/ha)

Kharif

Paddy

0 0 0 Na 0 0 0 Na 0 0 0 Na

Jowar

0 0 0 Na 0 0 0 Na 0 0 0 Na

Bajri 0 0 0 Na 3000

43110

1437 Na 3000 43110 1437 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Ragi 0 0 0 Na 0 0 0 Na 0 0 0 Na

Mung

0 0 431 Na 340

1465 431 Na 340 1465 431 Na

Math

0 0 0 Na 0 0 0 Na 0 0 0 Na

Udid 0 0 569 Na 470

2674 569 Na 470 2674 569 Na

Tur 0 0 0 Na 45 465 1034 Na 45 465 1034 Na

Groundnut

11000

173580

1578 Na 4800

75744

1578 Na 15800

249324

1578 Na

Castor

0 0 Na 700

14189

2027 Na 700 14189 2027 Na

Sesamum

140 499.8

357 Na 0 0 0 Na 140 500 357 Na

Cotton

0 0 0 Na 7850

49455

630 Na 7850 49455 630 Na

Tobacco

0 0 0 Na 0 0 0 Na 0 0 0 Na

Guar seed

0 0 0 Na 55 367 667 Na 55 367 667 Na

Soyabean

0 0 0 Na 0 0 0 Na 0 0 0 Na

Rabi

Wheat

0 0 0 Na 1510

606265

4015 Na 15100 606265

4015 Na

Page 38: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

36 | P a g e

0

Jowar

0 0 0 Na 0 0 0 Na 0 0 0 Na

Maize

0 0 0 Na 0 0 0 Na 0 0 0 Na

Gram

0 0 0 Na 30 566 1886 Na 30 566 1886 Na

Rapeseed & mustard

0 0 0 Na 50 500 1000 Na 50 500 1000 Na

Sugarcane

0 0 0 Na 5100

377451

7401 Na 5100 377451

7401 Na

Isabgul

0 0 0 Na 0 0 0 Na 0 0 0 Na

Fennel

0 0 0 Na 0 0 0 Na 0 0 0 Na

Tobacco

0 0 0 Na 0 0 0 Na 0 0 0 Na

Summer

Groundnut

0 0 0 Na 2610

47711

1828 Na 2610 47711 1828 Na

Bajra

0 0 0 Na 1950

52553

2695 Na 1950 52553 2695 Na

Paddy

0 0 0 Na 0 0 Na 0 0 0 Na

Maize

0 0 0 Na 0 0 Na 0 0 0 Na

Mung

0 0 0 Na 55 281 510 Na 55 281 510 Na

Udid 0 0 0 Na 0 0 Na 0 0 0 Na

Sesamum

0 0 0 Na 0 0 519 Na 0 0 0 Na

Total

11140

174080

2935 0 42155

1272795

28227

0 53295 1446875

28065 0

2.3 Irrigation Based Classification

The gross irrigated area of the district is 2,36,139.34 Ha while total unirrigated area is

77887.80 Ha, which means many irrigation facilities needs to be developed in the

district.The following table gives a glimpse of irrigation based classification in the

district.

Source: Department Of Agriculture, Agriculture Statistic of state, AgriState

Table 14: Block wise Irrigation based Classification Areain Ha

Sr. No.

Blocks Irrigated Area Unirrigated area Total

Page 39: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

37 | P a g e

1 Veraval 51123.00 11284.80 62407.80

2 Sutrapada 23036.00 22822.00 45858.00

3 Una 55305.50 11685.80 66991.30

4 Talala 15019.00 751.40 15770.40

5 Kodinar 47570.90 11304.40 58875.30

Note: The data pertaining to Gir Gadhada forms part of Una block

Page 40: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

38 | P a g e

CHAPTER 3. WATER AVAILABILITY

The district has a semi-arid climate. Extreme temperatures, erratic rainfall and high

evaporation are the characteristic features of this type of climate. The average rainfall

recorded in Girsomnath district is 900mm (1950-80).

3.1 Status of Water Availability

A number of rivers drain the district Girsomnath. The principle among them is Ozat.

Other important rivers include Madhuvanti, Noli, Meghal, Hiran, Saraswati, Singarva,

Ingavadi, Rupen and Machhundri. The Ozar river originates near village Merwada of the

Bhesan taluka. After flowing through the district for a distance of 157 km, it debauches

into the Arabian Sea. The important tributaries of the Ozat River are Uben, Bhandukia,

Jhanjheshri, Fulsar and Lol. These rivers originate in the central plateau region of

Saurashtra and meanders in a radial pattern through the plains to meet the Arabian Sea.

The narrowness of the river mouths and sand bars at their mouth impedes the

floodwater, causing inundation particularly in Ghed and in coastal depressions. When

the accumulated water in the Ghed area breaks the sand bars, tidal water enters and

accumulates in the lower parts of Gheds and at places in coastal depressions.

Table 15: Status of water availability in Girsomnath(In MCM)

Sr.No.

Source Kharif Rabi Summer Total

1 Surface Irrigation

(i) Canal (Major & Medium Irrigation)

Talala 0 0.00 39.04 39.04

Veraval 0 0.00 22.13 22.13

Kodinar 0 34.68 0 34.68

Una 0 33.45 0 33.45

Gir Gadhada 0 32.84 0 32.84

TOTAL 0 100.97 61.17 162.14

(ii) Minor Irrigation tanks 0 0 0 0.00

(iii) Lift Irrigation/Diversion 0 0 0 0.00

(iv) Various Water Bodies including Rain Water Harvesting

Una 1.33 0.00 0 1.33

Kodinar 7.02 0.00 0 7.02

Talala 2.75 0.00 0 2.75

Veraval 15.72 0.00 0 15.72

Sutrapada 8.62 0.00 0 8.62

Gir Gadhada 13.31 0.00 0 13.31

TOTAL 48.75 0.00 0 48.75

(v) Treated Effluent Received from 0 0 0 0

Page 41: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

39 | P a g e

STP

(vi) Untreated Effluent 0 0 0 0

(vii)

Perennial sources of water 0 0 0 0

2 Ground Water

(i) Open Well 0 0 0 0

(ii) Deep Tube Well 0 0 0 0

(iii) Medium Tube Well 0 0 0 0

(iv) Shallw Tube Well 0 0 0 0

Total…. 48.75 100.97 61.17 210.89

Name of Block Total Sufarce Water- MCM

VERAVAL 37.85

SUTRAPADA 8.62

TALALA 41.79

KODINAR 41.70

UNA 34.78

GIR GADHADA 46.15

3.2 Status of Ground Water Availability

3.2.1 Hydrogeology

Hydro-geologically, the district area can be broadly classifiedunder hard rocks

comprising of “Deccan Traps” and soft rocks comprising of “Tertiary and Alluvium”.

Nearly 80% of the area is underlain by the Deccan Traps, 19% by the Tertiariesand the

rest by Alluvium. Hydrogeological conditions in various litho-units are described below.

The taluka wise ground water status is provided in the following table:

Deccan Trap (Hard Rock):

These are essentially basaltic flows having a general horizontal to near horizontal

disposition over large area. The basaltic flows do not have any primary porosity in the

lower massive portion, but the top vesicular portion has some primary porosity because

of the vesicles formed due to the escaping gases. Both the massive and vesicular portions

have no primary permeability, as the vesicles are seldom interconnected. The secondary

porosity and permeability developed due to fracturing and jointing provides passage for

infiltration, storage and movement of ground water. The weathered zone extends to

about 20mbgl in the surface flows. Weathered flow contacts extend to greater depths.

The permeability of these zones are further intensified by fracturing and jointing. These

inter flow zones and fractured and jointed zones have given rise to stratified aquifer

systems, which is responsible for occurrence of water even at greater depths.

Page 42: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

40 | P a g e

Weathering of basalts, which extend down to 20m and the fractured basalts beneath the

weathered mantle have given rise to water table aquifers down to 40m bgl. The depth of

water level in the basaltic area ranges from 3.30 m bgl to 25.40 m bgl during the pre-

monsoon period while during the post monsoon period the water levels ranges from

0.06 to 17.50 m bgl. The yields of the wells tapping the weathered basaltsare in the

range of 20-100 m3/day, while the yield in wells in which the inter flow zones have been

tapped range from 100-400 m3/day. The bore wells drilled in the district have yields

ranging from 100-500 m3/day.

Supratrappean and Gaj Beds Ground water in these series occur both under confined and water table conditions. The

upper granular bed of the series consist of limestone and grits form a good aquifer for

shallow ground water. Dugwells and dug cum bore wells within the depth range of 20-

25 m blg are constructed. The depth of the water level in the Gaj aquifer ranges from 5

to 15 m bgl during pre-monsoon. The yield of the wells ranges from 4 to 312m3/day and

an average yield of 66m3/day.

Miliolitic Limestone Ground water occurs under phreatic conditions. These milliolite limestone acts as a

good reservoir for shallow ground water. The depth of the water level in milliolitic

limestones is generally about 5 m bgl. Open dug wells are about 10m deep. The yield of

these wells range from 100-200 m3/day.

Alluvium Ground water occurs under unconfined conditions. The thickness of the alluvium is not

more than 20m. Because of its clayey nature, percolation of rain water is very poor

resulting in poor yields. The depth of water level ranges from 2 to 10 m bgl during the

pre-monsoon period. The yield of these wells hardly ecceeds 100 m3/day.

Water Levels Pre-monsoon period (May 2012) The map depicting the depth to water level (Figure 5.2) has been prepared based on water level data for May 2012 collected from NHS observation wells of CGWB. The depth to water levels in Junagadh district ranged from less than 2 mbgl to more

than 20 m bgl. However the water levels in Junagadh are relatively shallow and range

from 5 m bgl to 20 m bgl over most of Junagadh district. Isolated pockets of shallow

water levels were observed in the eastern extreme of Una talukas, northern parts of

Talala taluka and the western extreme of Mangrol taluka. Isolated pockets of deeper

water levels were observed in Mangarol and Malia talukas.

Page 43: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

41 | P a g e

Note: In the map the blocks which form a part of Girsomnath district post separation from

Junagadh district in August, 2013 are Una, Kodinar, Sutrapada, Veraval and Talala.

Post-monsoon period (November 2012) The depth to water level ranges from 10 to 20 m bgl over most of the Junagadh district during the post monsoon period. Isolated patches of water levels of 5-10 m bgl are observed in the eastern extreme of Una taluka, near the northern extreme of Kodinar taluka, northern and central part of Talala taluka.

Page 44: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

42 | P a g e

Note: In the map the blocks which form a part of Girsomnath district post separation from

Junagadh district in August, 2013 are Una, Kodinar, Sutrapada, Veraval and Talala.

Table 16: Ground Water Status of GirsomnathIn MCM

Sr No

Taluka/ Block

Status of block as per central ground water board notification

Ground water (MCM)

OE Critical Semi-Critical

Safe Saline Draft Recharge Gap

1 Kodinar Safe 79.596 11.88 39.16

2 Sutrapada Safe 24.26 36.13 11.88

3 Talala Safe 72.82 11.12 38.38

4 Una Safe 87.22 14.65 59.32

5 Veraval Safe 44.41 66.55 22.14

Page 45: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

43 | P a g e

3.3 Status of Command Area

The total area of canal command is 40,853 Ha out which 32,367 hais developed while

8,486 ha is undeveloped. The following table illustrates the status of command area in

the district.

