13
Traffic Crash Study 1300 EAST February 2013

description

 

Transcript of Presentation city council 1300 east

Page 1: Presentation city council 1300 east

Traffic Crash Study

1300 EAST

February 2013

Page 2: Presentation city council 1300 east

SAFETY IMPROVEMENTS

Page 3: Presentation city council 1300 east

CONSTRUCTION SEGMENTS

Segment 2 Segment 3Segment 1

Segment Segment LimitsStart of Construction End of Construction

(1st Day of Traffic Control) (Substantial Completion)

1 Creek Rd though 8600 S Friday, May 8, 2009 Wednesday, March 3, 2010

2 8625 S through 9400 S Wednesday, March 3, 2010 Friday, July 30, 2010

3 9425 S through 11000 S Thursday, July 15, 2010 Wednesday, June 8, 2011

Page 4: Presentation city council 1300 east

CRASH DATA BY SEGMENT

Segment 2 Segment 3

115 / 78-32%

54 / 43-19%

130 / 71-45%

Crashes per year Before Construction/ Crashes per year After Construction

Percent Difference

Segment 1 ⇦

Page 5: Presentation city council 1300 east

CRASH DATA TOTAL

Segment 2 Segment 3

298 / 192-36%

Segment 1

Crashes per year Before Construction/ Crashes per year After Construction

Percent Difference

106 fewer Crashes per year

Page 6: Presentation city council 1300 east

CRASH DATA BY SECTION

Signal - C

reek R

oad

Sectio

n 1A

Sectio

n 1B

Signal - 7

720 S

outh

Sectio

n 1C

Signal - F

orbush

Lane

Sectio

n 1D

Sectio

n 1E

Signal - 8

600 S

outh

Sectio

n 2A

Sectio

n 2B

Signal - 9

400 S

outh

Sectio

n 3A

Signal - R

idgemark

Driv

e

Sectio

n 3B

Sectio

n 3C

Signal - S

ego Lily

Driv

e

Sectio

n 3D

Sectio

n 3E

Signal - 1

0600

South

Sectio

n 3F

Signal - 1

1000

South0

5

10

15

20

25

30

35

Before Construction After Construction

Ave

rage

Num

ber o

f Cra

shes

per

Yea

r

More than a 60% Crash Decrease Crash Increase

Page 7: Presentation city council 1300 east

SECTION AREAS: BREAKDOWN

Main Intersections

137 / 103-25%

Crashes per year Before Construction/ Crashes per year After Construction

Percent Difference

Roadway Sections

161 / 90-44%

Page 8: Presentation city council 1300 east

CRASH SEVERITY CLASSIFICATION

1. No Injury/Property Damage Only (PDO)2. Possible Injury3. Non-Incapacitating Injury4. Incapacitating Injury5. Fatal

Page 9: Presentation city council 1300 east

CRASH SEVERITY BY SEGMENT

Segment 2 Segment 3

1 85/58 -32%2 17/8.5 -50%3 9.7/9 -7%4* 2.3/2.5 +7%

1 41/28 -32%2 6.7/11 +60%3 4.7/2.7 -43%4* 1/2 +100%

1 93/49 -47%2 23/9 -60%3 11/9 -21%4* 2.7/4 +50%

Severity Before After Percent per year Construction Construction Difference

Segment 1 ⇦

* Data sets are to small to be statistically valid, more time/data is needed to verify if the increase is more than a random occurrence.

Page 10: Presentation city council 1300 east

CRASH SEVERITY BY SEGMENT

Segment 2 Segment 3

1 219/135 -37%2 46/28 -40%3 26/21 -19%4 6/8.5 +33%

Segment 1 ⇦

Severity Before After Percent per year Construction Construction Difference

* Data sets are to small to be statistically valid, more time/data is needed to verify if the increase is more than a random occurrence.

Page 11: Presentation city council 1300 east

CONCLUSIONS & RECOMMENDATIONS

Conclusions 36% decrease in crashes (106 fewer crashes per year) Severity 1-3 crashes decreased along the corridor

Recommendations Analyze Severity 4 and 5 crashes for a possible trend

which may be mitigated Analysis of 7720 South and Commercial Area 1

Intersections Reduce Red Light Runners

Analysis of Buttercup Drive Intersection Reduce Car vs. Pedestrian Crashes

Continue Street Lighting South to the Draper Parkway

Page 12: Presentation city council 1300 east

SPECIAL THANK YOU

Page 13: Presentation city council 1300 east

Ryan KumpTraffic Engineer, Sandy City801-568-2999