ENERGY EFFICIENCY FINANCING IN
CHINA : CHALLENGES, WAY
FORWARD AND ADB EXPERIENCE
Pradeep Perera
Principal Energy Specialist
East Asia Energy Department
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
2/20
Chinas Energy Sector in Global Context
USA
Japan
OECD Europe
Other OECD
China
IndiaBrazil
Russia
Other Non OECD
World Primary Energy
Consumption in 2009 ( MTOE) China is the largest energy
consumer in the world with 19%share in global energyconsumption.
Chinese Energy Consumption isincreasing at an annual rate of 8%.
Coal contributes to over 65% ofprimary energy demand.
China is a net energy importer and10% of its primary energy supply (mainly oil but increasingly coaland gas is imported.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
3/20
Energy Efficiency in China
Chinas energy intensity measured in energy consumption per unitoutput is more than double the world average and OECD average.
However, Chinas energy intensity has reduced by 60% since 1990
and is less than India, Russia and Middle East
There has been a rapid decrease since 1990 to 2000, slight increasefrom 2000 2005 and again decline since 2005.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
4/20
Importance of Energy Efficiency
to Emission Reduction
China need to provide 30 % of global emission reductionsrequired for 450 ppm case.
End user efficiency improvement, fuel switching and supply sideefficiency improvement are expected to provide 57% of theseemission reductions.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
5/20
Chinas Energy Consumption Mix
315
71
158 276
139
35
112
165
727
Housing Commercial Buildings Transport Iron & Steel Chemical Aluminum Cement Other Indusry
Industrial Energy Consumption
Industrial Sector contributes to 57% of final energyconsumption in China.Iron& Steel ( 22%), Petro chemical (11%) , cement ( 9%)dominate the energy consumption.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
6/20
Chinas Strategy for Energy Efficiency
Improvement 2006 - 2010
Set a National target of 20% improvement inenergy intensity compared to 2005.
Focused on Industrial Sector & 1000
Largest energy consuming enterprises. Provinces were given energy intensity targets
and responsibility for implementing nationalenergy conservation program.
Provinces were held accountable forachieving the targets.
Progress was tracked annually.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
7/20
Organizational Structure for
Supervicing energy savings in China
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
8/20
Chinas 1000 Key Enterprise Program
Covered the 1,000 largest energy consuming enterprises. ( Morethan 180,000 tce per year)
The Provincial government expanded the coverage by loweringthe threshold .
Enterprises are required to enter into legally binding contractswith the government for implementing energy saving measures.
Undertaking Energy Audits and identifying energy savingopportunities
Establishing enter price wide EMS systems with dedicated staff.
Government monitoring of enterprise specific energy savingmeasures.
Undertaking energy saving investments by replacing inefficientequipment and processors
Quantitative targets for energy consumption was set based onindustry wide benchmarks
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
9/20
Energy Efficiency Improvement MeasuresCont.
Fiscal Incentive Program for energy efficiencyinvestments @ RMB 200 ( $ 29) RMB 250 ( $ 36)per tce of energy saved.
This amount o 10% - 20% of investment cost. Limited to investments resulting in 10,000 tce.
Provinces came up with supplementaryschemes to cover smaller investments.
Central government allocated over 100 billionRMB ( $ 15 billion) and Provincial governments $RMB 50 billion ( $ 7.5 billion) for these schemes.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
10/20
Energy Efficiency Improvement
Measures Cont. Elimination of backward industrial capacity.
Focused on thermal power, iron & steel, cement,aluminum and coke industries
Replacing small with large
Additional electricity surcharges for backward plants.
Subsidies to mitigate transition cost and incentives forearly elimination
Revoking production permits & credit squeezing
Industrial Technologies are classified as
encouraged, permitted, restricted and eliminated. Energy Efficiency Assessment of new capacity
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
11/20
Developing Energy Service Industry Third party service providers
o Energy audits, consulting & technology dissemination
o Energy efficiency project design and appraisal
o Energy efficiency project investment & managementunder EPC contracts. ( ESCO model)
o Undertaking monitoring & verification of energy savings
Chinas ESCO industry is the largest in the worldwith over $ 4.5 billion EPC contracts resulting inenergy savings of over 10 million tce in 2010.
Over 75% ESCO investments are in industrialsector and over 60% of the contracts ESCO wasresponsible for mobilizing the investments.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
12/20
Results achieved 2006 2010 Chinas energy intensity has improved by 19.1% compared to
2005.
