Prefeasibility...
Transcript of Prefeasibility...
Prefeasibility ReportFor Environment Clearance from MOEF under EIA
Notification Dated 14th September, 2006 as Amended
1. SUMMARY
-
-
Village - Ranijaroud
-
-
-
1. -
2. Geographical Co-ordinates LATITUDE
21°38'07.94"N 21°38'08.46"N 21°38'08.22"N 21°38'07.77"N 21°38'07.40"N 21°38'07.11"N 21°38'06.50"N 21°38'04.91"N 21°38'06.25"N 21°38'07.68"N
River -
Nalla - 2.75 km
Tanks - 1.00 km
Canal - 1.40 km
4. -
-
6. -
7. -
8. -
9. -
Reservoir - 2.00km Reservior towards south-west near
Lohari village area
Chhattisgarh
BL7BL8
81°58'57.54"E 81°59'00.29"E 81°59'00.24"E 81°58'54.27"E 81°58'54.59"E
Scientific mining of Limestone for proposed capacity of
maximum 5815.37 MT per year.
Project Proposal
Name of Mineral Mined
Flat Land devoid of vegitation
Altitude - Max. 278 aMSL and Min. 276 aMSL
Surface slop - Towards North-West
-
BL9BL10
District
BOUNDRY POINT
BL1BL2BL3BL4BL5BL6
1.000 hect. / Private Land
Toposheet No.- 64 G/14
Mineral Reserve (in tons)
3.
Topography of the area
Limestone
Maximum 5815.37 MT/year
Banjari Nala towards south-east
Pond towards south-east
Towards east near Rani jaroud
village area
-Name of River/ Nallahs /Tanks /Spring /
Lakes etc.
5.
No such area lies around the project area.
Pre - Feasibility Report
LONGITUDE
81°58'53.41"E 81°58'53.66"E 81°58'55.50"E 81°58'55.56"E 81°58'57.58"E
State
For Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
Ranijaroud Limestone Mine
Shashi kant Tiwari
Simga
Balodabazar-Bhatapara
Name of Company/Mine
Project
Tehsil/Taluka
Mining Lease Area & Type of Land
3.90 km (Jamuniya river at north-west) & 32.35
km ( Hasdoe river at east)
Geological Reserve (till 6m depth) - 118199.77 tons.
Recoverable Reserve (till 6m depth) - 58138.89 tons.
Name of Reserve Forest(s), Wild Life
Sanctuary/National Park
Rate of Production (in tons)
Signature of Project Proponent
_________________________________________________________________________________________________
2
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
10. -
11. -
12. -
13. -14. -
15. 1. 1 Hect.2. 0.595 Hect.3. 0.405 Hect.4. 0 Hect.5. 0 Hect.6. 0 Hect.
1 Hect.
7. 0.243 Hect.
8. 0.243 Hect.
9. 0.162 Hect.
16. -
17. -
18. -19. -20. -
Registered office
S/o. Shri Lallan Tiwari
Village/Post - Raipur
Tehsil - Raipur
District - Raipur
State - ChhattisgarhMine Office Village - RanijaroudE-MailProspecting Agency
Type of Activity
Utilities (Power, Water Requirement)
Manpower requirement 12 workers per day
Below 30 meter from surface levelNatural drainage towards North-West
Solid waste/Tailings
No Activity Zone on Mine Boundary
as per MMR 1961
-
Life of Mine
Mining Method
Ground Water table Intersection
Drilling/Blasting
Drainage Pattern/ Water Courses
10 years for the excavation of recoverable reserve of
58138.89 MTNo Blasting is proposed.
Open Cast Semi Mechanized
Dumping Area proposed within
proposed Statutory/mine BoundaryPlantation Area proposed over the
dump on dumping area
Break-up of Land Utilization Pattern
Total Area (2+3+4+5+6) =
Water Requirement & Source Requirement - 5 kilo litre per day, Source - Mine
pit/Setting tank, dug well and tube well of nearby village
within permited limits.
