    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Tacoma City Council Study SessionJuly 15, 2008

  • 8/14/2019 East Foss Council PP 071508_FINAL

    2/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    The Tacoma City Council commissioned astudy to work cooperatively with the Port of

    Tacoma and other area businesses to developa transportation corridor in the alignment of theD Street in the East Thea Foss Peninsula areato separate industrial and nonindustrial uses

    and to address traffic and related issues amongthe varied interests.

    Project Purpose

  • 8/14/2019 East Foss Council PP 071508_FINAL

    3/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Project Area

  • 8/14/2019 East Foss Council PP 071508_FINAL

    4/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    To identify possible transportation solutionsfor the East Foss Peninsula that are

    consistent with planning efforts, protect andencourage economic development, andfacilitate a transition between co-existing landuses of the East Thea Foss peninsula.

    Steering Committee Vision Statement

  • 8/14/2019 East Foss Council PP 071508_FINAL

    5/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Focus on three primary area wide needs:

    Traffic Access, Circulation & FunctionalSeparation

    Transitions between mixed-use and industrialuses

    Maintain/improve arterials to support existingbusinesses and to help spur new privateinvestments

    Steering Committee

  • 8/14/2019 East Foss Council PP 071508_FINAL

    6/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Study Assumptions

    No change to existing zoning

    Recommended road projects are not subject to theMurray Morgan bridge funding decisions

    Recognize the importance of the transportationlinks between the downtown and the Peninsulaarea

    Prepared planning level project cost estimates

    Emergency service levels would be unchanged

    The E. 11th Street Bridge over the Puyallup River isapproaching its service life

  • 8/14/2019 East Foss Council PP 071508_FINAL

    7/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Stakeholders / Existing Land Use Zoning

    Prominent Landowners / Uses J.M. Martinac* Petrich Marine Dock* Johnnys Dock Valero LP* Simpson Tacoma Kraft Mill* Globe Machinery* Supervalu Supervalu, International Panattoni* Burlington Northern Santa Fe Railroads Colonial Fruit and Produce* Thea Foss Development Authority* Port of Tacoma*

    Conoco Phillips Stellar Port Maritime & Industrial NW Detention Center Amtrak Freighthouse Square Tacoma Dome

    USF Reddaway

  • 8/14/2019 East Foss Council PP 071508_FINAL

    8/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Traffic Analysis Scenarios

    Two access & circulation scenarios involving theMurray Morgan Bridge and East D Street at SR-509were analyzed as follows:

    I. Fully operational Murray Morgan Bridge, D Streetoverpass complete, SR509 ramps to D Street.

    II. Vehicle restricted operation of the Murray MorganBridge, D Street overpass complete, and no SR 509ramps to D Street.

  • 8/14/2019 East Foss Council PP 071508_FINAL

    9/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Current Conditions

    East D Street at E. 15th looking South

    East F Street at E. 7th looking South

    E. 15th Street at St. Paul looking West

    East D Street at E. 7th looking North

  • 8/14/2019 East Foss Council PP 071508_FINAL

    10/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Year 2025 Traffic Level of Service

    LOS No Bridge/No Ramps LOS with Bridge/Ramps

    Ci f T

  • 8/14/2019 East Foss Council PP 071508_FINAL

    11/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Future Circulation (No Bridge / No Ramps)

    Concept A Extend East D Street Concept B Use Existing Streets

    Cit f T

  • 8/14/2019 East Foss Council PP 071508_FINAL

    12/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor StudyFuture Circulation (Bridge /Ramps)

    Concept A Extend East D Street Concept B Use Existing Streets

    Cit f T

  • 8/14/2019 East Foss Council PP 071508_FINAL

    13/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Recommended Solutions & Public Opinion

    Varied views on separating industrial and mixed-use traffic

    Overall support for slip ramps at SR 509 / East D Street

    Support for St. Paul Ave/E. F Street at East 11th Streetintersection improvement

    Varied opinions on East D Street designs

    Business opposition to restriction industrial trafficon East DStreet north of E. 11th Street

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    14/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Recommended Solutions

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    15/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Recommended Solutions

    Projects B & C East D Street & SR 509 Ramps

    B

    C

    Project C only

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    16/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Recommended Solutions

    Projects D, E and I (No MM Bridge)

    D

    IE

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    17/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Recommended Solutions

    Project E (Functioning MM Bridge)

    E

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    18/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Recommended Solutions

    Projects F, G and H:East F Street, East D Street & NewEast 10th Street (No Murray MorganBridge)

    H

    G

    F

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    19/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Recommended Solutions

    Map # Location Recommendation Cost Estimate

    Both Options

    A East D / Puyallup Ave. Adjust traffic signal phasing (Grade Separation improvement complete andopen).

    $2,000

    B East D / SR 509 Construct Half Single Point Urban Interchange at East D St. / SR 509 (Ramps toand from the east) and signal.