Table 17: Status of CommandArea(in Ha)

Name of

the Taluka

Information of Canal Command Information on the other

Services Command

Total

Area

Developed

Area

Undeveloped

Area

Total

Area

Developed

Area

Undeveloped

Area

Verawal 8880 6665 2215 1420 1420 0

Sutrapada 0 0 0 1302 1302 0

Kodinar 6707 4133 2574 7486 7486 0

Una 12822 11697 1125 1603 1603 0

Gir Gadhada 7754 6654 1100 3236 3236 0

Talala 4690 3218 1472 1398 1398 0

TOTAL 40853 32367 8486 16445 16445 0

Source: SSNNL and WRD, Govt. of Gujarat

3.4 Existing types of Irrigation

The existing type of irrigation in the district includes primarily canal irrigation and

irrigation through ponds and well is negligible as can be observed from the following

table:

Table 18: Block wise Area under various irrigation infrastructure Area in ha.

Taluka

Canal (Area)

Pond Well/Tube Well

Check Dams/Others

Area Irr.

Nos. Area Nos. Area Nos.

Verawal 1120 0 0 5016 17599 5016 18719

Sutrapada 0 0 0 1724 10480 1724 10480

Kodinar 1050 1 150 9030 24016 9031 25216

Una 1850 0 0 15651 22778 15651 24628

Talala 1028 2 120 5230 11449 5232 12597

Total 5048 3 270 36651 86322 36654 91640

Source:SSNNL, WRD and Comprehensive Agriculture Plan, Govt. of Gujarat

Page 46: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

44 | P a g e

Note: The data for the newly formed Gir Gadhada district form part of Una district.

CHAPTER 4. WATER REQUIREMENT /DEMAND

The earlier Chapters deal with the general profileand water profile along withwater

availabilityin Girsomnath district. The present chapter deals with the current (2015) and

Page 47: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

45 | P a g e

projected (2020) demand of water for various sectors. The demand for water has been

assessedon the basis of data obtained from different departments.

4.1 Domestic Water Demand

Data of Census 2011 and 2001 has been considered to arrive at the growth rate of

population of the district. It is assumed that per capita daily water requirement of

people residing in urban areas of the district is 140 litersand for population in rural

areas, the daily per capita daily water requirement is 100liters.Using the same norms,

block-wise domestic water supply demand has been worked out and is given in table 4.1

below.

Table 19: Domestic Water Demand (MCM) Sl. No.

District Name of block

Annual water

demand in 2020

MCM

Present population-

2015

Projected Population in

2020

Annual water demand in 2015

MCM

1 Gir Somnath Talala 146589 161248 5.68 6.25

2 Gir Somnath Una 321755 353930 12.67 13.93

3 Gir Somnath Gir Gadhada

97800 107581 3.57 3.93

4 Gir Somnath Veraval 348291 383120 15.64 17.21

5 Gir Somnath Sutrapada 153325 168658 6.01 6.61

6 Gir Somnath Kodinar 247114 271825 9.67 10.64

Total 1314874 1446362 53.24 58.57

Source: Gujarat W.S.& S.Board, P.H.W.Division, Veraval

Page 48: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

46 | P a g e

4.2 Crop Water Requirement

In Girsomnath, the water requirement for various agricultural and horticultural crops

have been summarized in the following table which gives us clear picture of total water

requirement. All major agricultural crops and horticultural components like flower,

fruits and vegetables have been considered while concluding this data.

Table 20: Crop wise Water Requirement Sr. No. Blocks Area Sown

(Ha) Irrigated Area (Ha)

Water Requirement

Existing potential

Total Water requirement

in MCM

1 Veraval 62407.80 51123.00 386.22 283.45 102.77

2 Sutrapada 45858.00 23036.00 216.20 107.32 108.88

3 Una 66991.30 55305.50 423.88 335.71 88.17

4 Talala 15770.40 15019.00 148.92 135.48 13.44

5 Kodinar 58875.30 47570.90 339.60 232.40 107.20

4.3 Livestock Water Demand

The water requirement for 100 poultry is assumed as 459 litres a day while for sheep

and goats it is assumed as 5 litres of water per day.Similarly,for milch animals, 65 litres

a day and for draft animals, 60 litres a day of water requirement has been considered

while arriving at the following data concerning livestock of the district.

Talala Una Gir Gadhada Veraval Sutrapada Kodinar

Water demand in 2015 5.68 12.67 3.57 15.64 6.01 9.67

Water Demand in 2020 6.25 13.93 3.93 17.21 6.61 10.64

5.68

12.67

3.57

15.64

6.01

9.67

6.25

13.93

3.93

17.21

6.61

10.64

0

2

4

6

8

10

12

14

16

18

20

AXIS TITLE

Domestic Water Demand in MCM

Water demand in 2015 Water Demand in 2020

Page 49: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

47 | P a g e

Table 21: Livestock Water Demand

Block

Total number of live stock

Present water

demand (MCM)

Water demand in

2020 (MCM)

Existing Water

potential (MCM)

Water potential to be created

(MCM)

Veraval 136731 2.00 2.39 2.00 0.40

SUTRAPADA 94556 1.89 2.27 1.89 0.38

TALALA 55099 1.20 1.44 1.20 0.24

KODINAR 143722 2.86 3.43 2.86 0.57

UNA 95468 1.80 2.16 1.80 0.36

GIR GADHADA

82097 1.79 2.15 1.79 0.36

Total 607673 11.5326 13.83915 11.53263 2.30653

4.4 Industrial Water Requirement.

Major industries such as Ambuja cement, Gujarat heavy chemicals, Aditya Birla Nuvo

ltd (Indian Rayon), Gujarat siddhi cement have their presence in this district.Veraval is

home to a large number of fish processing factories in G.I.D.C, which export prime

quality seafood to USA, Japan, SE Asian, Gulf and EU Countries. The seafood-industry,

which was started through government initiative, now is in its prime and many

importers are attracted towards Veraval from around the globe. Regional research

centers of CIFT and CMFRI are situated at Veraval, which are helping development of

fisheries sector in Gujarat. Veraval also is home to Aditya Birla Nuvo Ltd (Formerly

India-Rayon Industries Ltd) which is one of India‟s largest rayon manufacturing

companies.

2 1.89

1.2

2.86

1.8 1.79

2.39 2.27

1.44

3.43

2.16 2.15

0.4 0.380.24

0.570.36 0.36

0

0.5

1

1.5

2

2.5

3

3.5

4

VERAVAL SUTRAPADA TALALA KODINAR UNA GIR GADHADA

Livestock Water Demand

Existing Water potential (MCM) Water demand in 2020 (MCM)

Water potential to be created (MCM)

Page 50: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

48 | P a g e

The industrial water demand as per data given by irrigation department is presented in

the following table:

Table 22: Water Demand for IndustriesFig. in Lakhs Block Name of the

industry Water

demand (MCM)

Water demand in

2020 (MCM)

Existing Water potential (MCM)

Water potential to be created

(MCM)

Veraval

IRC 8.1 8.1 8.1 0

GHCL 3.68 3.68 3.68 0

Total…. 11.78 11.78 11.78 0

4.5 Water Demand for Power Generation

The district is not having any thermal or nuclear power plant where water may be

consumed. Therefore, demand of water for power generation has been taken as nil.

4.6 Total Water Demand of the district for various sectors

This section presents the total water demand of the district and has been calculated by

summing up all major sectors consuming water. The current water demand in 2015 and

the projected water demand has been depicted in the following table

Table 23: Total Water Demand of the district for Various sectorsFig. in Lakhs Block Components

Total

, MCM

for 2020

Domestic

water demand in 2015

Domestic

Water

Demand in 2020

Crop water req

in 2015

Crop water req

in 2020

Livestock

water demand in 2015

Livestock

water demand in 2020

Industrial

water demand in 2015

Industrial

water demand in 2020

Powergeneration water

demand 2015 and

2020

Total

MCM for

2015

VERAVAL 15.64 17.21 318.32

318.32

2.00 2.39 11.78 12.958

0 347.74

350.88

SUTRAPADA

6.01 6.61 124.87

124.87

1.89 2.27 0 0 0 132.77

133.75

TALALA 5.68 6.25 189.23

189.23

1.20 1.44 0 0 0 196.11

196.92

KODINAR

9.67 10.64

271.48

271.48

2.86 3.43 0 0 0 284.01

285.55

UNA 12.67

13.93

404.57

404.57

1.80 2.16 0 0 0 419.04

420.67

GIR GADHADA

3.57 3.93 1.79 2.15 0 0 0 5.36 6.07

Total 53.24

58.57

1308.47

1308.47

11.54

13.84 11.78 12.958

0 1385.03

1393.84

Page 51: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

49 | P a g e

During 2015, total water requirement of the district has been assessed at 1385.03 MCM in which crop water requirement comprises 94% of total water requirement. During 2020, total water requirement of the district has been assessed at 1393.84 MCM.

The following chart depicts the share of each sector in the water requirement for the year 2015 for Gir Somnath district.

Fig.Water Requirement for Various Sectors (2015)

The percentage share of various sector remain same in 2020.

4.7 Water Budget

While assessing the water being used from Surface sources and through Ground Water

extraction, following assumption has been considered.

Since the total water available (consumed) by different sector had to be

bifurcated based on their source of origin (Surface/ Ground), proportion of

number of ground water and surface water sources have been taken as the basis

for bifurcation of total volume of water.

4%

94%

1%

1%

0%

Water demand in MCM for 2015

Domestic

Crop

Livestock

Industrial

Power

Page 52: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

50 | P a g e

Table 24: Water BudgetFig. in Lakhs

Name of Existing water availability (MCM)

Total Water Demand (MCM) Water Gap (MCM)

Blocks Surface water

Ground water

(MCM) Present Projected (2020)

Present Projected (2020)

VERAVAL 37.85 66.55 104.40 425.88 429.02 321.48 324.62

SUTRAPADA 8.62 36.13 44.75 204.02 205.00 159.27 160.25

TALALA 41.79 110.53 152.32 441.04 441.85 288.73 289.53

KODINAR 41.70 117.3 159.00 227.72 229.26 68.72 70.26

UNA 34.78 146.55 181.33 364.37 366.00 183.04 184.67

GIR GADHADA 46.15 46.15 5.36 6.07 -40.79 -40.08

Total 210.89 477.06 687.95 1668.39 1677.20 980.45 989.25

The total water gap for the district has been estimated at 989.25 MCM during 2020. The

gap is maximum in Veraval with 324.62 MCM followed by Talala (289.53 MCM).

-100.00

0.00

100.00

200.00

300.00

400.00

500.00

VERAVAL SUTRAPADA TALALA KODINAR UNA GIR GADHADA

Water Budget for Gir Somnath District

Present Water Demand 2015 Projected Water Demand (2020)

Present Water Demand 2015 Projected Water Gap (2020)

Page 53: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

51 | P a g e

CHAPTER 5. STRATEGIC ACTION PLAN FOR IRRIGATION IN DISTRICT UNDER PMKSY

5.1 Strategic Plan for irrigation in PMKSY

A strategic plan for four years has been prepared starting from 2016-17 to 2019-20.The data from water agencies, government

departments and organizationshave been collated and provided in the following table taluka wise:

Table 25: Department wise Planned Coverage of Area under PMKSYFig. in Lakhs Sr. No

Name of the Blocks/Sub

Districts

Concerned Ministry/

Department

Component

Activity Area (Ha)

Estimated cost

(in Lacs.)