Open Cast Semi Mechanized Limestone Quarry Mining
Power- 5 HP
Water – 5 KLD for Domestic, Dust Suppression &
Plantation Purpose
NilNot Applicable
Top Soil & OB - total 5740.16 cum (Maximum yearly
generation @ 1291.98 cum). IBM approval: Date Not ApplicableCost of Project (Rs. Lacs)
NIL
Name and Address of the company /
Proponent
Shashi kant Tiwari
Shashi kant Tiwari
Rs. 20 lacsAny Other (Specify)
Total Lease AreaArea under mining pitsArea covered by statuary/mine Area covered by crusherArea Kept for storage of stoneUnused Area within Lease area
Signature of Project Proponent
_________________________________________________________________________________________________
3
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
2. INTRODUCTION OF PROJECT/BACK INFORMATION
Shashi kant Tiwari
S/o. Shri Lallan Tiwari
Village/Post - Raipur
Tehsil - Raipur
District - Raipur
State - Chhattisgarh
(ii) Brief Description of Nature of the Project
Identification of Project and Project Proponent
(a) Name of the Project: Ranijaroud Limestone Mine
(b) Project Proponent : Shashi kant Tiwari
(c) Postal /Correspondence Address of Project Proponent:
The proposed project is mining activity of Limestone with the name of 'Ranijaroud Limestone
Mine' which is situated at Khasra no. 112 & 113 at village Ranijaroud, tehsil Simga and district
Balodabazar-Bhatapara (C.G.). This site is 17.00 km away from district office Balodabazar-
Bhatapara. The quarry lease of Limestone mining was sanctioned for Lease period of 10 year from
14.02.2011 to 13.02.2021 which is subject to extension for 30 years from first commencement of
lease as per rule 38A of MMR 2015 as ammended to project proponent Shashi kant Tiwari
resident of Raipur district Raipur (C.G.). The granted lease area is 1.000 hectare and the proposed
maximum production capacity is 5815.37 t. per annum. The excavation of Limestone will be done
by Open Cast Semi Mechanized method without blast.
For compliance of Rule 24 and 63 to 66 of MMR 2015 proponent was submitted quarry plan
before mining authorities and the plan so submitted has been duly approved by the sanctioning
authority vide letter no. 1606/Kha.li./Tin-1/2017, Balodabazar dated 05/01/2018.
(i)
Proposed Limestone Deposit is located at village Ranijaroud, Tehsil Simga, District Balodabazar-
Bhatapara and state Chhattisgarh over land area of 1.000 ha. The proposed capacity of the project is
maximum 5815.37 tones/annum. Proposed land is Private non forest revenue land. Open Cast Semi
Mechanized without blast method of mining is the most suitable mining procedure for this mine. This
method of mining is used for highest productivity and the lowest cost of any of the broadly used
mining methods Brief description of the project is described below –
Signature of Project Proponent
_________________________________________________________________________________________________
4
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
(iii)
(iv)
(v)
Therefore application is being filed before jurisdictional DEIAA of district Balodabazar-Bhatapara
for getting permanent environmental clearance before starting of mining activity on granted
lease area.
The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is classified as
“CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification dated 14th
September 2006 as amended by Ministry of Environment, Forests and Climate Change, New Delhi
by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of DEIAA.
Need for the Project and its Importance to the Country and/or Region
Demand - Supply Gap
All the other necessary permission and noc’s has been taken by the proponent. Consent to
establish & operate/Air/Water clearances from CGCECB will also be taken if instructed by
jurisdictional DEIAA.
