    renewable community power

    ~ Kyabra Community Forum ~

  • 8/7/2019 Presentation Kyabra

    2/27

  • 8/7/2019 Presentation Kyabra

    3/27

    Vision & Purpose~ a vision is emerging for the New England to

    become a net exporter of renewable energy ~

    Some $10-20Bn of investment into commerciarenewable energy projects is anticipated.

    New England Wind aims to catch this wind,& build on the take-up of small-scale solar,

    to be NSW's 1st community wind farm,

    with 4-6 turbines,powering 20% of the Tablelands' homes.

  • 8/7/2019 Presentation Kyabra

    4/27

    Over 50% of Australias greenhouse gasses come fromelectricity use...the electricity sector [is] the biggest singl

    contributor... Transport is the second biggest... at 16%.

  • 8/7/2019 Presentation Kyabra

    5/27

    NSW Demand for Generation

  • 8/7/2019 Presentation Kyabra

    6/27

    Ninety per cent ofelectricity used in NSW is

    generated from coal-firedpower stations.- NSW Industry & Investment

  • 8/7/2019 Presentation Kyabra

    7/27

  • 8/7/2019 Presentation Kyabra

    8/27

    About Wind Power

    Highly efficient turbine technology ~ 45% of wind energyelectricity (coal-fired power 29-37%)

    16 countries (including Australia) have more than1,000 MW of installed wind capacity

    Sth Oz & Denmark produce 20% of their electricity with w

    NSW's largest is Capital Wind Farm with 141MW ~enough for 60,000 households

    Most affordable renewable energy &the only clean technology ready forlarge-scale deployment

  • 8/7/2019 Presentation Kyabra

    9/27

    Wind Turbine WorkingsNoise Noise at the base of a modern turbine is below 35dBA ~ same as traffic 5km away (N

    has the most stringent noise requirements for wind turbines of any state in the world)

    Base Load Electricity supply is managed in 5 minute intervals & wind power reduces demand on

    coal & gas plants whenever it blows with fast-response gas plants likely in the future

    EmbodiedEnergy

    With a 20+ year life span the turbine will produce 80 times more energy than is used foit's construction & operation

    Wildlife A 2007 study by the Government of South Australia shows one domestic cat kills morebirds in a year than one wind turbine

    Safety 24-hour monitoring, lightening protection, high winds shut down, low flammability

  • 8/7/2019 Presentation Kyabra

    10/27

    Sth Australia Wind Power 19%

  • 8/7/2019 Presentation Kyabra

    11/27

    Approved 2,500+ MW

    Crookwell II 92MW

    Silverton(1) 846 MW

    Silverton (2) 948 MW

    Gullen Range 248 MW

    Taralga 186 MW

    Conroys Gap 30 MW Black Springs 19 MW

    Glen Innes 81 MW

    Kyoto 102 MW

    Boco Rock 270 MW

    Woodlawn 42MW

    Gunning 46MW

    Under assessment 2,500+ MW

    Flyers Creek 100 MW

    Ben Lomond 165 MW

    Yass 547 MW

    Sapphire 525 MW

    Adjungbilly 39 MW

    Capital ll 100 MW

    Crookwell lll 116 MW

    Collector 160 MW

    Paling Yards 180 MW

    Birrema 264 MW

    White Rock 340 MW

    Bodangora 110MW Rugby 290MW

    NSW Wind Farms

  • 8/7/2019 Presentation Kyabra

    12/27

    Community Attitudes

    Research

    57% of farmers said they would considerhosting wind turbines on their property.

