Presentación de PowerPoint · Portfolio Capacity; 2,5 MW. Interconnection Voltage: 13,8 kV....

3
Abril 2020 Strictly Private & Confidential

Transcript of Presentación de PowerPoint · Portfolio Capacity; 2,5 MW. Interconnection Voltage: 13,8 kV....

Abril 2020Strictly Private & Confidential

PV LA PAZ (CESAR) 2.5 MW Strictly Private & Confidential 2

PORTFOLIO OVERVIEWProject name Solar Plant Hageo

Portfolio Capacity 2,5 MW

Interconnection Voltage 13,8 kV

Distance to substation 0,5 km

G Horizontal 1902 (kWh/m2)

Aprox. 1st yr production 5,5 GWh/yr

Location Cotorra, Córdoba

Technology Poly – Tracker (single axis)

Land Lease 25 years (+ 5 extensión)

Connection Point Subestación Cotorra

SOLAR RADIATIONG Horizontal 2160 (kWh/m2)

Diffuse horizontal 837 (kWh/m2)

Direct normal 1814 (kWh/m2)

Reference point 10°22'7.64"N 73°10'29.84"O

RELEVANT DATESApproval reserve electrical connection capacity -ELECTRICARIBE February 2020

Electrical connection study approval -ELECTRICARIBE September 2020

Estimated connection approval – UPME Jun 2021

Ready To Build Jul 2021

Start of construction Jul 2023

COD January 2024

100% SPV PLANTA SOLAR

HAGEO

100%

Col

ombi

a

LOCATION CURRENT CORPORATE STRUCTURE

Col

ombi

aLa Paz

La Paz

Subestación La Paz

Selle

rTa

rget

s

PV VALENCIA (CESAR) 2 MW Strictly Private & Confidential 3

PORTFOLIO OVERVIEWProject name Solar Plant Hageo

Portfolio Capacity 2 MW

Interconnection Voltage 13,8 kV

Distance to substation 0,5 km

G Horizontal 2195 (kWh/m2)

Aprox. 1st yr production 4,9 GWh/yr

Location Valencia de Jesus, Cesar

Technology Poly – Tracker (single axis)

Land Lease 25 years (+ 5 extensión)

Connection Point Subestación Valencia

SOLAR RADIATIONG Horizontal 2195 (kWh/m2)

Diffuse horizontal 839 (kWh/m2)

Direct normal 1857 (kWh/m2)

Reference point 10°17'10.25"N 73°24'2.82"O

RELEVANT DATESApproval reserve electrical connection capacity -ELECTRICARIBE February 2020

Electrical connection study approval -ELECTRICARIBE September 2020

Estimated connection approval – UPME Jun 2021

Ready To Build Jul 2021

Start of construction Jul 2023

COD January 2024

100% SPV PLANTA SOLAR

HAGEO

100%

Col

ombi

a

LOCATION CURRENT CORPORATE STRUCTURE

Col

ombi

a

Valencia

Valencia

Subestación Valencia

Selle

rTa

rget

s