2016-17

Area (Ha)

Estimated cost

(in Lacs.)

2017-18

Area (Ha)

Estimated cost (in

Lacs.) 2018-19

Area (Ha)

Estimated cost (in

Lacs.) 2019-20

Area (Ha)

Total Cost

1 Talala GGRC Per drop more crop

Non DPAP Drip &

Sprinkler

1867.89 747.16 1400.92 560.37 1400.92 560.37 1400.92 560.37 6070.65 2428.26

Watershed Dept.

PMKSY Watershed

Check dam,

percolation tanks,

farm ponds etc.

4014.5 1456.69 40.50 280.24 0 0 0 0 4055.00 1736.93

GWRDC Har Khet ko Pani

Recharge Structure

5 10.00 5 10.00 5 10.00 5 10.00 20.00 40.00

ATMA Training and capacity building

2.94 0 4.70 5.66 7.02 0.00 20.32

State

Irrigatipn Dept

AIBP 10071.00 5000 10071.00 5000.00

Har Khet ko Pani

34.00 29.00 252.00 512.00 140.00 229.00 55.00 126.00 481.00 896.00

Gujarat State Land

Development Corp (GLDC)

Har Khet ko Pani

Farm pond 31.68 24.64 31.68 24.64 31.68 24.64 31.68 24.64 126.72 98.56

Sim pond 21 25.00 21.00 25.00 21 25.00 21 25.00 84.00 100.00

Village pond

57.6 14.00 57.60 14.00 57.6 14.00 57.6 14.00 230.40 56.00

WHS 48 8.96 48.00 8.96 48 8.96 48 8.96 192.00 35.84

Total 6079.67 2318.39 1856.70 1439.91 1704.20 877.63 11690.20 5775.99 21330.77 10411.91

2 Verawal GGRC Per drop more crop

Non DPAP Drip &

Sprinkler

1677.42 670.97 1258.06 503.23 1258.06 503.23 1258.06 503.23 5451.61 2180.64

Page 54: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

52 | P a g e

ATMA Training and capacity building

2.94 4.7 5.66 7.02 0.00 20.32

State Irrigatipn

Dept

AIBP 10066.00 5000 10066.00 5000.00

Har Khet ko Pani

104 172.00 2001.00 5106 943 6577 400 3714 3448.00 15569.00

Gujarat State Land

Development Corp (GLDC)

Har Khet ko Pani

Farm pond 25.92 20.16 25.92 20.16 25.92 20.16 25.92 20.16 103.68 80.64

Sim pond 12.6 15.00 12.60 15 12.6 15 12.6 15 50.40 60.00

Village pond

57.6 14.00 57.60 14 57.6 14 57.6 14 230.40 56.00

WHS 48 8.96 48.00 8.96 48 8.96 48 8.96 192.00 35.84

Total 1925.54 904.53 3403.18 5672.05 2345.18 7144.01 11868.18 9282.37 19542.09

23002.44

3 Sutrapada GGRC Per drop more crop

Non DPAP Drip &

Sprinkler

963.50 385.40 722.63 289.05 722.63 289.05 722.63 289.05 3131.38 1252.55

GWRDC Har Khet ko Pani

Recharge Structure

5.00 10.00 5.00 10.00 5.00 10.00 5.00 10.00 20.00 40.00

ATMA Training and capacity building

2.94 4.7 5.66 7.02 0.00 20.32

State Irrigatipn

Dept

AIBP 8056.00 4000 8056.00 4000.00

Har Khet ko Pani

21 24 101 106 28 27 1154 914 1304.00 1071.00

Gujarat State Land

Development Corp (GLDC)

Har Khet ko Pani

Farm pond 23.04 17.92 23.04 17.92 23.04 17.92 23.04 17.92 92.16 71.68

Sim pond 21 25.00 21.00 25 21 25 21 25 84.00 100.00

Village pond

57.6 14.00 57.60 14 57.6 14 57.6 14 230.40 56.00

WHS 48 8.96 48.00 8.96 48 8.96 48 8.96 192.00 35.84

Total 1139.14 488.22 978.27 475.63 905.27 397.59 10087.27 5285.95 13109.34 6647.39

4 Una GGRC Per drop more crop

Non DPAP Drip &

Sprinkler

1969.67 787.87 1477.26 590.90 1477.26 590.90 1477.26 590.90 6401.44 2560.58

Page 55: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

53 | P a g e

Watershed Dept.

PMKSY Component,

PMKSY Component

(Renovated), Convergence

with MGNREGA

Check dam,

percolation tanks,

farm ponds etc.

557.5 1006.76 154.00 105.63 711.50 1112.39

GWRDC Har Khet ko Pani

Recharge Structure

5 10.00 5 10.00 5 10.00 5 10.00 20.00 40.00

ATMA Training and capacity building

2.94 4.7 5.66 7.02 0.00 20.32

State Irrigatipn

Dept

AIBP 20142.00 10000 20142.00 10000.00 Har Khet ko

Pani 249.00 260.00 2711.00 2971.00 3027.00 3624.00 3376.00 4972.00 9363.00 11827.00

Gujarat State Land

Development Corp (GLDC)

Har Khet ko Pani

Farm pond 25.92 20.16 25.92 20.16 25.92 20.16 25.92 20.16 103.68 80.64

Sim pond 12.60 15.00 12.60 15 12.6 15 12.6 15 50.40 60.00

Village pond

57.60 14.00 57.60 14 57.6 14 57.6 14 230.40 56.00

WHS 48.00 8.96 48.00 8.96 48.00 8.96 48.00 8.96 192.00 35.84

Total 2925.29 2125.69 4491.38 3740.35 4653.38 4288.68 25144.38 15638.04 37214.42 25792.77

5 Kodinar GGRC Per drop more crop

Non DPAP Drip &

Sprinkler

2134.94 853.98 1601.21 640.48 1601.21 640.48 1601.21 640.48 6938.56 2775.42

GWRDC Har Khet ko Pani

Recharge Structure

5.00 10.00 5.00 10.00 5.00 10.00 5.00 10.00 20.00 40.00

ATMA Training and capacity building

2.94 4.7 5.66 7.02 0.00 20.32

State Irrigatipn

Dept.

Har Khet ko Pani

1720 382 2602 1532.5 1814 1870.00 2163.00 2143.5 8299.00 11928.00

AIBP Medium Irrigation

1208.00 6000 1208.00 6000.00

Gujarat State Land

Development Corp (GLDC)

Har Khet ko Pani

Farm pond 30.24 23.52 30.24 23.52 30.24 23.52 30.24 23.52 120.96 94.08

Sim pond 16.8 20.00 16.80 20 16.8 20 16.8 20 67.20 80.00

Village pond

86.4 21.00 86.40 21 86.4 21 86.4 21 345.60 84.00

WHS 36 6.72 36.00 6.72 36 6.72 36 6.72 144.00 26.88

Total 4029.38 1320.16 4377.65 2258.92 2597.38 2597.38 5146.65 14872.24 17143.92 15048.70

6 Gir Gadhada

GGRC Per drop more crop

Non DPAP Drip

250.51 100.20 187.88 75.15 187.88 75.15 187.88 75.15 814.16 325.66

Page 56: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

54 | P a g e

&Sprinkler

GWRDC Har Khet ko Pani

Recharge Structure

5.00 10.00 5.00 10.00 5.00 10.00 5.00 10.00 20.00 40.00

ATMA Training and capacity building

2.94 4.7 5.66 7.02 0.00 20.32

State

Irrigatipn Dept

AIBP 0.00 0.00

Har Khet ko Pani

43 90 788 1499 1024 1890.00 944.00 1720 2799.00 5199.00

Gujarat State Land

Development Corp (GLDC)

Har Khet ko

Pani

Farm pond 28.8 22.40 28.80 22.4 28.8 22.4 28.8 22.4 115.20 89.60

Sim pond 16.8 20.00 16.80 20 16.8 20 16.8 20 67.20 80.00

Village pond

86.4 21.00 86.40 21 86.4 21 86.4 21 345.60 84.00

WHS 42 7.84 42.00 7.84 42 7.84 42 7.84 168.00 31.36

Total

472.51 274.38 1154.88 1660.09 1390.88 2052.05 1310.88 1883.41 4329.16 5869.94

Note: The other component in both the districts for the year 2016-17 and 2017-18 is divided equally among the 2 blocks i.e. Una and Talala, as it was practically

not possible to allocate the exact amount of funds allocated for the 2 blocks.

PMKSY-Watershed Component (erstwhile named as Integrated Watershed Management Programme) is one of the flagship program of Govt. of India. The main objectives of this is to restore the ecological balance by harnessing, conserving and developing degraded natural resources such as soil, vegetative cover and water. Gujarat is one of the largest States in context of land area treatment under PMKSY-Watershed project. The important activities carried out under this projects are Soil moisture conservation, Water harvesting, Vegetative cover and Plantation, Agricultural production and Productivity improvement, Dairy development, Agro processing, Livelihood and Income Generating Activities etc. In Gujarat PMKSY-Watershed component is implemented through a State Level Nodal Agency constituted as Gujarat State Watershed Management Agency (GSWMA), an autonomous society supported under the Rural Development Department (RDD) of Government of Gujarat. GSWMA has vision of “Enhancing the quality of rural population through Sustainable, Equitable and Participatory Natural resources Management” and also has Mission of “Creating sustainable rural livelihoods through scientific and Integrated Watershed Development Approach”.

Page 57: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

55 | P a g e

5.2 Component wise Strategic Action Plan

Out of a total planned outlay of 86,773.16lakh rupees, Har Khet ko Pani component has the largest

share of 49 per cent, followed by AIBP (35%) and Per Drop More Crop (13%). PMKSY Watershed

component has a MINIMUM share in the total outlay. AIBP components are to be executed mainly

by Narmada, Water Resources, Water Supply and Kalpsar Department (WRD). Har Khet ko Pani

component will be implemented by WRD, SSNNL and GWRDC. Per drop, more crop component

will be executed by GGRC. Watershed component will be taken care of by the Rural Development

Department through GSWMA and extension & training component will be executed by ATMA.

However, all the stakeholders need to have coordination among themselves to have the maximum

irrigation efficiency and to avoid duplicity. Fig. 5.2 is the graphical representation of various

components of PMKSY.

Table 26: Component wise Financial Outlay for PMKSYFig. in Lakhs

Component 2016-17 2017-18 2018-19 2019-20 Total

Per drop more crop 3545.57 2659.18 2659.18 2659.18 11523.12

PMKSY Watershed 2421.74 367.17 00 00 2788.90

MGNREGA 43.71 18.70 00 00 62.41

Har Khet Ko Pani 1404.20 12173.70 14664.20 14036.70 42278.80

Training and Capacity Building 17.64 28.20 33.96 42.12 121.92

AIBP 0.00 0.00 0.00 30000.00 30000.00

Total 7430.86 15246.95 17357.34 46738.00 86773.16

5.3 Department wise &Year wise Strategic Action Plan Year wise financial outlay for the four years can be observed in Fig.5.2. In the first year of

implementation, i.e. in financial year 2016-17, a budget of Rs. 7430.86 lakh is required. In the

subsequent three years, Rs.15,246.95 lakh, Rs.17357.34 lakh and Rs.46738.00 lakh budget is

estimated for various departments. Year wise financial outlay is illustrated in the following table.