Mineral resources of any country are the “TREASURE-TROVE” of its national economy;
Chhattisgarh is one of the richest states in the country with its sparkling mineral wealth. The
Chhattisgarh State has enormous reserves of stone & its variety of varies grades spread over
mainly in Raipur, Raigarh, Balodabazar-Bhatapara, Janjgir-Champa, Durg, Rajnandgaon, Sarguja,
Surajpur, Balrampur and Bilaspur districts. Stone is basic material for civil building & civil
construction works. The project shall also provide additional revenue to State Government and
create direct and indirect employment opportunities, which will catalyze overall growth of the
State and improve the quality of life of the people living in the region and transform the region’s
economy from predominantly agricultural to significantly industrial and accelerate the pace of
regional development of region. There is huge demand of stone chip in the region as well as
throughout country for the use in construction of House, Canal, Dam, Pachri and other
infrastructure etc.
Stone Chip is basic raw material of civil construction works likes building, dams, roads, etc. for
construction of walls/base.
Chhattisgarh is a developing state in map of India. Considering the growth, State Government has
divided the state in 27 districts out of which 9 are recently declared districts. State Government,
is carrying on various Infrastructure development projects in all districts, like Pachri Nirman,
Dams, Over bridge on rivers/nalla, approach roads etc. in addition to these various power plants,
steel plant and cement plants in private sectors are under implementations, all above civil works
require stone boulders in different sizes which is in huge in demand. However supply of stone
boulder & chip in the above sectors are in huge shortage.
Demand - Supply Analysis
Exploiting this Limestone deposit is important for the country’s long term economic growth and
regional growth. By mining the deposit, the lessee acts as bridge and fills the gap between
demand and supply of Limestone in the market surrounding the area.
Therefore, a ready market is available for the proposed unit hence looking to the use and
demand of Limestone boulders which exist a good scope for the proposed project.
Signature of Project Proponent
_________________________________________________________________________________________________
5
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
(vi)
a) Direct Employment
S.N.
1
2
3
b)
3. PROJECT DESCRIPTION
(i)
(ii)
The details of the lease area are as under:
Ranijaroud
1.000 hect.
Village
Area(ha)
Indirect employment - Driver, cleaner for loader & dumper are the points were labors are
required. Moreover, manager, accountants will also be appointed as per need.
Skilled labours
The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is classified as
“CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification dated 14th
September 2006 as amended by Ministry of Environment, Forests and Climate Change, New Delhi
by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of DEIAA.
Location (map showing general location, specific location, and project boundary & project site
layout) with coordinates.
1
1
12
Mining mate (Qualified)
Tehsil
No of Workers
Labors will be required for various purposes like excavation of stone and loading of stone in
various vehicle, management, maintenance & development of mine, making & maintenance of
ramp, transportation of material and book keeping. Experienced personals will be employed as
per the requirement.
Type of Project (Including interlinked and interdependent projects, if any):
10
The mining establishment presents opportunities of employment to various posts under various
cedars viz. supervisory, skilled workmen, semiskilled workmen and unskilled workmen beside
casual workmen. However the maximum required labours at the site to justify the production of
stone at applied land are detailed below-
Taking standard O.M.S. to be one the strength of labour, a labour can work for 2 tons of mineral
in one sift of 8 hours a day. Considering this parameter the manpower need for project is –
Particulars
Chowkidars (Experienced)
Total
Simga
District / State
Employment Generation (direct and indirect) due to the Project
Balodabazar-Bhatapara / Chhattisgarh
Signature of Project Proponent
_________________________________________________________________________________________________
6
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
The Coordinates of the area are:
LATITUDE
21°38'07.11"N
21°38'06.50"N 21°38'04.91"N 21°38'06.25"N
21°38'07.68"N
(iii)
(iv)
Waste in Stone
in cum
258.4
258.4
258.4
258.4
258.36
258.39
258.39
258.39
258.39258.46
2583.98 cum
(v)
- It is proposed to carry out mining operation Open Cast Semi Mechanized method. The
development has been proposed for systematic and scientific mining.
81°59'00.29"E
BL5 21°38'07.40"N 81°58'57.58"E BL10 81°58'54.59"E
The total applied lease area is 1.000 hectare and total proposed maximum production capacity
will be 5815.37 TPA through Open Cast Semi Mechanized method of mining without blast.