The total energy savings achieved as a result of EE investmentswas 340 million tce. ( i.e. 5 3 % of energy savings required for19.1% improvement in energy intensity).
More than 47% of energy intensity improvements are due tostructural changes in the economy.
Total investment mobilized was RMB 844 billion ( $ 130 billion).
Central government : RMB 102 billion( US $ 16 billion)
Local government : RMB 48 billion ( US $ 7.5 billion).
Host Enterprises : RMB 169 billion ( US $ 27 billion)
Commercial Banks : RMB 488 billion ( US $ 77.5 billion)
ESCO Industry : RMB 20.5 billion ( US $ 3.25 billion)
International Funding : RMB 18 billion( US $ 3 billion)
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
13/20
Results Achieved 2006 - 2010
Sustainable institutional framework wasestablished for achieving further energy savings.
Industry Buildings Transport
Most of the Energy Savings 56%were achieved in Industrial Sector.
Targets were achieved mainly usingadministrative mechanisms withstrong top- down approach.
Energy saving performancecontracts provides a platform forgovernment to closely monitor the
energy consumption in main energyconsumers.
There is less reliance on marketforces such as energy pricing andcarbon pricing
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
14/20
Challenges of Financing EnergyEfficiency during 2006 -2010
Most of the bank financing was for capacity expansionprojects .
Small Scale Retrofit Projects and ESCO projects finddifficult to access bank financing.
Banks as well as enterprises consider transaction costs
are too high for EE retrofit projects. Banks demand collateral and enter prices are reluctant
to provide collateral for EE retrofit projects.
Low standalone collateral value of EE retrofit assets.
Difficulty in ring fencing the cash flows associated with
EE retrofit projects. Preference of Chinese banks to finance large projects
and thresholds on minimum project size.
Poor credit ratings of SMEs and ESCOs.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
15/20
Targets for Energy EfficiencyImprovement in 12th FYP 2011- 2015
China has set a target of 16% of improvement ofenergy intensity and 17% improvement of carbonintensity over 2010.
The measures initiated in the previous program will
be implemented with increased coverage. Supervision and Monitoring mechanisms to verify
energy savings will be strengthened.
Development and promotion of new EE technologies.
Further Developing energy performance contracting.
Instituting corporate energy management systems inkey enterprises.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
16/20
Provincial Energy Intensity
Improvement Targets under 12 FYP
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
17/20
Strategy for Energy Efficiency
Improvement in 12th FYP
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
18/20
ADBs Contribution to Energy
Efficiency Improvement in China
ADBs energy efficiency investments focused on the threeprovinces having the largest energy consumption in China. (Shangdong, Hebei and Guangdong) .
ADBs ability to provide low cost funds with long grace andrepayment period enabled the establishment of revolving
fund to provide sustainable financing.
ADBs first energy Efficiency Project in Guangdong,approved in 2008.
ADB has supported 19 SME projects.
Mobilized RMB 1.3 billion ( $ 200 million).
Achieved energy savings of 275,000 tce.
The second round of subprojects utilizing the revolving fundis about to commenced.
Capacity building on energy saving monitoring and industrialpolicy formulation for energy conservation.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
19/20
ADBs Response : Hebei & Shangdong
Energy Efficiency Projects
ADB has approved Shangdong and Hebei Energy EfficiencyLoans in 2011.
Use similar structure to Guangdong but make effectivepartnerships with middle level commercial banks.
Focus on Medium to Large scale enterprises for Industrialprocess conversion projects.
Provides Capacity Building for Energy Manager Training inShangdong.
A GEF Project for remote monitoring of energy savings, thirdparty M&V agency capacity building and energy management
system certification in Hebei Province is under preparation. The first round of projects are expected to realize energy savings
of around 250,000 tce each in Shangdong and Hebei.
ADB intend to structure future energy efficiency projects withenhanced leveraging and risk sharing with commercial banks.
-
7/31/2019 Pradeep Perera - Energy Efficiency Financing in China Challenges, Way Forward and ADB Experience
20/20
Issues and Challenges for next 5 years. China intend to Mobilize RMB 1,500 billion ( $ 240
billion) for EE investments during 12th FYP to achieveenergy savings of 670 mtce.
This involves scale up of Provincial energy efficiencyprograms and implementation and monitoring capacitywill be an issue.
Channeling the required financing from the banks toenterprise for EE investments require special effortsand incentives.
Need for more market based approaches such asemission trading, sectoral trading of energy efficiency
and tradable energy efficiency certificates. Further expanding the capacity of energy service
industry.
Further expanding the enterprise energy managementcapacity.