Table 27: Total amount to be spent by various agencies under PMKSY for four yearsFig. in Lakhs

Agency 2016-17 2017-18 2018-19 2019-20 Total

GGRC 3545.57 2659.18 2659.18 2659.18 11523.12

GSWMA (PMKSY Watershed +

2465.45 385.87 0.00 0.00 2849.32

13%

3%

49%0%

35%

Components of PMKSY

Per drop more crop

PMKSY Watershed

Har Khet Ko Pani

Training and Capacity Building

AIBP

Page 58: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

56 | P a g e

MGNREGA)

GWRDC 50.00 50.00 50.00 50.00 200.00

ATMA 17.64 28.20 33.96 42.12 121.92

WRD 957.00 11726.50 14217.00 43589.50 70490.00

GLDC 397.20 397.20 397.20 397.20 1588.80

Total 7430.86 15246.95 17357.34 46738.00 86773.16

Table 28: Total area to be covered under PMKSY

Agency Estimated Area

to be Covered

under PMKSY

(ha.)

Proposed

Additional area

brought under

irrigation

GGRC 28807.8 NA

PMKSY Watershed 4766.5 4766.5

GWRDC 100 100

WRD 75237 7667

GLDC 3758.4 3758.4

Total 112669.7 16291.9

As can be seen from the above table 27 and table 28, an area of 112699.7 Ha will be covered and

total funds of Rs.86,773will be required to spend for four years under PMSKY.

5.4 Monitoring and Evaluation

The Strategic Action Plan of PMKSY will be monitored by the respective departments

through the regular reporting system and component wise progress will be monitored by

the District Level Irrigation Committee. Further, the activities, outputs and outcomes will

be reported in web based MIS of PMKSY for review at state and national level. Some of the

key indicators that will be used to monitor and evaluate the progress of PMKSY include:

Annual irrigation water supply per unit irrigated area measured as the ratio of total

volume of irrigation water supplied at intake divided by total area irrigated in all

seasons

Potential created and utilized measured as the ratio of total potential utilised

(measured crop area) to irrigation potential created

Output (agricultural production) per unit irrigated area measured as the ratio of

total value of agriculture production divided by the total irrigated area.

Output (agricultural production) per unit irrigation water supply measured as the

ratio of total value of agriculture production divided by the total volume of irrigated

water supplied.

Total Operations & Maintenance (O&M) cost per unit irrigated area measured as

the total Management, Operation and Maintenance (MOM) costs for the system

divided by total area irrigated (potential utilised).

Total Operations & Maintenance (O&M) cost per unit volume of water supplied

measured as total Management, Operation and Maintenance (MOM) costs for the

system divided Total volume of water supplied (all uses)

Page 59: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

57 | P a g e

Equity performance measured as actual area irrigated in head, middle and tail

divided by Command area in head, middle and tail.

GSWMA has its own structural arrangements (GSWMA, District Watershed

Development Unit, PIA, and Watershed Committee) from state to village level for

implementation of program and has system of internal monitoring of project activities

through different means. GSWMA has its own web based monitoring system as Soil

Water Resource Management System (SWaRSys). The said system is online and helps

not only for the monitoring/documentation of all the main project activities but also

facilitates to collect and collate monthly and quarterly data from District level

offices.For preparation of DIP, the watershed component information is collected from

various levels and incorporated in this document for the years 2016-20.

5.5 Expected outcome and income

At present, a total of 112669.70 ha of area under crops is unirrigated in the district. Out of

which, under PMKSY it is proposed to cover an additional area of 83861.90 ha under

irrigation during the upcoming four years. This will save not only significant amount of

water but also a significantly larger area can be irrigated with limited quantity of water.

Similarly under Per Drop More Crop component, Gujarat Green Revolution Company Ltd

(GGRC) will cover 28,807.80 ha.This will save a significant amount of water as

comparison traditional method of irrigation. Hence, significantly larger area can be

irrigated with limited quantity of water.

The PMKSY interventions are likely to generate an additional income of Rs. 21,133.20 lakh

to the farmers of the district. This is based on the assumption of at least 60% of potential

utilised and Rs. 42,000 per ha incremental income from rainfed to irrigated farming.

This is also likely to create 132lakh man-days of non-recurring employment. The total

man-days after calculation come 13195079. All this generates total number of individuals

who will be employed for 4 years under the project: 13641.

5.6 Suggestions

For successful implementation of PMKSY plan it is suggested that:

All the stakeholders should convene meeting of Panchayat Samities and then finalize

the village plan and prepare DPR.

There should not be any duplicity of project.

The Department should supplement each other so that the maximum irrigation

efficiency is achieved.

Agriculture and Horticulture Department should take micro irrigation projects in the

command of minor irrigation projects, which are either completed or likely to be

completed in near future.

All the irrigation projects should have a component of water conveyance so that the

each drop of water is judiciously utilized.

Where ever feasible, Solarpump sets should be installed.

Page 60: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

58 | P a g e

All the structures planned should be geo tagged and marked on map, so that social

monitoring of the projects can be conducted. This will also avoid the duplicity.

Priority should be given to projects to minimize the gap in potential created and

potential utilized.

Execution of the scheme should be expeditiously completed.

There should be smooth fund flow for timely completion of the project and to avoid

cost escalation.

Strategic Action plan for Irrigation in District under PMKSY

Concerned Ministry/

Department Component Activity

Total Number/Capacity

(cum )

Command Area/

additional area

lrrigation Potential

(Ha)

Period of

Implementation^/ 7

yrs)

Estimated cost (in

lakh Rs.)

MoWR AIBP Minor Irrigation WRD 5 92805 4 Years 30000

MoWR

Har khet ko pani

Surface Minor Irrigation

MoWR Line Filed Channels WRD 5 16788 4 Years 286

Check Dams WRD 104 20674 4 Years 21108

MoWR Other Works WRD 255 22611 4 Years 19096

Recharge Tubewell GWRDC 20 100 4 Years 200

MoWR Farm pond GLDC 460 662.4 4 Years 515

MoWR Sim pond GLDC 96 403.2 4 Years 480

MoWR Village pond GLDC 56 1612.8 4 Years 392

MoWR WHS GLDC 180 1080 4 Years 202

MoWR Per drop more crop

(Micro Irrigation)

Micro Irrigation

MoWR Non -DPAP Drip 10803 17284.68 4 Years 10371

MoWR Non -DPAP Sprinkler 7202 11523.12 4 Years 1152

DoLR-MoRD

PMKSY Watershed

Existing/Old Water Harvesting Structure

Maintance (Renovation & Repair)

219 1123 4 Years 257

DoLR-MoRD Ground Water Recharging Structures

11 35 4 Years 5

DoLR-MoRD Admin 0 0 4 Years 105

DoLR-MoRD AGRICULTURE ACTIVITIES 3564 40 4 Years 656

DoLR-MoRD AGRO PROCESSING ACTIVITIES

60 1 4 Years 103

DoLR-MoRD Animal Husbandry 960 6 4 Years 108

DoLR-MoRD Capacity Building, Monitoring & Evaluation

0 0 4 Years 55

DoLR-MoRD Consolidation 0 0 4 Years 59

DoLR-MoRD Dugwell Recharge structure 9 0 4 Years 2

DoLR-MoRD EPA 3003 0 4 Years 9

DoLR-MoRD Establishing linkages 4 0 4 Years 9

DoLR-MoRD Holiya in farm/Field 85 0 4 Years 41

DoLR-MoRD Land Development 30884.8 16190 4 Years 330

DoLR-MoRD Local traditional handicraft 2 0 4 Years 2

Page 61: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

59 | P a g e

DoLR-MoRD Minor Activities 76 2 4 Years 108

DoLR-MoRD Pond Recharge structure 97 0 4 Years 40

DoLR-MoRD Soil & Moisture Conservation 34584 4335 4 Years 283

DoLR-MoRD Water Harvesting Structure 1016 1168.5 4 Years 615

DoLR-MoRD Convergence with

MGNREGA Multiple activities

4 Years 62

Irrigation Scheme of State

Agriculture

Capacity Building by

ATMA Training Programmes

1494 trainings

18012 trainees

4 Years 122

Page 62: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

60 | P a g e

ANNEXURE

Annexure-1- Department wise Summary of Strategic Action Plan

1. Strategic Action Plan of Water Resource Department (WRD) Fig. in Lakhs

Component

Activity

2016-17 2017-18 2018-19

2019-20

TOTAL

Fund (lacs.)

Fund (lacs.)

Fund (lacs.)

Fund (lacs.)

Additional irrigation

Area (hac.)

AIBP Kalpsar Yojna 0 0 0 30000 49543

Hark het ko pani

Lined Field Channels 24 132.5 63 36.5 478

Drought Proofing through check

0 0 0 0 0

Dams/Water Harvesting Structures

466 4072 4601 7095 19434

Other Works (Desilting, Deepning,Repairing,RRR)

377 6023 7663 4738 5782

Total 867 10228 12327 41870 75237

2. Strategic Action Plan for Gujarat Water Resource Development Corporation (GWRDC)Fig. in Lakhs

GWRDC

Components Work Blocks 2016-17 2017-18 2018-19 2019-20 Total Command Area

HKP Recharge Structure

Kodinar 10 10 10 10 40 20

Patan Veraval

10 10 10 10 40 20

Sutrapada 10 10 10 10 40 20

Talala 10 10 10 10 40 20

Una 10 10 10 10 40 20

Total 50 50 50 50 200 100

3. Strategic Action Plan for Gujarat State Land Development Corporation Limited (GLDC) Fig. in Lakhs

Total Activity Estimated cost (in

Lacs.) 2016-17

Estimated cost (in

Lacs.) 2017-18

Estimated cost (in Lacs.)

2018-19

Estimated cost (in Lacs.)

2019-20

Total Area (Ha)

Total estimated

cost (in Lacs.)

Gujarat State Land

Development Corp (GLDC)

Farm pond

128.8 128.8 128.8 128.8 662.4 515.2

Sim pond

120 120 120 120 403.2 480

Village pond

98 98 98 98 1612.8 392

WHS 50.4 50.4 50.4 50.4 1080 201.6

Page 63: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

61 | P a g e

4. Strategic Action Plan for Gujarat Green Revolution Company Limited (GGRC) Fig. in Lakhs

GGRC

Components Work 2016-17 2017-18 2018-19 2019-20 Total Command Area

Per Drop More Crop

Drip 3191.02 2393.26 2393.26 2393.26 10370.8 17284.67

Sprinkler 354.56 265.92 265.92 265.92 1152.32 11523.11

Total 3545.58 2659.18 2659.18 2659.18 11523.12 28807.78

5. Strategic Action Plan for Gujarat State Watershed Management Agency (GSWMA)Fig. in Lakhs

GSWMA

Components 2016-17 2017-18 2018-19 2019-20 Total Command Area

PMKSY Watershed 2421.7 367.17 0 0 2788.91 4766.5

MGNREGA 41.71 0 0 0 41.71 0

Total 2463 367.17 0 0 2830.62 4766.5

6. Strategic Action Plan for Agriculture Technology Management Agency (ATMA) Fig. in Lakhs

Components Work 2016-17 2017-18 2018-19 2019-20 Total

Capacity Building

Training related to irrigation

17.62 28.19 33.98 42.14 121.92

Page 64: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

62 | P a g e

Annexure-2 Strategic Action Plan of Water Resource Department

Sr.