Proposed production details during lease period are shown in below -
Size or Magnitude of Operation:
The site can be depicted in the toposheet number 64 G/14 of Survey of India. Study area map in
Khasra map, toposheet and site specific surface map is attached as Plate-1, Plate -2 and Plate -4
of enclosed mine plan respectively.
Details of alternate sites considered and the basis of selecting the proposed site, particularly
the environmental considerations gone into should be highlighted:
8th Year
7th Year
5813.715815.37
--
9th Year10th Year
Project description with process details (a schematic diagram/flow chart showing the project
layout, components of the project etc. should be given)-
-5813.71
5813.71
BOUNDAR
Y POINT
BL1
BL2BL3BL4
Top Soil & OB
in cum
Stone (ROM)
in tonne
Production During Plan Period
LONGITUDE BOUNDARY
POINT
5813.06
5813.71
21°38'07.94"N
21°38'08.46"N
-
It is naturally occurring rocks which is site specific due to its geological origin. Mining is site
specific project. This lease is being granted by the state govt., hence alternative site is not
applicable.
1291.98
6th Year -
1st Year
2nd Year
Total 58138.91 t 5740.16 cum
21°38'08.22"N 21°38'07.77"N
81°58'53.41"E
81°58'53.66"E 81°58'55.50"E 81°58'55.56"E
BL6
BL7BL8BL9
1291.98
3rd Year
4th Year
5th Year
5813.91
LONGITUDE
81°58'57.54"E
LATITUDE
5813.91
5813.91
5813.91
1291.98
Year
81°58'54.27"E 81°59'00.24"E
1291.98
572.24
Signature of Project Proponent
_________________________________________________________________________________________________
7
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
-
-
-
-
-
-
-
-
(vi)
Bench Height
3.00 mSoil + Mineral Bench
Raw material/consumables required along with estimated quantity, likely source, marketing
area of final products/s, Mode of transport of raw Material and Finished Product.
Bench Width along
the periphery of
mine3.00 m
No raw material is required for the mining of Limestone.
Marketing area: Limestone will be used in form of stone chips as building material in civil
constructions activity.
1st Quarry Bench
Mineral Bench 3.00 m
Bench Specification
-
The quarry will be worked in 2 benches 3m height x 3 m width in total during advancement of
mining the mine will be worked into 1.5m x 1.5 m sub-benches. But at the final stage of mining
the benches will be of 3m x 3m each as detailed in table below-
Bench Number
Resizing of stone manually
Drilling & Blasting : Not Applicable
Overall bench slope will be less than 450 with the horizontal.
The excavated mineral will be transported to the destination by tipper/dumper/trucks and
broken Limestone will be loaded manually or by loaders.
Loading by Excavator or Manually
Transportation by Tractor or Tipper
Flow chart of the Project
Loading will be done manually or with the help of excavator and J.C.B and the transporting will be
done by 4.5 tones tractor or 10 tones tippers.
Removal of Overburden & Top Soil
Various deduction in lease area were considered while measuring to arrive the " benchwise
available area for mining" i.e. Area occupied for maintaining statutory boundary and area
occupied by stone crusher (If Any).
Adequate slope and water sump will be gradually developed at the working pit.
Large size of stone boulders will be manually sized in to 10 to 12 inches as per the demand.
The excavation activity will be carried out till the depth of 6 m below general ground level or
occurrence of ground water table at the site which ever encountered earlier.
2nd Quarry Bench
7.50 m boundary will be left from the lease boundary around 4 sides (N, E, S, W) as barrier for
safety provisions, dumping of top soil & OB and afforestation.
Signature of Project Proponent
_________________________________________________________________________________________________
8
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
(vii)
Mine Site
Dust Suppression 2.00 KLD
Green Belt 2.00 KLD
Domestic
Sanitation & Drinking 1.00 KLD
Total 5.00 KLD
I)
II)
A)
B)
S.N. Power
requirement
1 5 HP
C)
Quantity for fuel will depend upon the usage of transportation vehicle and other machineries and
level of achievement of estimated production. Diesel will be outsourced from nearby diesel
pumps.