    $10,962,0001

    C East D / East 15th Streets Improve East 15th St. / East D St. to include 10' sidewalk on west side, SBparking lane, 14' SB lane, 12' landscaped median/turn pocket, 14' NB lane.Access management/driveway consolidation where needed. Also improvepedestrian crossings at designated locations. Relocate transit stops/shelters tocrosswalk locations.

    $4,771,000

    D East D St. Extension (PrivateRoad)2

    Extension is on private land and would require the relocation of BNSF rail spur.Extend East D St. south of East 11th St. to link to East 15th St. (10' sidewalk onwest side, SB parking lane, 2 - 11' travel lanes, 6' sidewalk on east side) 3.

    $3,354,0001

    E E. 11th / E. F St. Realign intersection at East 11th St. and East F St. $682,000

    F East F St. Reconstruct East F Street north of East 11th St. $1, 622,000

    G East D St. (North of E. 11th St.) Widen East D St. north of East 11th St. (SB parking lane and 2 - 14' lanes, 10'sidewalk on west side.

    $1,760,0001

    Operational Murray Morgan Bridge

    H East 10th St. Add new east-west street (East 10th St.) between East D and East F Streets toinclude one 14' lane each direction and 6' sidewalk on south side.

    $620,000

    No Murray Morgan Bridge

    I East 11th St. Extend East 11th St. west to tie into East D St.; Multi-use trail on north sidelinking to future shoreline esplanade and sidewalk on south side.

    $846,0001

    Total with Operational Murray Morgan Bridge $23,773,0001

    Total with Murray Morgan Bridge closed $23,999,0001

    Note 1: The Cost Estimate does not include costs for Permitting, Right of Way, Utility and Agency Agreements, or Bridge removal.

    Note 2: The recommendation of this planned Private Road does irrevocably commit the property owner to build the road.

    Note3: The roadway cross-section was developed for cost purposes only.

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    20/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Other Recommended Solutions

    Pedestrian Links

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    21/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Summary of Key Points

    Study area wide need for roadway maintenance

    Desire for slip ramps at East D Street to SR 509

    Desire to increase economic/redevelopmentopportunities of underutilized parcels

    Need for improved arterial design to meet existing uses

    Desire to ensure equitable distribution of improvementcosts

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    22/43

    City of TacomaEast Thea Foss Waterway Transportation

    Corridor Study

    Recommended Implementation Strategy

    Other Implementation Strategies:

    Develop a plan to classify heavy truck arterials and implementheavy truck arterial design standards.

    Determine if a shared cost approach (LID or other) would beacceptable to study area businesses and property owners.

    As funding allows, adopt the recommended projects into the CitysSix-Year Transportation Program 2008 amendment.

    Add all unfunded capital projects to the 2008 ComprehensivePlan/Transportation Element/Project list.

    Implement three priority projects:

    1. Begin needed street and rail crossing maintenance.

    2. Improve the East 11th Street at East F Street/St Paul intersection.

    3. Move forward with SR 509 ramp feasibility with WSDOT and BNSF

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    23/43

    C y o aco aEast Thea Foss Waterway Transportation

    Corridor Study

    Factors Affecting Implementation

    Competing interests for limited funding

    Current economic conditions

    Availability of grant funding

    Varied opinions on separating traffic

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    24/43

    yEast Thea Foss Waterway Transportation

    Corridor Study

    Recommended Next Steps

    Incorporate appropriate sections of traffic study into theS-8 Shoreline Master Plan Regulations.

    Implement the recommended three priority projects

    Participating entities need to take studyrecommendations back to their boards/commissions

    Increase coordination of advanced facility planningbetween the City and the Port of Tacoma.

    Facilitate partnerships to share infrastructure costs tomaintain existing uses and to increase economic

    development in the study area.

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    25/43

    yEast Thea Foss Waterway Transportation

    Corridor Study

    Questions?

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    26/43

    yEast Thea Foss Waterway Transportation

    Corridor Study

    Intentionally Blank

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    27/43

    East Thea Foss Waterway TransportationCorridor Study

    Alternative Concept

    Gateway, Shared Use Path, Nonmotorized Bridge

    City of Tacoma

  • 8/14/2019 East Foss Council PP 071508_FINAL

    28/43

    East Thea Foss Waterway TransportationCorridor Study

    Roadway Network

    Freeways Interstate 5 Interstate 705 SR 509Principal Arterials Puyallup Avenue

    Portland Avenue East 11th Street

    Minor Arterials East D Street East 15th Street St. Paul Avenue

    Collector Arterials East 26th Street East G Street East L Street East 27th Street Lincoln Avenue

    City of TacomaE Th F W T i

  • 8/14/2019 East Foss Council PP 071508_FINAL

    29/43

    East Thea Foss Waterway TransportationCorridor Study

    Accidents

    Intersection Accidents by Typ

    0

    5

    10

    15

    20

    25

    30

    35

    40

    E.26thSt.atE.PortlandAve.

    E.DSt.atE.PuyallupAve.

    E.GSt. atE.PuyallupAve.

