Presentation

11
> www.infotechsw.com August 31, 2022 > Presentation to Abhiman Ghanshyam Business Development Manager Innovant Consulting www.infotechsw.com Automated Testing Services

Transcript of Presentation

Page 1: Presentation

>

www.infotechsw.com

May 3, 2023

> Presentation to

Abhiman GhanshyamBusiness Development Manager

Innovant Consulting

www.infotechsw.com

Automated Testing Services

Page 2: Presentation

>

www.infotechsw.com

Automated Testing Services

eCATT Testing Services

eCATTAutomated Testing &

Test Management Tools

Offerings

All logos, trademarks and graphics used herein are the property of their respective owners

Page 3: Presentation

>

www.infotechsw.com

Snapshot

SAP Testing• eCATT Tool

Mercury Tools• QTP 8.2• Win Runner 7.5• Load Runner• Test Director 8.0

• Engineers / MCAs • Experience : 2 – 8 yrs

20 eCATT/ ABAP specialists (+ 6 freshers are undergoing training)

30+ System Testers with multiple skillset

20%

40%

30%

10%

eCATTQTPWinRunnerLoadRunner

Automated Testing Skillset contribution

Page 4: Presentation

>

www.infotechsw.com

Infotech SAP Capabilities

• 60 member SAP Team• Including 9 Certified functional consultants• Executed 2 full-life cycle implementation projects• Numerous version upgrade projects• ABAP/eCATT projects• Custom enhancements• Data migration projects• SAP Help Desk projects

Page 5: Presentation

>

www.infotechsw.com

• Requirements GatheringAnalyze the clients business processPrepare the requirements specifications & sample test dataGetting a sign-off from the customer

• Preparation of Test ScriptsRecord of test script for the business processes (by accessing client’s testing servers through VPN)Parameterize the test data in the scriptTest the scripts with given test data

• Test the business process onsiteThe test scripts are run again from client’s site and transported to production environment after

acceptance

Methodology

Page 6: Presentation

>

www.infotechsw.com

Sample Business Process

Page 7: Presentation

>

www.infotechsw.com

Company : United Technologies Research Center (UTRC) Project Name : ABAP Object Development & eCATTType : To develop Workflow scenarios involving creating CATT procedures, creating new Forms for SAP script, Data

conversion/BDC, web enablement of Reports through ITS, Interactive reports and classical reports.

Benefit to Customer(s) :•Low Costs due to using Infotech’s onsite-offshore services.•On time Delivery

Technologies : SAP R/3 4.6C , HR ModuleEffort ( Person hours) : 15000 approximatelyStart & End Date : July 2001 – Till dateHighlights:

The Objects developed for UTRC are related to Module Human Resource (HR), Travel Management (TM), and Material Management (MM).

•CATT procedures to test the functionality of transactions•ITS to web enable the Results Screen report and Modifying the Transactions in the Travel Management Module.•SAP Scripts to print the Employee Expense Report and also to print the Bar code for Trip Number.•BDC to upload the HR Master data•Interactive reports for a Supervisor to view his subordinates Trip Header level data and each trip’s detailed data.•Reports for Employee Expense Report to replace the Standard SAP Report for Result Screen, to display the List of Active/ Inactive Employees, to display the Material Purchase Order details, Pratt Travel Focal point reports etc.

CASE STUDIES

Page 8: Presentation

>

www.infotechsw.com

Mercury Products Capability

• Over 30 system testing engineers• Professionals with experience in

• Quick Test Professional 8.2• Win Runner 7.5• Load Runner

• Experience in Test Director 8.0

Page 9: Presentation

>

www.infotechsw.com

Company : Metro Group Information Technology Gmbh (MGI)Project Name : LOGOS - QTPType : To develop automation test scripts using QTP for regression testing of LOGOS

(LOGOS is a logistics application developed by Infotech on J2EE platform used by Metro Group Logistics)

Benefit to Customer(s) :• Huge savings in testing effort for MGI & MGL• Low Costs due to using Infotech’s onsite-offshore services.

Technologies : QTP 8.2, VB Scripting, Test Director 8.0Effort ( Person hours) : approx 6500 person hoursStart & End Date : May ’05 to Nov ‘05Highlights:

• The project involved identification of test cases & business scenarios to be automated by Infotech and sign-off of the requirement specifications by MGI/MGL• A QTP test framework containing re-usable functional resulting in faster turnaround of scripts.• The Framework also helps in easier maintenance of the scripts.• Integration with Test Director for storing scripts, test data and analysis of test results.

CASE STUDIES

Page 10: Presentation

>

www.infotechsw.com

Providing expert solutions

Delivering consistent quality

Building partnerships globally

businessimpactC R E A T I N G

our value proposition

Page 11: Presentation

>

www.infotechsw.com

All logos and trademarks used in this presentation are the property of their respective owners

Thank You