Source of Electricity:
For Green belt and dust suppression: Water will be made available from quarry mine pit which is
accumulated during the rainy season and shall be collected in settling tank for utilization in green
belt and dust suppression. However, if required, water might be supplied from tube well.
Domestic usage: Water will be supplied from tube well.
It is expected that the total water need is about 5 kilo litter per day in the mine. The details of
water balance of existing / proposed mining project are given below:
Availability of Water, its source, Energy/power requirement and source should be given -
Water Requirement:
Domestic Purpose
Total (KLD- Kilo Litter Per Day)
Electricity will be required for pumping of water and for administrative building & rest shelters.
The requirement of Power is estimated as under-
Fossil Fuels :
Electricity :
Process
The power requirement for the project will be met by electricity lines of Chhattisgarh State Power
Distribution Copany Limited available at village or nearby site area.
Particulars
Fuel is to be used in form of diesel for mining operations and running of tractors and other
transportation vehicles.
Water Balance of Project
Sources of water:
Energy & Power Requirement and Source
Signature of Project Proponent
_________________________________________________________________________________________________
9
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
(viii)
a)
b)
c)
a)
b)
Top Soil & overburden:
Mining Loss or Unusefull Waste Material:
Whatsoever quantity of top soil and overburden generated during the quarrying operation will be
stacked at the periphery of mine along the statutory/mine boundary in such manner that no
stacking will be done at the edge of quarry pit.
Further if the area for dumping of OB gets short then the land (adjoining or nearby the mine)
owned or controlled by the lessee will be utilised with due permission of district mining office for
dumping of excess OB. Such excess OB dump will be utilised in priority for reclamation at the time
of reclalation of mine.
Mine/Statutory boundary is 7.50 m wide in order to comply the rules of MMR1961. Out of this
mine/statutory boundary 3.0 m wide area from the edge of mine pit is proposed to left to comply
the provisions of MMR1961. Dumping area is proposed on balance outer 4.50 m wide area of
mine/statutory boundary i.e. after 3.0 m of no activity zone. Threfore saperate dumping area in
the mine is not proposed. Rather outer 4.50 meter wide area under mine/statutory boundary is
itself considered as dumping area. plantation is also proposed on the same dumping area over
the dump. Roads within mine area is also proposed to be constructed within mine boundary only.
Top soil & OB. 5740.16 cum will be generated in total at the rate of maximum 1291.98 cum per
year for period of approved mine plan.
All ROM mineral is useful and saleable. 2583.98 cum material may be generated or could not be
recovered as unusefull waste material or mining loss respectivelly during the plan period.
Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal –
Sub grade material:
Top Soil & overburden:
Waste:
No sub-grade mineral will be generated during excavation of stone. All ROM mineral will be used.
Only domestic effluent is expected to be generated which will be treated through septic tank
followed by soak pits.
No mining waste except from mining losses & OB will be generated during excavation of
Limestone. All ROM mineral will be used. Limestone is usable as building material hence saleable
therefore no mineral waste will be generated which requires their due management.
Solid Waste:
Liquid Effluent:
Selection of Dumping Site:
Signature of Project Proponent
_________________________________________________________________________________________________
10
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
c)
a) Top Soil & Overburden :
b) Waste & Subgrade Material :
4. SITE ANALYSIS
Connectivity
(i)
Form & Use : Flat, Non Forest, Revenue land.
Ownership : Private land.
Forest - Nil Area (ha)- Nil 1.000 Hect. Area
Nil
Nil
Nil
(iii) Agriculture land,
Further if the area for dumping of OB gets short then the land (adjoining or nearby the mine)
owned or controlled by the lessee will be utilised with due permission of district mining office for
dumping of excess OB. Such excess OB dump will be utilised in priority for reclamation at the time
of reclalation of mine.