    E.LSt.atE.PuyallupAve.

    E.MSt.atE.PuyallupAve.

    E.McKinleyAve.atE.PuyallupAve.

    E.15thSt.atE.St .PaulAve.

    E.St.PaulAve.atE.11thSt.

    E.PortlandAve. atE.PuyallupAve.

    E.PortlandAve. atE.LincolnAve.

    E.PortlandAve. atE.St.PaulAve.

    Intersection Location

    AccidentNu

    mber2004-2006

    Pedestrian

    Other

    Backing

    Head On

    Parked Vehicle/ Fixed Object

    Sideswipe/ Lane Change

    Right Angle/ Broadside

    Approach Turn

    Rear End

    City of TacomaE t Th F W t T t ti

  • 8/14/2019 East Foss Council PP 071508_FINAL

    30/43

    East Thea Foss Waterway TransportationCorridor Study

    Freight

    Truck Routes Portland Avenue Puyallup Avenue East D Street St. Paul Avenue East 11th Street

    Rail Facilities BNSF/ UPRR Tacoma Rail Mountain Division BNSF Log Yards UP Tacoma Yards

    City of TacomaE t Th F W t T t ti

  • 8/14/2019 East Foss Council PP 071508_FINAL

    31/43

    East Thea Foss Waterway TransportationCorridor Study

    Non-Motorized Facilities

    Pedestrian Gaps / Barriers Portland Avenue (N. of St. Paul) Portland Ave (West side), S. of SR 509 St. Paul near 11th and 15th D St. north of Puyallup (in progress) D / F Streets north of 11 th Street 25th Street East of J Street 26th Street East of G Street

    Bicycle Gaps / Barriers Puyallup Avenue D Street (North of SR 509)

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    32/43

    East Thea Foss Waterway TransportationCorridor Study

    Transit

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    33/43

    East Thea Foss Waterway TransportationCorridor Study

    Current Planned Projects

    Bridge Projects East D Street Overpass East 11th Street Bridge Lincoln Avenue Bridge Puyallup River Bridge I-5 / McKinley Avenue Bridge I-5 / L Street Bridge I-5 Puyallup River Bridge

    Road / Interchange Projects Portland Avenue Overlay Lincoln Avenue Overlay I-5 / Portland Avenue Interchange

    Transit Projects Bus PLUS within Peninsula New Trunk Route from Lakewood to

    Tacoma Dome

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    34/43

    East Thea Foss Waterway TransportationCorridor StudyCurrent Planned Projects

    (Unfunded)Road / Interchange Projects

    East D Street Slip Ramps East C Street Extension I-5 HOV Direct Access near TacomaDome East L Street SignalsNon-Motorized Projects East 11th Street Trail

    St. Paul Avenue Trail Portland Avenue Trail East 25th Street Trail SR 509 Trail Waterfront Esplanade Puyallup Avenue Bike Lanes East D Street Bike Lanes (over I-5) East G Street Bike Lanes (over (I-5) East 26th Street/River Road Bike Lanes Improved pedestrian facilities on PuyallupAvenue, East C St., East 26th St. East C Street connection to waterwayTransit Projects Light Rail to Seattle

    Downtown Circulator Tacoma Dome Multi-Modal Station

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    35/43

    East Thea Foss Waterway TransportationCorridor StudyArea A Options (No Bridge / No

    Ramps)

    East D or F Street Extension Use Existing Streets

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    36/43

    East Thea Foss Waterway TransportationCorridor StudyArea B Options (No Bridge / No

    Ramps)

    East D Street / 15th

    Street Boulevard East D Street / 15th

    IndustrialRoad

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    37/43

    East Thea Foss Waterway TransportationCorridor StudyArea C Options (No Bridge / No

    Ramps)

    East D Street Boulevard East D Street Industrial Road

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    38/43

    East Thea Foss Waterway TransportationCorridor StudyArea D Options (No Bridge / No

    Ramps)

    East D Street Boulevard East D Street Industrial Road

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    39/43

    East Thea Foss Waterway TransportationCorridor Study

    East D or F Street Extension East D and F Streets

    Area A Options (Operational Bridge / SR509 Ramps)

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    40/43

    East Thea Foss Waterway TransportationCorridor StudyArea A Options (Operational Bridge /

    SR 509 Ramps)

    Use Existing Streets

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    41/43

    East Thea Foss Waterway TransportationCorridor StudyArea B Options (Operational Bridge /

    SR 509 Ramps)

    East D Street / 15

    th

    Street Boulevard East D Street / 15th

    IndustrialRoad

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    42/43

    y pCorridor StudyArea C Options (Operational Bridge /

    SR 509 Ramps)

    East D Street Boulevard East D Street Industrial Road

    City of TacomaEast Thea Foss Waterway Transportation

  • 8/14/2019 East Foss Council PP 071508_FINAL

    43/43

    y pCorridor Study

    East D Street Boulevard East D Street Industrial Road

    Area D Options (Operational Bridge /SR 509 Ramps)