  • 8/7/2019 Presentation Kyabra

    13/27

    Community & Cooperative Energy

    Denmark100,000+ members

    86% of all wind power

    Germany1,000's of cooperatives

    8% of total energy

    90,000 employees

    Japan

    11 turbines, 15MW

    England8 wind farms

    7,000 members

    USA70% of allelectricity co-operative owned

    Scotland10 wind farms

  • 8/7/2019 Presentation Kyabra

    14/27

    Artists Impression

    Hepburn WinAustralia's 1st Community Owne

    2 turbines

    Power for 2,300 homes

    Raised $12m & 1,600 members

  • 8/7/2019 Presentation Kyabra

    15/27

  • 8/7/2019 Presentation Kyabra

    16/27

    Status Report

    180+ Pv Systems & 525kW+ residential, farms

    government & business (1,000% Increase)125+ SHW Systems residential & government

    12+ Solar Thermal Air Heating & Cooling Systems

    145 Home Sustainability AssessmentsNearly $6.5m project value

    4 new solar companies in Region

    Systems 20-50% more affordable

    Training for 30+ tradespeople

    Substantial community educationAddressing the priority fora 'new energy future'identified through NESS

  • 8/7/2019 Presentation Kyabra

    17/27

    Phase1 WorkIdentify level of support (investment, suitable

    land holdings, purchase of electricity, etc)Research legal & governance structures

    Work out the Principles to do it 'right'

  • 8/7/2019 Presentation Kyabra

    18/27

    Goals

    4~6 turbines producing power for 10,000 people

    $25~30m investment & community capitalReturns for community ~ dividends, jobs, business,sustainability fund, clean energy & more

  • 8/7/2019 Presentation Kyabra

    19/27

    Innovative Edges~ extending on Hepburn ~

    Institutional investment

    Community ownership within commercial farms

    Local skills, employment, business

    Direct use &/or saleof power

    Benefits for the wider

    community

    Proposed 7 Turbine Farm ~ Wingates,

    P t N t k & R l

  • 8/7/2019 Presentation Kyabra

    20/27

    Partner Network & Roles

    Starfish ~ Forums, Communication & Coordination

    Community Energy ~ Embark & Specialists

    Landholders ~ Landcare, HiCUB, DECCW

    Investment ~ CMG, ADCC

    Community Research ~ SLA, UNELegal ~ EDO, Wilson & Co

  • 8/7/2019 Presentation Kyabra

    21/27

    10 Years

    100 Projects

    100,000 Investors

    1,000,000 Advocates

    Sustainable Energy Continuum

  • 8/7/2019 Presentation Kyabra

    22/27

    Sustainable Energy Continuum

    ~ Reconsider ~

    SustainabilityAssessments

    Appropriate Clothing

    Use passive heating &cooling

    Switch Off Standby

    ~ Reduce ~

    Retrofit for efficiency

    Energy Star Ratings

    Insulation, draftsealing, double glazing

    Curtains & Pelmets

    Clean burn additives

    ~ Renew ~

    Shift to clean,

    sustainable &renewable sourceof energy, heatingcooling & hot wat

    b

  • 8/7/2019 Presentation Kyabra

    23/27

    ~ Kyabra Forum ~

  • 8/7/2019 Presentation Kyabra

    24/27

    Keeping the Community Informed

    Partners ~ Newsletters, eLists, Meetings

    Public & Media Communication

    Digital Media

    Dialogue Summaries

    Digital Stories

    Final Documentary

    Reports

    Interim Report (May 2011)

    Final Report & Recommendations (June 2011)

    Greenwich Wind Farm, Onta

    2

  • 8/7/2019 Presentation Kyabra

    25/27

    Phase2

    Study is 1st step in 4~5+ year

    journeyPhase2 would include

    Start-up Funding

    Site Identification & MonitoringResearch Turbine Technologies

    Grid Connection

    Power Sale

    Investor Deposits

    Member recruitment

    G t l d i d O t

  • 8/7/2019 Presentation Kyabra

    26/27

    Get Involved & Find Out More

    Online Survey & eList

    Community Forums

    Walcha 31 March

    Glen Innes 6 April

    Investor Forum 7 April

    Help Recruit Interest

    Join us for a Wind Farm

    Study Tourwww.starfishenterprises.net

    Starfish Hill Wind FSouth Austr

    THANK YOU!!

    http://www.starfishenterprises.net/http://www.starfishenterprises.net/
  • 8/7/2019 Presentation Kyabra

    27/27

    Starfish Hill Wind FSouth Aust

    THANK YOU!!