Sub grade material:
Land form, Land Use & Land Ownership
Existing land use pattern: Existing land use pattern of the proposed mining area is given in below
table.
(i) waste land (Private),
Top Soil initially removed will be temprerorly stacked on mine boundary or other location within
lease area. Then whatsoever quantity of overburden & unusefull waste generated during the
quarrying operation will be spread at the periphery of mine along the mine boundary on specified
dumping areas. After proper dumping of OB and unusefull waste on mine boundary the
preserved Top Soil will be spreyed over the OB and/or unsuefull waste dump. Stack of dump OB,
waste & Top soil so developed is proposed to be stabilized the by grass plantation or cutting of
local bushes and dence plantation on it as per plantation programme so that spillage of dump
does not occur in the surroundings.
No need of planing for dumping management of waste and subgrade material as all ROM is
saleable except Top Soil and Overburden.
The area is approachable from district office Balodabazar-Bhatapara by fair weather road. The
area is 17.00 km from Balodabazar. The applied area is 2.50 km away from Suhela bus stand.
Hospital is available at Ranijaroud at 500 m/Suhela at 2.30 km distance. The nearest railway
station is at Bhatapara (11.40 km) (S.E.C.RLY) and Nearest active airport is Raipur (56.00 km).
Forest Area Non-forest Area
(iv) others (specify)
(ii) grazing land,
No sub-grade mineral will be generated during excavation of Limestone. All ROM mineral will be
used. Limestone is usable as building material hence saleable therefore no mineral reject will be
generated which requires their due management.
Manner of waste disposal & configuration:
Signature of Project Proponent
_________________________________________________________________________________________________
11
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
(ii)
(iii)
5. PLANNING BRIEF
(i)
(ii)
Proposed Land Use Pattern of Proposed Quarry Lease Area
1. 1 Hect.
2. 0.595 Hect.
3. 0.405 Hect.
4. 0 Hect.
5. 0 Hect.
6. 0 Hect.
1 Hect.
The road facility is already available which shall be used and properly maintained. Preference will
be given to local labor from nearby villages. Other requisite infrastructure as transport of mine
labors is available by way of jeep, two-wheeler. Medical facility is available for first aid at project
site.
Climate Data from Secondary Sources:
Topography:
Social Infrastructure Available
Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. at Suhela.
Proposed Land Use Planning
Planning concept: It is a Limestone mining project, for safe, scientific & systematic working to
follow the principles of safety & conservation of human health & mineral the planning for mining
of stone shall be governed by the approved Quarry Plan under Chhattisgarh Minor Mineral Rules,
2015 vide letter no. 1606/Kha.li./Tin-1/2017, Balodabazar dated 05/01/2018.
Population projection:
The project is very small in magnitude. The project will employ most of the workers from nearby
villages. There will not be any increase in population of the area due to the establishment of
project. However, few people from other area may migrate in this area for business
opportunities.
Area Kept for storage of stone
Total Area (2+3+4+5+6) =
Total Lease Area
Area under mining pits
Area covered by statuary/mine boundary
Area covered by crusher
Unused Area within Lease area
Planning concept (type of industries, facilities, transportation etc.) Town and country
Planning/Development authority Classification-
The climate of Balodabazar-Bhatapara district in general and the Simga in particular is
characterized by a hot summer and a well-distributed rainfall during the southwestern monsoon
season extending from end of June to October. The area has 4 well-defined seasons in a year. The
winter season commences from early December and continues up to the end of February,
summer season extends from March to early June, rainy season generally from mid-June to
September and the post-monsoon season from October to November.
The study area consists of essentially Flat land with a very small pit. Gentle slope towards North-
West, Maximum elevation of the lease area is 278 meters above MSL towards South-East while
the lowest elevation is 276 m in the North-Western part of lease area.
Signature of Project Proponent
_________________________________________________________________________________________________
12
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
7. 0.243 Hect.
8. 0.243 Hect.
9. 0.162 Hect.