No

Name of the

Blocks/Sub

Districts

Concerned

Ministry/

Department

Component

Activity Total Total Comm

and Area/

lrrigation

Potential

(Ha)

Existing

irrigation

Area (hac.)

2016-17 2017-18 2018-19 2019-20 TOTAL

Number/Capacity(cum )

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

7 GIR SOMNA

TH

MoWR AIBP Kalpsar Yojna 1 13450 0 0 0 0 0 0 0 8056 4000

8056 4000

7.1

MoWR Hark het ko pani

Lined Field Channels

0 0 0 0

10 MoWR Drought Proofing through check

6 1561 0 0

MoWR Dams/Water

Harvesting

Structures

0 19 21 70 81 0 0 1137 900 1226 1002

11 MoWR Secondary

Storage Structures

(Tank)

0 0 0 0

MoWR 0 0

17

.5 MoWR Other Works

(Desilting,

Deepning,Repairing,RRR)

26 298 220 2 3 31 25 28 27 17 14 78 69

TOTAL 21 24 101 106 28 27 9210 4914 9360 5071

Name of the Block: KODINAR

Sr.

No

Name of the

Blocks/Sub

Districts

Concerned

Ministry/

Department

Component

Activity Total Total Comma

nd Area/

lrrigation

Potential (Ha)

Existing

irrigation

Area (hac.)

2016-17 2017-18 2018-19 2019-20 TOTAL

Number/Capacity(cum )

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

7 GIR SOMNA

TH

MoWR AIBP Kalpsar Yojna 1 2435 0 0 0 0 0 0 0 1208 6000

1208 6000

7. MoWR Hark het Lined Field 1 6800 6500 14 4 96 27.5 63 18 127 36.50 300 86

Page 65: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

63 | P a g e

1 ko pani Channels 0

10 MoWR Drought Proofing through check

21 6259 0 0

MoWR Dams/Water

Harvesting

Structures

0 1659 300 2434 1375 1137 1555 989 1685 6219 4915

11 MoWR Secondary

Storage Structures

(Tank)

0 0 0 0

MoWR 0 0

17

.5 MoWR Other Works

(Desilting,

Deepning,Repairi

ng,RRR)

34 1970 190 47 78 72 130 614 297 1047 422 1780 927

TOTAL 1720 382 2602 1533 1814 1870 3371 8144 9507 1192

8

Name of the Block: UNA

Sr.

No

Name of the

Blocks/Sub

Districts

Concerned

Ministry/

Department

Component

Activity Total Total Comma

nd Area/

lrrigation

Potential (Ha)

Existing

irrigation

Area (hac.)

2016-17 2017-18 2018-19 2019-20 TOTAL

Number/Capacity(cum )

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

7 GIR SOMNA

TH

MoWR AIBP Kalpsar Yojna 1 41921 0 0 0 0 0 0 0 20142 10000

20142 10000

7.1

MoWR Hark het ko pani

Lined Field Channels

1 193 150 3 5 40 0 0 0 0 0 43 5

10 MoWR Drought Proofing

through check

30 8341 0 0

MoWR Dams/Water

Harvesting Structures

0 127 132 2074 2275 2362 2771 2942 4400 7505 9578

11 MoWR Secondary

Storage Structures (Tank)

0 0 0 0

MoWR 0 0

17

.5 MoWR Other Works

(Desilting,

Deepning,Repairing,RRR)

57 12081 10266 119 123 597 696 665 853 434 572 1815 2244

TOTAL 249 260 2711 2971 3027 3624 23518 1497

2

29505 2182

7

Name of the Block: GIR GADHADA

Sr Name of Concern Compon Activity Total Total Existin 2016-17 2017-18 2018-19 2019-20 TOTAL

Page 66: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

64 | P a g e

. No

the Blocks/

Sub Districts

ed Ministry

/ Departm

ent

ent Number/Capacity(cum )

Command

Area/ lrrigati

on Potential (Ha)

g irrigati

on Area (hac.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

7 GIR SOMNA

TH

MoWR AIBP -

7.1

MoWR Hark het ko pani

Lined Field Channels

1 170 150 0 0 13 20 7 10 0 0 20 30

10 MoWR Drought Proofing

through check

20 2709 0 0

MoWR Dams/Water

Harvesting Structures

0 35 67 733 1361 989 1796 922 1650 2679 4874

11 MoWR Secondary

Storage Structures (Tank)

0 0 0 0

MoWR 0 0

17

.5 MoWR Other Works

(Desilting, Deepning,Repairi

ng,RRR)

23 640 540 8 23 42 118 28 84 22 70 100 295

TOTAL 43 90 788 1499 1024 1890 944 1720 2799 5199

Name of the Block: VERAVAL

Sr.

No

Name of the

Blocks/Sub

Districts

Concerned

Ministry/

Department

Component

Activity Total Total Comma

nd Area/

lrrigation

Potential (Ha)

Existing

irrigation

Area (hac.)

2016-17 2017-18 2018-19 2019-20 TOTAL

Number/Capacity(cum )

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

7 GIR SOMNA

TH

MoWR AIBP Kalpsar Yojna 1 15743 0 0 0 0 0 0 0 10066 5000

10066 5000

7.1

MoWR Hark het ko pani

Lined Field Channels

1 9600 9510 6 10 57 95 27 45 0 0 90 150

10 MoWR Drought Proofing

through check

21 1738 0 0

MoWR Dams/Water

Harvesting Structures

0 7 10 731 291 700 245 300 100 1738 646

11 MoWR Secondary

Storage Structures (Tank)

0 0 0 0

MoWR 0 0

Page 67: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

65 | P a g e

17

.5 MoWR Other Works

(Desilting,

Deepning,Repairing,RRR)

48 2050 430 91 152 1213 4720 216 6287 100 3614 1620 14773

Total 104 172 2001 5106 943 6577 10466 8714 13514 2056

9

Name of the Block: TALALA

Sr.

No

Name of the

Blocks/Sub

Districts

Concerned

Ministry/

Department

Component

Activity Total Total Comma

nd Area/

lrrigation

Potential (Ha)

Existing

irrigation

Area (hac.)

2016-17 2017-18 2018-19 2019-20 TOTAL

Number/Capacity(cum )

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

Additional

irrigation

Area (hac.)

Fund

(lacs.)

7 GIR SOMNA

TH

MoWR AIBP Kalpsar Yojna 1 19256 0 0 0 0 0 0 0 10071 5000

10071 5000

7.1

MoWR Hark het ko pani

Lined Field Channels

1 25 0 8 5 17 10 0 0 0 0 25 15

10 MoWR Drought Proofing

through check

6 66 0 0

MoWR Dams/Water Harvesting

Structures

0 2 3 37 50 21 30 7 10 67 93

11 MoWR Secondary

Storage Structures (Tank)

0 0 0 0

MoWR 0 0

17

.5 MoWR Other Works

(Desilting, Deepning,Repairi

ng,RRR)

67 5572 5183 24 21 198 452 119 199 48 116 389 788

TOTAL 75 24919 5183 34 29 252 512 140 229 10126 5126 10552 5896

Annexure-3 – Strategic Action Plan of GWRDCFig. in Lakhs

Gir Somnath

Taluka Concerned Ministry/ Department

Component Activity Period of Implementation 5 / 7 yrs)

Total Number/Capacity(cum

)

Total Command Area/ lrrigation Potential

(Ha)

Estimated cost (in Rs.)(LacS)

Kodinar MoWR Har Khet ko Pani

Recharge Structure

5 Years 5 25 50

Patan MoWR Har Khet ko Recharge 5 Years 5 25 50

Page 68: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

66 | P a g e

Veraval Pani Structure

Sutrapada

MoWR Har Khet ko Pani

Recharge Structure

5 Years 5 25 50

Talala MoWR Har Khet ko Pani

Recharge Structure

5 Years 5 25 50

Una MoWR Har Khet ko Pani

Recharge Structure

5 Years 5 25 50

Annexure-4 – Strategic Action Plan of GLDC Fig. in Lakhs

Blocks Component Area (Ha)

Estimated cost (in Lacs.)

2016-17

Area (Ha)

Estimated cost (in Lacs.)

2017-18

Area (Ha)

Estimated cost (in Lacs.)

2018-19

Area (Ha)

Estimated cost (in Lacs.)

2019-20

Total Area (Ha)

Total estimated

cost (in Lacs.)

Talala Farm pond 31.68 24.64 31.68 24.64 31.68 24.64 31.68 24.64 126.72 98.56

Sim pond 21 25 21 25 21 25 21 25 84 100

Village pond 57.6 14 57.6 14 57.6 14 57.6 14 230.4 56

WHS 48 8.96 48 8.96 48 8.96 48 8.96 192 35.84

Total 72.6 158.28 72.6 158.28 72.6 158.28 72.6 633.1 290.4

Veraval Farm pond 25.92 20.16 25.92 20.16 25.92 20.16 25.92 20.16 103.68 80.64

Sim pond 12.6 15 12.6 15 12.6 15 12.6 15 50.4 60

Village pond 57.6 14 57.6 14 57.6 14 57.6 14 230.4 56

WHS 48 8.96 48 8.96 48 8.96 48 8.96 192 35.84 Total 58.12 144.12 58.12 144.12 58.12 144.12 58.12 576.5 232.48

Sutrapada Farm pond 23.04 17.92 23.04 17.92 23.04 17.92 23.04 17.92 92.16 71.68

Sim pond 21 25 21 25 21 25 21 25 84 100 Village pond 57.6 14 57.6 14 57.6 14 57.6 14 230.4 56

WHS 48 8.96 48 8.96 48 8.96 48 8.96 192 35.84

Total 65.88 149.64 65.88 149.64 65.88 149.64 65.88 598.6 263.52

Page 69: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

67 | P a g e

Una Farm pond 25.92 20.16 25.92 20.16 25.92 20.16 25.92 20.16 103.68 80.64

Sim pond 12.6 15 12.6 15 12.6 15 12.6 15 50.4 60

Village pond 57.6 14 57.6 14 57.6 14 57.6 14 230.4 56

WHS 48 8.96 48 8.96 48 8.96 48 8.96 192 35.84

Total 58.12 144.12 58.12 144.12 58.12 144.12 58.12 576.5 232.48

Kodinar Farm pond 30.24 23.52 30.24 23.52 30.24 23.52 30.24 23.52 120.96 94.08

Sim pond 16.8 20 16.8 20 16.8 20 16.8 20 67.2 80 Village pond 86.4 21 86.4 21 86.4 21 86.4 21 345.6 84

WHS 36 6.72 36 6.72 36 6.72 36 6.72 144 26.88

Total 71.24 169.44 71.24 169.44 71.24 169.44 71.24 677.8 284.96

Gir Gadhada

Farm pond 28.8 22.4 28.8 22.4 28.8 22.4 28.8 22.4 115.2 89.6

Sim pond 16.8 20 16.8 20 16.8 20 16.8 20 67.2 80 Village pond 86.4 21 86.4 21 86.4 21 86.4 21 345.6 84

WHS 42 7.84 42 7.84 42 7.84 42 7.84 168 31.36 Total 71.24 174 71.24 174 71.24 174 71.24 696 284.96

