Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications...

22
Pre-submittal Meeting Request for Qualifications 24 th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction Manager at Risk Services Project Number WS85290029-1 March 16, 2017, 1:30 pm

Transcript of Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications...

Page 1: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Pre-submittal Meeting

Request for Qualifications

24th Street Water Treatment Plant Rehabilitation 2017

Design Services

and

Construction Manager at Risk Services

Project Number WS85290029-1March 16, 2017, 1:30 pm

Page 2: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Welcome and Introductions

Cathie Rodman, Contracts Specialist

Design and Construction Procurement

[email protected]

602-534-5789

Shaw Chao, Civil Engineer III, Project Manager

Water Services Department

Raghu Nandan, Civil Engineer III - Team Leader

Water Services Department

Page 3: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Meeting Information

• Please sign-in

• Please hold questions until after the presentation

• This is your ONLY opportunity to ask the City Staff

questions

Page 4: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Agenda

Project Description

Scope of Work

Submittal Requirements

Selection Schedule

Questions?

Page 5: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Project Description

The 24th Street WTP is a conventional water treatment facility that has the capacity to treat 140 million gallons per day. The City anticipates the rehabilitation of the following areas to be included, which may or may not be all inclusive of what will be required for this project:

Main Switchgear and Other Electrical Equipment

Raw Water Inlet Pipelines

Flocculation Basins

Sedimentation Basins

Filter Valves

Concrete Structures

Junction Boxes

Sludge Blowdown Pipelines

Page 6: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

24th St WTP Site Map

Page 7: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Potential Rehab Items

Flocculation Basins Sedimentation Basins

Page 8: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Potential Rehab Items

Concrete Damage Example 1 Concrete Damage Example 2

Page 9: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Scope of WorkDesign Services

Conduct asset condition assessment and recommend a rehabilitation capital improvement

program for 24th Street WTP which will include scope items and cost estimates for the current

(2017), subsequent 4-year (2021), and 8-year (2025) rehabilitation projects.

Provide design services including, but not limited to, agency coordination, preparation of

preliminary, pre-final and final plans and consultation regarding the CMAR cost models and final

cost proposal, assistance in the bid evaluation and recommendation of contract award.

Construction Administration & Inspection Services

Provide construction administration and inspection services including, but not limited to, quality

control services during the course of construction, on-site examination of materials, equipment

and workmanship, coordinating special inspections for structural/mechanical/electrical work,

start-up assistance, operator training, and preparing/reviewing project documents (e.g.

correspondences, schedules, submittals, shop drawings, test data, project data, contractor

progress payments, change orders).

Page 10: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Scope of Work

CMAR Design Phase Services

Provide CMAR Design Phase Services including, but not limited to,

detailed cost estimating, constructability studies, long-lead procurement

studies, setting goals for SBE participation and assisting design team to

develop a list of all required Maintenance-Of-Plant-Operation (MOPO).

CMAR Construction Phase Services

Provide CMAR Construction Phase Services including, but not limited to,

scheduling and managing construction site operations, manage all

construction related contracts, quality controls, coordinating with various

agencies and utility companies, arranging for procurement of materials and

equipment, addressing all permitting requirements, and dealing with owner

issues.

Page 11: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Vendor Registration

Register in the Vendor Management System PRIOR TO SUBMITTING A

PROPOSAL.

New Requirement - The Vendor Number MUST be included on the

cover of the STATEMENT OF QUALIFICATIONS and on the BID

PROPOSAL PACKAGE/ENVELOPE.

New Firms - After Registering, the City will email a Vendor Number

within TWO DAYS.

How to Register Information is available at:

https://www.phoenix.gov/finance/vendorsreg

Page 12: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Design - Statement of Qualifications Criteria

A. General information (10 points)

B. Design Experience of the Prime Firm (20 points)

C. Construction Administration and Inspection Experience of the Prime

Firm (10 points)

D. Experience of Key Personnel and Subconsultants (20 points)

E. Project Understanding and Approach (30 points)

F. Overall Evaluation of the Firm and Its Perceived Ability to Provide

the Required Services (10 Points)

Page 13: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

CMAR - Statement of Qualifications Criteria

A. General information (10 points)

B. Experience and Qualifications of the Firm (25 points)

C. Experience of Key Personnel to be Assigned to this Project (25 points)

D. Understanding of the Project and Approach to Performing the

Required Services (30 points)

F. Overall Evaluation of the Firm and Its Perceived Ability to Provide the

Required Services (10 Points)

Page 14: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Statement of Qualifications Criteria SOQ Cover Letter

Firm name, vendor number, project title, and project number on the SOQ

cover sheet, cover letter, and submittal package.

Evaluation Criteria - including project organizational chart

Additional Content – including resumes, photos, charts, or other information

MAXIMUM Pages Permitted = 12 pages

+ Evaluation Criteria - including organizational chart

+ Additional Content - resumes or other information

+ Photos, charts / graphs or other evaluation content

= 12 MAXIMUM pages permitted

Page 15: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Statement of Qualifications Criteria

What WILL be Counted:• Each side of a page with criteria information will be counted.

• Pages that have photos, charts, and graphs will be counted toward maximum number of pages.

What WILL Not be Counted (UNLESS they include information that may be considered by the selection panel):

• Cover letter,

• front and back covers,

• Table of Contents and

• tab dividers

Page 16: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Statement of Qualifications Criteria

Submit 6 Copies for each SOQ that the firm is interested in

providing services for.

SOQ is Due:

12:00 Noon, local time

Friday, April 7, 2017

Phoenix City Hall

200 West Washington Street, 6th Floor

Submittal Box

Page 17: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Grounds for Disqualification

Receipt of SOQ after the specified cut-off date and time

Too few copies of the submittal

Deposit of SOQ in the wrong location

Violating the “Contact with City Employees” policy

Page 18: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

SOQ Due Date

12:00 Noon, local time

Friday, April 7, 2016

Phoenix City Hall

200 W. Washington Street

6th Floor, Submittal Box

Page 19: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Selection Schedule

Design Services SOQ’s Due April 7, 2017

Firm Notified for Award April 2017

Scope Meeting May 2017

Construction Manager At Risk SOQ’s Due April 7, 2017

Firm Notified for Award April 2017

Scope Meeting May 2017

Page 20: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Street Transportation Procurement Section Webpage

https://www.phoenix.gov/streets/procurement/current-opportunities

Notifications (if any)

Plan Holder List

Pre-submittal Power Point Presentation

Pre-submittal Sign-in sheet

Award

It is your responsibility as an RFQ holder to determine, prior to submittal, if notification letters have been issued

Page 21: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

Questions After Today

Email Your Questions To:

Cathie Rodman, Contracts [email protected]

Page 22: Pre-submittal Meeting Request for Qualifications...Pre-submittal Meeting Request for Qualifications 24th Street Water Treatment Plant Rehabilitation 2017 Design Services and Construction

OPEN FOR QUESTIONS

&

THANK YOU FOR ATTENDING