(iii)
6. PROPOSED INFRASTRUCTURE
(i) Industrial Area (Processing Area)
Not Applicable
(ii)
Specific amenities / facilities are not required in this mining project. However the same can be
provided as per prescribed instructions.
Road & Connectivity:
Manpower Requirement:
Site Services:
No Activity Zone on Mine Boundary as per MMR 1961
Dumping Area proposed within proposed
Statutory/mine Boundary
Assessment of infrastructure demand (physical and social)
Plantation Area proposed over the dump on dumping
area
Site services are required per the statutory provisions i.e rest shelters, toilets, drinking water
facilities, safety appliances, and regular medical checkup facilities are suitably needs to be
provided for labors and their families. The health and safety of the employees is required to be
given first priority during the mining operation. Training program organize for first aid.
Specified first Aid station is needed to be maintained at the site office and the rest shelter as per
applicable statutory provision.
Office and stores is needed to be provided as per applicable statutory provision.
First aid:
Office and stores:
Amenities / Facilities:
The road facility is already available around 80 m from the site which shall be used and properly
maintained.
Apart from indirect manpower requirement for Driver, cleaner for loader & dumper, manager,
accountants; approx. 12 labours will be required directly for mining operation.
Other requisite infrastructure: Transport of mine labors is available by way of jeep, two-wheeler.
Medical facility is available for first aid at project site.
Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. are the other
requisites needed for mine operation and social facilitation.
Residential Area (Non Processing Area)
No residential area is proposed for the project except temporary rest shelters proposed for
labors.
Signature of Project Proponent
_________________________________________________________________________________________________
13
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
(iii)
No. OF SAPLING
(iv)
OCCUPATIONAL HEALTH AND SAFETY
Occupational Health and Safety works as follow-
1)
2)
Afforestation program shall be started with the commencement of mining operation with
simultaneous clearing of land by spreading of clay lumps along barrier of proposed lease
boundary. 2.5m X 2.5m spacing with 0.6m depth have been suggested for sapling pits on which
local species will be planted as the following manner-
SPECIES
Awareness program be conducted about likely occupational health hazards so as to have
preventive action in place.
Under the afforestation plan, plantation in nearby villages and connecting roads be undertaken.
The implementation for development of greenbelt will be of paramount importance as it will not
only add up as an aesthetic feature but will also act as a pollution sink. The species to be grown in
the areas should be dust tolerant and fast growing species so that a permanent greenbelt is
created. Plantation in the barrier zone and roads is necessary as these areas will contain fine
particulates resulting from mining operation and vehicle movement Plantation will also be carried
out as social forestry programme in village, school and the areas allocated by the Panchayat/State
authorities. Native plants like Neem, Peepal, Khejri and other local species will be planted. A
suitable combination of trees that can grow fast and also have good leaf cover shall be adopted
to develop the greenbelt.
Occupational Health and Safety are important. Periodic assessment of it will be useful. Identifying
workplace hazards, assessing risks to employee health and safety, are important. Health and
Safety points are also important in many of the environmental aspects of the workplace.
Social infrastructure
Year
1st Year
PROPOSED SITE
Along boundary of quarry area 135
For the social developmental program on the need base assessment some development program
will be undertaken by the project proponent i.e. development of or maintenance of urinals,
toilets, safety appliances & training program, confirming availability of pure and clean drinking
water, periodic health checkup program, transportation facility to labours and their children’s to
schools etc.
If/Where no plantation is possible within the mine due to rocky nature of lease area or top soil
has been already removed from boundary of mining area then plantation will be done on
transportation road or on the Government waste land as suggested/demarked by Gram
Panchayat/Nagar Panchayat/ local body will be done.
Green belt
Seesam, Bargad, Neem, Aam,
Pipal, etc.
Except dust generation there is no source which can show a probability for health related
diseases and proper dust suppression will control dust generation and dispersion.