Annexure-5 – Strategic Action Plan of GGRCFig. in Lakhs

Target for 2019-20 Total Drip Irrigation System Sprinkle Irrigation System

Sr. No. District Block No of Farmers

Area (Ha)

Estimated Total Cost

Estimated Assistance

No of Farm

ers

Area (Ha)

Estimated

Total Cost

Estimared

Assistance

No of Farme

rs

Area (Ha)

Estimated Total Cost

Estimared

Assistance

1 GIR SOMNATH GIR GADHADA

117 187.88 150.31 75.15 70 112.73 135.28 67.64 47 75.15 15.03 7.52

Page 70: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

68 | P a g e

Kodinar 1001 1601.21 1280.96 640.48 600 960.72 1152.87 576.43 400 640.48 128.10 64.05

Sutrapada 452 722.63 578.10 289.05 271 433.58 520.29 260.15 181 289.05 57.81 28.91

Talala 876 1400.92 1120.74 560.37 525 840.55 1008.66 504.33 350 560.37 112.07 56.04

Una 923 1477.26 1181.80 590.90 554 886.35 1063.62 531.81 369 590.90 118.18 59.09

Veraval 786 1258.06 1006.45 503.23 472 754.84 905.81 452.90 315 503.23 100.65 50.32

TOTAL 4155 6647.95 5318.36 2659.18 2493 3988.77

4786.53

2393.26

1662 2659.18

531.84

265.92

Target for 2018-19 18-19

2 GIR SOMNATH GIR GADHADA

117 187.88 150.31 75.15 70 112.73 135.28 67.64 47 75.15 15.03 7.52

Kodinar 1001 1601.21 1280.96 640.48 600 960.72 1152.87 576.43 400 640.48 128.10 64.05

Sutrapada 452 722.63 578.10 289.05 271 433.58 520.29 260.15 181 289.05 57.81 28.91

Talala 876 1400.92 1120.74 560.37 525 840.55 1008.66 504.33 350 560.37 112.07 56.04

Una 923 1477.26 1181.80 590.90 554 886.35 1063.62 531.81 369 590.90 118.18 59.09

Veraval 786 1258.06 1006.45 503.23 472 754.84 905.81 452.90 315 503.23 100.65 50.32

TOTAL 4155 6647.95 5318.36 2659.18 2493 3988.77

4786.53

2393.26

1662 2659.18

531.84

265.92

Target for 2017-18 17-18

3 GIR SOMNATH GIR GADHADA

117 187.88 150.31 75.15 70 112.73 135.28 67.64 47 75.15 15.03 7.52

Kodinar 1001 1601.21 1280.96 640.48 600 960.72 1152.87 576.43 400 640.48 128.10 64.05

Sutrapada 452 722.63 578.10 289.05 271 433.58 520.29 260.15 181 289.05 57.81 28.91

Talala 876 1400.92 1120.74 560.37 525 840.55 1008.66 504.33 350 560.37 112.07 56.04

Page 71: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

69 | P a g e

Una 923 1477.26 1181.80 590.90 554 886.35 1063.62 531.81 369 590.90 118.18 59.09

Veraval 786 1258.06 1006.45 503.23 472 754.84 905.81 452.90 315 503.23 100.65 50.32

TOTAL 4155 6647.95 5318.36 2659.18 2493 3988.77

4786.53

2393.26

1662 2659.18

531.84

265.92

Target for 2016-17 16-17

4 GIR SOMNATH GIR GADHADA

157 250.51 200.41 100.20 94 150.31 180.37 90.18 63 100.20 20.04 10.02

Kodinar 1334 2134.94 1707.95 853.98 801 1280.96

1537.16 768.58 534 853.98 170.80 85.40

Sutrapada 602 963.50 770.80 385.40 361 578.10 693.72 346.86 241 385.40 77.08 38.54

Talala 1167 1867.89 1494.31 747.16 700 1120.74

1344.88 672.44 467 747.16 149.43 74.72

Una 1231 1969.67 1575.74 787.87 739 1181.80

1418.17 709.08 492 787.87 157.57 78.79

Veraval 1048 1677.42 1341.93 670.97 629 1006.45

1207.74 603.87 419 670.97 134.19 67.10

TOTAL 5540 8863.94 7091.15 3545.57 3324 5318.36

6382.03

3191.02

2216 3545.57

709.11

354.56

Annexure-6 Strategic Action Plan of GSWMA Fig. in Lakhs

GSWMA PMKSY watershed MGNREGA

Cost Area Cost Area

UNA 1051.98 711.5 41.71 0

TALALA 1736.93 4055 0 0

Page 72: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

70 | P a g e

Sr.No Activity Unit Physical Target for FY (2016-17)

Unit Cost (In

Lakhs) IWMP

Storage Volumes

(Cubic Meter)

Command Area/

Irrigation Potential

(Ha.)

Person days/Manday

s Planned

Convergence

Unit

Amount (In

Lakhs)

Name of Schemes

S.No EPA

1 Animal camp No. 0 0.00 0 0 0 0 0.00 0

2 Animal water trough (Havada)

No. 0 0.28 0 0 0 0 0.00 0

3 Causeway on connecting roads

No. 0 0.02 0 0 0 0 0.00 0

4 Check / Protection wall No. 0 0.08 0 0 0 0 0.00 0

5 Demonstration for Agricultural / Animal Husbandry Productivity Enhancement

No. 0 0.00 0 0 0 0 0.00 0

6 Drainage line correction (To prevent flooding of Gamtal)

rmt 0 0.00 0 0 0 0 0.00 0

7 Drinking water facility No. 1 2.09 0 0 0 0 0.00 0

8 Fencing for protection from wild animals

rmt. 0 0.00 0 0 0 0 0.00 0

9 Grassland/Gauchar Development

Ha. 0 0.00 0 0 0 0 0.00 0

10 Improvised and energy efficient smashan gruh (Cemetery )

No. 0 0.00 0 0 0 0 0.00 0

11 Panchayat Well Repair & Pump Room

No. 0 0.00 0 0 0 0 0.00 0

12 Rain water harvesting system No. 1 0.59 0 0 0 0 0.00 0

13 Recharge / Repair of open wells

No. 1 0.09 0 0 0 0 0.00 0

Page 73: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

71 | P a g e

14 Repair / development of artificial water bodies

No. 0 0.00 0 0 0 0 0.00 0

15 Revival of natural water bodies with recharge activities

No. 0 0.00 0 0 0 0 0.00 0

16 Sanitation facilities/Sewerage line

rmt 0 0.00 0 0 0 0 0.00 0

17 Use solar power for productive activities

No. 0 0.00 0 0 0 0 0.00 0

18 Wind energy development No. 0 0.00 0 0 0 0 0.00 0

19 OTHERS (Otta at Tree) No. 0 0.00 0 0 0 0 0.00 0

20 OTHERS (Community Washing Stand and ghat)

No. 0 0.00 0 0 0 0 0.00 0

21 OTHERS (Plantation with Tree Guard)

No. 0 0.00 0 0 0 0 0.00 0

22 OTHERS (Cemetery Fencing & Wood Store Room)

No. 0 0.00 0 0 0 0 0.00 0

23 OTHERS (Nala Plug) No. 0 0.02 0 0 0 0 0.00 0

24 OTHERS (Open well cover) No. 0 0.01 0 0 0 0 0.00 0

25 OTHERS (Snan ghat) No. 0 0.00 0 0 0 0 0.00 0

26 OTHERS (well parapet) No. 0 0.00 0 0 0 0 0.00 0

27 OTHERS (Drainage line farm )

RMT 3000 5.60 0 0 0 0 0.00 0

28 OTHERS (Vegetative band) No. 0 0.00 0 0 0 0 0.00 0

S.No Land Development

1 Farm Bunding rmt. 10950

13.09 0 0 0 0 0.00 0

2 Afforestation Ha. 15.3 14.38 0 0 0 0 0.00 0

3 Agriculture Demo No. 0 0.00 0 0 0 0 0.00 0

4 Agro Forestry Ha. 0 0.00 0 0 0 0 0.00 0

5 Horticulture Ha. 0 0.00 0 0 0 0 0.00 0

6 Land leveling Ha. 22 5.28 0 0 0 39 19.50 Forest

Page 74: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

72 | P a g e

7 Pasture development Ha. 50.5 51.50 0 0 0 0 0.00 0

8 OTHERS (Plantation With wire fencing)

Ha. 18300

58.51 0 0 0 0 0.00 0

9 OTHERS (Sprikleer & drip) rmt. 828 97.71 0 0 0 680 69.89 GGRC

10

11

12

S.No Soil & Moisture Conservation

1 Check wall No. 20 17.42 0 0 1664 0 0.00 0

2 Earthen bund No. 8 9.80 320 7 936 0 0.00 0

3 Protection Wall No. 339 74.66 0 0 7130 35 9.80 MGNREGA

4 Waste weir No. 18 8.25 0 0 788 0 0.00 0

5 Bench Terracing cumec

1 1.00 0 0 96 0 0.00 0

6 Bori bandh No. 0 0.00 0 0 0 0 0.00 0

7 Brushwood Checks No. 0 0.00 0 0 0 0 0.00 0

8 Countour Bunding rmt. 10 1.00 0 0 96 0 0.00 0

9 Countour Trenches rmt. 4000 4.60 0 0 439 0 0.00 0

10 Earthern Dam No. 0 0.44 0 0 42 0 0.00 0

11 Field Outlet No. 33 3.30 0 0 315 0 0.00 0

12 Gabion structure No. 20 3.00 0 0 287 0 0.00 0

13 Graded Bunding rmt. 0 0.00 0 0 0 0 0.00 0

14 Gully plug No. 4 0.95 189.136 14 90 0 0.00 0

15 Loose boulder Checks No. 585 34.28 0 0 0 0 0.00 0

16 Nala Plug No. 57 34.09 0 0 3256 0 0.00 0

17 Stone bunding rmt. 2007 15.45 0 0 1476 0 0.00 0

18 Straggred Contour trenching(Terrace Talavadi)

0 0.00 0 0 0 0 0.00 0

19 OTHERS (Drainage line) rmt. 1426 10.92 0 0 812 0 0.00 0

Page 75: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

73 | P a g e

20 OTHERS (Dry Rubble wall with pointing)

rmt. 917 11.00 0 0 0 0 0.00 0

21 OTHERS (well parapet) No. 4 1.12 0 0 80 0 0.00 0

OTHERS (Drainage line farm )

rmt 25100

42.16 0 0 688 0 0.00 0

22 OTHERS (Vegetative band) No. 0 0.00 0 0 0 0 0.00 0

S.No Water Harvesting Structure

1 Cause way cum Chek dam No. 29 142.54 42761.136 130.5 13613 1 2.00 Mla

2 Check dam No. 83 337.01 101102.973

456.5 32186 0 0.00 0

3 Village/Community Pond No. 39 45.48 13644 214.5 4344 1 1.80 MGNREGA

4 Farm Pond No. 63 38.44 11533.188 181.5 3672 4 2.46 Self,mla

5 Percolation Tank No. 5 6.97 2091 22.5 666 0 0.00 MGNREGA

6 Pond Inlet No. 1 3.30 990 4.5 0 0 0.00 GLDC

7 Pond Outlet No. 0 0.00 0 0 0 0 0.00 0

8 OTHERS (Connection Diversion Drainege Line)

rmt 507 4.80 1440 0 458 250 2.00 MGNREGA

9 OTHERS (Paka Plag) rmt 33 28.60 8580 148.5 2731 0 0.00 MGNREGA

S.No Existing/Old Water Harvesting Structure Maintance (Renovation & Repair)

1 Deepening/Desiltation Of Pond

19 44.96 13487.73 104.5 4294 9 23.01 MGNREGA

2 Deepening Of Percolation Tank

No. 0 0.00 0 0 0 0 0.00 MGNREGA

3 De-siltation of Checkdam No. 92 51.21 15364.35 506 4891 8 7.10 MGNREGA

Page 76: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

74 | P a g e

4 Repairing of Checkdam No. 85 123.05 36915.642 467.5 11752 0 0.00 MGNREGA

5 OTHERS (De-Siltation & Repair Of Village Pond)

No. 4 2.50 750 22 239 0 0.00 MGNREGA

6 OTHERS (De-Siltation & Repair Of Village Well)

No. 2 5.10 1530 11 487 0 0.00 0

S.No Ground Water Recharging Structures

1 Dugwell Recharge structure No. 11 4.60 0 0 439 0 0.00 0

2 Farm Recharge Filter No. 9 2.07 0 0 198 0 0.00 0

3 Holiya in farm/Field No. 0 0.00 0 0 0 0 0.00 0

4 Pond Recharge structure No. 85 40.72 0 0 3889 0 0.00 0

5 OTHERS (Wall Protection Of Well)

No. 97 39.76 0 0 573 0 0.00 0

6 OTHERS (Recharge filter with Bore Well)

No. 174 90.26 0 0 0 0 0.00 0

7 OTHERS (Recharge filter with village Dug Wall)

No. 1 3.95 0 0 0 0 0.00 0

S.No LH & ME & Production System

1 AGRICULTURE ACTIVITIES

0 0.00 0 0 0 0 0.00

Agro Center No. 12 28.90 0 0 0 44 1.80 0

Agricultural Implements No. 8 18.08 0 0 0 113 0.00 Agri Dept

Agro- Forestry No. 0 0.00 0 0 0 0 0.00 0

Crop Demonstration Plot No. 13 3.17 0 0 0 2 0.22 Agri Dept

Fishery Development No. 0 0.00 0 0 0 0 0.00 0

Floriculture Development No. 0 0.00 0 0 0 0 0.00 0

Fodder Bank Development No. 5 12.46 0 0 0 34 0.40 SELF

Green House No. 21 5.06 0 0 0 0 0.00 Misan

Page 77: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

75 | P a g e

Mangalam

Horticulture Plantation No. 0 0.00 0 0 0 0 0.00 0

Kitchen Garden No. 3 0.51 0 0 0 2 0.00 0

Nursery raising No. 0 0.00 0 0 0 0 0.00 0

OTHERS(Crop Proctetion tower)

No. 199 34.28 0 0 0 17 0.62 0

INPUT SUPPORT No. 0 0.00 0 0 0 0 0.00 0

Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation

No. 1029 154.12 0 0 0 1020

253.47 GGRC

Sprinkler Demo. No. 531 71.81 0 0 0 463 59.62 GGRC

Vegetable Nursery Raising with drip irrigation

No. 2 0.48 0 0 0 2 0.72 SELF

Vermi compost No. 42 10.54 0.4 0 0 2 0.00 0

2 AGRO PROCESSING ACTIVITIES

Dal Making Unit No. 0 0.00 0 0 0 0 0.00 0

Flour & Dal/Rice Processing unit

No. 7 12.59 0 0 0 1 1.00 SELF

Garam Masala No. 3 5.00 0 0 0 0 0.00 0

Grading and packaging of agricultural produces,

No. 29 47.78 0 0 0 0 0.00 0

Jam-jelly making No. 0 0.00 0 0 0 0 0.00 0

Microenterprises based on Minor Forest Produce (MFP)

No. 0 0.00 0 0 0 0 0.00 0

Oil extraction mill No. 1 2.00 0 0 0 0 0.00 0

OTHERS No. 16 32.74 0 0 0 0 0.00 0

Package Food Products No. 3 1.50 0 0 0 0 0.00 0

Pulp making No. 0 0.00 0 0 0 0 0.00 0

Rice mill No. 0 0.00 0 0 0 0 0.00 0

Value added products from No. 0 0.00 0 0 0 0 0.00 0

Page 78: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

76 | P a g e

milk

3 Animal Husbandry

Cattle Feed and Nutrition Store

No. 16 48.04 0 0 0 1 0.50 Group Conti.

Animal Health camps No. 64 28.75 0 0 0 17 2.06 Group Conti.

Animal Travis (Pinjaru) No. 0 0.00 0 0 0 0 0.00 Taluka Vaternory

Center Apiculture (Bee keeping) No. 0 0.00 0 0 0 0 0.00 0

Artificial insemination No. 0 0.00 0 0 0 0 0.00 0

Back-yard poultry No. 0 0.00 0 0 0 0 0.00 0

Dairy cooperative promotion, No. 4 10.30 0 0 0 0 0.00 0

OTHERS(Honey Bee Farm) No. 827 8.96 0 0 0 0 0.00 0

Pasture development No. 0 0.00 0 0 0 0 0.00 0

Poultry Farming to individuals

No. 1 2.00 0 0 0 0 0.00 0

Sericulture No. 0 0.00 0 0 0 0 0.00 0

Small ruminants No. 0 0.00 0 0 0 0 0.00 0

Veterinary Aid for livestock No. 0 0.00 0 0 0 0 0.00 0

Cattle Shed No. 30 7.20 0 0 0 0 0.00 0

4 Establishing linkages

Credit linkages No. 1 4.77 0 0 0 0 0.00 0

Linkages with Future Markets,

No. 3 4.46 0 0 0 0 0.00 0

Market linkages, No. 0 0.00 0 0 0 0 0.00 0

OTHERS No. 0 0.00 0 0 0 0 0.00 0

Raw material supply channel, No. 0 0.00 0 0 0 0 0.00 0

5 Local traditional handicraft

Bamboo based products, No. 0 0.00 0 0 0 0 0.00 0

Kutchi Bandhini, No. 0 0.00 0 0 0 0 0.00 0

Page 79: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

77 | P a g e

OTHERS No. 2 2.25 0 0 0 0 0.00 0

Pottery No. 0 0.00 0 0 0 0 0.00 0

6 Minor Activities

Embroidery Unit No. 1 2.47 0 0 0 0 0.00 0

Handicraft Unit No. 6 6.02 0 0 0 0 0.00 0

OTHERS(Grain Bank) No. 36 55.31 0 0 0 3 1.44 P.C.

Provision Store No. 14 15.99 0 0 0 0 0.00 0

stiching machine No. 4 5.10 0 0 0 0 0.00 0

Up Gradation of centering materials

No. 11 21.37 0 0 0 0 0.40 P.C.

Vegetable shop No. 1 0.26 0 0 0 0 0.00 0

7 Non-conventional Energy Sources

Bio gas plant, No. 0 0.00 0 0 0 0 0.00 0

Bio-fuel plantation, No. 0 0.00 0 0 0 0 0.00 0

energy conservation measures,

No. 0 0.00 0 0 0 0 0.00 0

OTHERS No. 0 0.00 0 0 0 0 0.00 0

Solar energy promotion, No. 0 0.00 0 0 0 0 0.00 0

Wind energy production, No. 0 0.00 0 0 0 0 0.00 0

8

Capacity Building, Monitoring & Evaluation

0 55.00 0 0 0 0 0.00 0

9 Admin 0 105.06 0 0 0 0 0.00 0

10 Consolidation 0 59.39 0 0 0 0 0.00 0

TOTAL 2421.74

2290.50

Sr.No Activity Unit Physical Target for FY (2017-18)

Page 80: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

78 | P a g e

Unit Cost (In

Lakhs)

IWMP

Storage Volumes (Cubic Meter)

Command Area/

Irrigation Potential

(Ha.)

Person days/Manday

s Planned

Convergence

Unit

Amount (In

Lakhs)

Name of Schemes

S.No EPA

1 Animal camp No. 0 0.00 0 0 0 0 0.00 0

2 Animal water trough (Havada)

No. 0 0.00 0 0 0 0 0.00 0

3 Causeway on connecting roads

No. 0 0.00 0 0 0 0 0.00 0

4 Check / Protection wall No. 0 0.00 0 0 0 0 0.00 0

5 Demonstration for Agricultural / Animal Husbandry Productivity Enhancement

No. 0 0.00 0 0 0 0 0.00 0

6 Drainage line correction (To prevent flooding of Gamtal)

rmt 0 0.00 0 0 0 0 0.00 0

7 Drinking water facility No. 0 0.00 0 0 0 0 0.00 0

8 Fencing for protection from wild animals

rmt. 0 0.00 0 0 0 0 0.00 0

9 Grassland/Gauchar Development

Ha. 0 0.00 0 0 0 0 0.00 0

10 Improvised and energy efficient smashan gruh (Cemetery )

No. 0 0.00 0 0 0 0 0.00 0

11 Panchayat Well Repair & Pump Room

No. 0 0.00 0 0 0 0 0.00 0

12 Rain water harvesting system No. 0 0.00 0 0 0 0 0.00 0

13 Recharge / Repair of open wells

No. 0 0.00 0 0 0 0 0.00 0

14 Repair / development of artificial water bodies

No. 0 0.00 0 0 0 0 0.00 0

Page 81: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

79 | P a g e

15 Revival of natural water bodies with recharge activities

No. 0 0.00 0 0 0 0 0.00 0

16 Sanitation facilities/Sewerage line

rmt 0 0.00 0 0 0 0 0.00 0

17 Use solar power for productive activities

No. 0 0.00 0 0 0 0 0.00 0

18 Wind energy development No. 0 0.00 0 0 0 0 0.00 0

19 OTHERS (Otta at Tree) No. 0 0.00 0 0 0 0 0.00 0

20 OTHERS (Community Washing Stand and ghat)

No. 0 0.00 0 0 0 0 0.00 0

21 OTHERS (Plantation with Tree Guard)

No. 0 0.00 0 0 0 0 0.00 0

22 OTHERS (Cemetery Fencing & Wood Store Room)

No. 0 0.00 0 0 0 0 0.00 0

23 OTHERS (Nala Plug) No. 0 0.00 0 0 0 0 0.00 0

24 OTHERS (Open well cover) No. 0 0.00 0 0 0 0 0.00 0

25 OTHERS (Snan ghat) No. 0 0.00 0 0 0 0 0.00 0

26 OTHERS (well parapet) No. 0 0.00 0 0 0 0 0.00 0

27 OTHERS (Drainage line farm )

RMT 0 0.00 0 0 0 0 0.00 0

28 OTHERS (Vegetative band) No. 0 0.00 0 0 0 0 0.00 0

S.No Land Development

1 Farm Bunding rmt. 16130

17.31 0 0 0 0 0.00 0

2 Afforestation Ha. 4 4.20 0 0 0 0 0.00 0

3 Agriculture Demo No. 0 0.00 0 0 0 0 0.00 0

4 Agro Forestry Ha. 0 0.00 0 0 0 0 0.00 0

5 Horticulture Ha. 0 0.00 0 0 0 0 0.00 0

6 Land leveling Ha. 37 18.00 0 0 0 0 0.00 Forest

7 Pasture development Ha. 12 15.73 0 0 0 0 0.00 0

8 OTHERS (Plantation With Ha. 0 0.00 0 0 0 0 0.00 0

Page 82: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

80 | P a g e

wire fencing)