Signature of Project Proponent
_________________________________________________________________________________________________
14
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
3)
4)
(v)
(vi)
(vii)
(viii)
A)
B)
S.N. Power
requirement
1 5 HP
C)
Drinking Water Management (source & supply of water):
Develop and implement training sessions for management, supervisors and workers on
health and safety practices and legislation;
Promote occupational health and safety within workers in mine and develop safer and
healthier ways of working;
Fossil Fuels :
Electricity :
Particulars
Domestic Purpose
Source of Electricity:
Fuel is to be used in form of diesel for mining operations, compressors and running of tractors
and other transportation vehicles. Quantity for fuel will depend upon the usage of transportation
vehicle and other machineries and level of achievement of estimated production. Diesel will be
outsourced from nearby diesel pumps.
Electricity will be required for pumping of water and for administrative building & rest shelters.
The requirement of Power is estimated as under-
The power requirement for the project will be met by electricity lines of Chhattisgarh State Power
Distribution Copany Limited available at village or nearby site area.
Industrial waste management: No industrial waste will be generated.
Power requirement & supply/source:
Drinking water is available in dug well and tube well at nearby village of the applied area which is
portable, pure and clean. It is also proposed to provide hand pump if needed in the lease area for
mitigating of drinking water, such hand pump will be arranged after taking statutory permission.
Sewerage System: No construction or sewage waste is expected from the mining process.
However the domestic waste from the toilets shall be given treatment through septic tank and
soak pit arrangement.
Signature of Project Proponent
_________________________________________________________________________________________________
15
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN:
8. PROJECT SCHEDULE AND COST ESTIMATES
A)
B) Estimated project cost of the project -
S.N. Amount in Lacs
1 7.00
2 1.00
3 10.00
4 1.00
5 1.00
20.00
9. CONCLUSION
Mining Machineries & Equipment’s and Crusher
Land Development & Establishment cost
Others
Total Cost of Project :
In any human activity there are always possibilities of finding various options. Project proponent has
decided to examine and adopt one such option that will be both environment friendly and best suited
for Limestone production. Various alternatives in terms of site, technology, and equipment are
considered. A final selection is thus arrived–
Likely date of start construction and likely date of completion (time schedule for project) –
Particulars
Land Cost (market value)
Administrative Building & Rest Shelters
No R&R plan is required as the mine area does not cover any habitation. Hence the mining
activity does not involve any displacement of human settlement. No public buildings, places,
monuments etc. exist within the lease area or in the vicinity of the mine lease area. The mining
operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact is
anticipated.
Impact of the stone mining will be positive, as it will upgrade the socio-economic status of local
inhabitants in the nearby areas by giving employments to poor people of nearby villages. Due to
this positive impact the living standard will increase and will lead to educational upliftment.
The proposed mining project will be started after obtaining Environmental Clearance of quarry
lease and order to enter in lease area by District Collector (Mining Branch). Consent to establish &
operate from CGCECB will also be taken if instructed by DEIAA.
Effect on Flora & Fauna:
Mining is restricted to very small area. No study have been conducted or record found on effect
on Floora & Fauna for mine area. However mining activity causes impact on flora and fauna due
to land degradation/deforestation etc.,
Signature of Project Proponent
_________________________________________________________________________________________________
16
Pre - Feasibility ReportFor Ranijaroud Limestone Mine, at Village - Ranijaroud
Tehsil- Simga & District- Balodabazar-Bhatapara, State- Chhattisgarh.
(a)
(b)
(c)
(d)
(e)
Date : / /2017
Place : Raipur
Shashi kant Tiwari
The Project is viable and environmental friendly as it’s a development project for the State &
Country.
Increased financial benefits accruing to state and central agencies by ways of taxes, royalties,
cesses etc.
Signature of the applicant
The Proposal is for the Environment Clearance of the Proposed Mine.
The quarry project will create local employment to the villagers and they will get employment
in nonagricultural season.
The Proposal does not require further Infrastructure facilities other than few Mining
Machineries.
Raipur
Signature of Project Proponent
_________________________________________________________________________________________________
17