9 OTHERS (Sprikleer & drip) rmt. 7 1.60 0 0 0 0 0.00 GGRC

10

11

12

S.No Soil & Moisture Conservation

1 Check wall No. 1 1.00 0 0 96 0 0.00 0

2 Earthen bund No. 1 2.14 0 0 204 0 0.00 0

3 Protection Wall No. 0 0.00 0 0 0 0 0.00 MGNREGA

4 Waste weir No. 0 0.00 0 0 0 0 0.00 0

5 Bench Terracing cumec

2 1.97 0 0 188 0 0.00 0

6 Bori bandh No. 0 0.00 0 0 0 0 0.00 0

7 Brushwood Checks No. 0 0.00 0 0 0 0 0.00 0

8 Countour Bunding rmt. 0 0.00 0 0 0 0 0.00 0

9 Countour Trenches rmt. 400 6.00 0 0 573 0 0.00 0

10 Earthern Dam No. 0 0.00 902 14 0 0 0.00 0

11 Field Outlet No. 104 14.51 0 0 1386 0 0.00 0

12 Gabion structure No. 0 0.00 0 0 0 0 0.00 0

13 Graded Bunding rmt. 0 0.00 0 0 0 0 0.00 0

14 Gully plug No. 10 6.08 1356.092 59.5 581 0 0.00 0

15 Loose boulder Checks No. 127 13.30 0 0 67 0 0.00 0

16 Nala Plug No. 19 12.82 0 0 1224 0 0.00 0

17 Stone bunding rmt. 0 0.00 0 0 0 0 0.00 0

18 Straggred Contour trenching(Terrace Talavadi)

900 2.24 0 0 214 0 0.00 0

19 OTHERS (Drainage line) rmt. 2750 8.23 0 0 0 0 0.00 0

20 OTHERS (Dry Rubble wall with pointing)

rmt. 0 0.00 0 0 0 0 0.00 0

Page 83: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

81 | P a g e

21 OTHERS (well parapet) No. 0 0.00 0 0 0 0 0.00 0

OTHERS (Drainage line farm )

rmt 0 0.00 0 0 0 0 0.00 0

22 OTHERS (Vegetative band) No. 0 0.00 0 0 0 0 0.00 0

S.No Water Harvesting Structure

1 Cause way cum Chek dam No. 0 0.00 0 0 0 0 3.50 Mla

2 Check dam No. 0 0.00 0 0 0 1 4.00 0

3 Village/Community Pond No. 1 4.66 1398.69 5.5 445 4 8.00 MGNREGA

4 Farm Pond No. 9 2.10 630 49.5 201 2 1.50 Self,mla

5 Percolation Tank No. 0 0.00 0 0 0 0 0.00 MGNREGA

6 Pond Inlet No. 0 0.00 0 0 0 0 0.00 GLDC

7 Pond Outlet No. 0 0.00 0 0 0 0 0.00 0

8 OTHERS (Connection Diversion Drainege Line)

rmt 0 0.00 0 0 0 0 0.00 MGNREGA

9 OTHERS (Paka Plag) rmt 0 0.00 0 0 0 0 0.00 MGNREGA

10

11

S.No Existing/Old Water Harvesting Structure Maintance (Renovation & Repair)

1 Deepening/Desiltation Of Pond

0 0.00 0 0 0 7 10.70 MGNREGA

2 Deepening Of Percolation Tank

No. 0 0.00 0 0 0 0 0.00 MGNREGA

3 De-siltation of Checkdam No. 0 0.00 0 0 0 0 0.00 MGNREGA

4 Repairing of Checkdam No. 12 14.78 4434 66 1412 0 0.00 MGNREGA

Page 84: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

82 | P a g e

5 OTHERS (De-Siltation & Repair Of Village Pond)

No. 0 0.00 0 0 0 0 0.00 MGNREGA

6 OTHERS (De-Siltation & Repair Of Village Well)

No. 0 0.00 0 0 0 0 0.00 0

S.No Ground Water Recharging Structures

1 Dugwell Recharge structure No. 35 9.20 0 0 879 0 0.00 0

2 Farm Recharge Filter No. 0 0.00 0 0 0 0 0.00 0

3 Holiya in farm/Field No. 0 0.00 0 0 0 0 0.00 0

4 Pond Recharge structure No. 0 0.00 0 0 0 0 0.00 0

5 OTHERS (Wall Protection Of Well)

No. 0 0.00 0 0 0 0 0.00 0

6 OTHERS (Recharge filter with Bore Well)

No. 0 0.00 0 0 0 0 0.00 0

7 OTHERS (Recharge filter with village Dug Wall)

No. 0 0.00 0 0 0 0 0.00 0

8

9

S.No LH & ME & Production System

1 AGRICULTURE ACTIVITIES

0 0.00 0 0 0 0 0.00

Agro Center No. 0 0.00 0 0 0 0 0.00 0

Agricultural Implements No. 0 0.00 0 0 0 0 0.00 Agri Dept

Agro- Forestry No. 0 0.00 0 0 0 0 0.00 0

Crop Demonstration Plot No. 0 0.00 0 0 0 0 0.00 Agri Dept

Fishery Development No. 0 0.00 0 0 0 0 0.00 0

Floriculture Development No. 0 0.00 0 0 0 0 0.00 0

Fodder Bank Development No. 0 0.00 0 0 0 0 0.00 SELF

Green House No. 0 0.00 0 0 0 0 0.00 Misan Mangalam

Page 85: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

83 | P a g e

Horticulture Plantation No. 0 0.00 0 0 0 0 0.00 0

Kitchen Garden No. 0 0.00 0 0 0 0 0.00 0

Nursery raising No. 0 0.00 0 0 0 0 0.00 0

OTHERS(Crop Proctetion tower)

No. 40 8.40 0 0 0 10 1.10 0

INPUT SUPPORT No. 0 0.00 0 0 0 0 0.00 0

Promoting Micro-Irrigation Systems like drip and Sprinkler Irrigation

No. 0 0.00 0 0 0 0 0.00 GGRC

Sprinkler Demo. No. 0 0.00 0 0 0 0 0.00 GGRC

Vegetable Nursery Raising with drip irrigation

No. 0 0.00 0 0 0 0 0.00 SELF

Vermi compost No. 0 0.00 0 0 0 0 0.00 0

2 AGRO PROCESSING ACTIVITIES

0 0 0 0 0.00 0

Dal Making Unit No. 0 0.00 0 0 0 0 0.00 0

Flour & Dal/Rice Processing unit

No. 0 0.00 0 0 0 0 0.00 SELF

Garam Masala No. 0 0.00 0 0 0 0 0.00 0

Grading and packaging of agricultural produces,

No. 1 1.40 0 0 0 0 0.00 0

Jam-jelly making No. 0 0.00 0 0 0 0 0.00 0

Microenterprises based on Minor Forest Produce (MFP)

No. 0 0.00 0 0 0 0 0.00 0

Oil extraction mill No. 0 0.00 0 0 0 0 0.00 0

OTHERS No. 0 0.00 0 0 0 0 0.00 0

Package Food Products No. 0 0.00 0 0 0 0 0.00 0

Pulp making No. 0 0.00 0 0 0 0 0.00 0

Rice mill No. 0 0.00 0 0 0 0 0.00 0

Value added products from milk

No. 0 0.00 0 0 0 0 0.00 0

Page 86: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

84 | P a g e

3 Animal Husbandry 0 0 0 0 0.00 0

Cattle Feed and Nutrition Store

No. 1 2.00 0 0 0 0 0.00 Group Conti.

Animal Health camps No. 5 2.24 0 0 0 0 0.00 Group Conti.

Animal Travis (Pinjaru) No. 0 0.00 0 0 0 0 0.00 Taluka Vaternory

Center Apiculture (Bee keeping) No. 0 0.00 0 0 0 0 0.00 0

Artificial insemination No. 0 0.00 0 0 0 0 0.00 0

Back-yard poultry No. 0 0.00 0 0 0 0 0.00 0

Dairy cooperative promotion, No. 0 0.00 0 0 0 0 0.00 0

OTHERS(Honey Bee Farm) No. 0 0.00 0 0 0 0 0.00 0

Pasture development No. 0 0.00 0 0 0 0 0.00 0

Poultry Farming to individuals

No. 0 0.00 0 0 0 0 0.00 0

Sericulture No. 0 0.00 0 0 0 0 0.00 0

Small ruminants No. 0 0.00 0 0 0 0 0.00 0

Veterinary Aid for livestock No. 0 0.00 0 0 0 0 0.00 0

Cattle Shed No. 0 0.00 0 0 0 0 0.00 0

4 Establishing linkages 0 0 0 0 0.00 0

Credit linkages No. 0 0.00 0 0 0 0 0.00 0

Linkages with Future Markets,

No. 0 0.00 0 0 0 0 0.00 0

Market linkages, No. 0 0.00 0 0 0 0 0.00 0

OTHERS No. 0 0.00 0 0 0 0 0.00 0

Raw material supply channel, No. 0 0.00 0 0 0 0 0.00 0

5 Local traditional handicraft

0 0 0 0 0.00 0

Bamboo based products, No. 0 0.00 0 0 0 0 0.00 0

Kutchi Bandhini, No. 0 0.00 0 0 0 0 0.00 0

OTHERS No. 0 0.00 0 0 0 0 0.00 0

Page 87: GIR SOMNATH, GUJARAT - Pradhan Mantri Krishi ... SOMNATH, GUJARAT GIR SOMNATH Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) District Irrigation Plan (2016-2020) GIR SOMNATH, GUJARAT

85 | P a g e

Pottery No. 0 0.00 0 0 0 0 0.00 0

6 Minor Activities 0 0 0 0 0.00 0

Embroidery Unit No. 0 0.00 0 0 0 0 0.00 0

Handicraft Unit No. 0 0.00 0 0 0 0 0.00 0

OTHERS(Grain Bank) No. 2 2.46 0 0 0 0 0.00 P.C.

Provision Store No. 0 0.00 0 0 0 0 0.00 0

stiching machine No. 0 0.00 0 0 0 0 0.00 0

Up Gradation of centering materials

No. 0 0.00 0 0 0 0 0.00 P.C.

Vegetable shop No. 0 0.00 0 0 0 0 0.00 0

7 Non-conventional Energy Sources

0 0 0 0 0.00 0

Bio gas plant, No. 0 0.00 0 0 0 0 0.00 0

Bio-fuel plantation, No. 0 0.00 0 0 0 0 0.00 0

energy conservation measures,

No. 0 0.00 0 0 0 0 0.00 0

OTHERS No. 0 0.00 0 0 0 0 0.00 0

Solar energy promotion, No. 0 0.00 0 0 0 0 0.00 0

Wind energy production, No. 0 0.00 0 0 0 0 0.00 0

8

Capacity Building, Monitoring & Evaluation

0 40.00 0 0 0 0 0.00 0

9 Admin 0 55.64 0 0 0 0 0.00 0

10 Consolidation 0 99.15 0 0 0 0 0.00 0

TOTAL 367.17 194.50