PPP Projects at a Glance. Madhya Pradesh
Transcript of PPP Projects at a Glance. Madhya Pradesh
PPP Cell, Government of Madhya Pradesh
Status-Wise Report of PPP Projects as on 28-12-2010.
(All value in Indian Rupee Crores)
S.
No. Status Project
PPP
Type Location Sector Cost Department Agency Remarks
1 Pipeline
BioTech Park on 181 acres (Common
research facilities/
Residential/Commercial)
boot Indore Biotech 200 BioTechnology BioTechnology
TA : Deloitte. RFQ
invited, only 2
offers submitted
2 Pipeline Logistics Park Powerkheda (115 acres) boot Hoshangabad Industry 150 Food & Civ
Supp MPWLC
RFP invited by
Mar. No bids recd
3 Pipeline Van Vihar Ph-II on 350 ha bot Bhopal Tourism 25 Forest Forest RFP for TA
submitted to Deptt
4 Pipeline Food Park boot Bhopal Food
Park 54.43
Horti & Food
Proce MP AGRO
TA : E&Y. RFQ
done, 4 cos
shortlisted. RfP
being finalised
5 Pipeline Kalpana Nagar Swimming Pool O&M omt Bhopal Urban 1 Housing & Env CPA RFP floated
6 Pipeline Convention Centre on Airport Road bot Indore industry 0 Housing & Env IDA TA : Deloitte
7 Pipeline Fitness Centre O & M of Prakash
Swimming Pool omt Bhopal Urban 1 Housing & Env CPA RFP floated
8 Pipeline Medical Hub at vill Tigaria Badshah on
194.727 hect boot Indore Health 2000 Housing & Env IDA
TA Pre-bid on 22
Jun 2010. TA : PWC
9 Pipeline Logistics Hub at Talavali Chanda on
151.845 hect boot Indore Industry 500 Housing & Env IDA
TA Pre-bid on 22
Jun 2010. TA :
E&Y
10 Pipeline Sports Complex on 42.140 hect spread
over 3 locations bot Indore Sports 500 Housing & Env IDA
TA Pre-bid on 22 Jun 2010. TA :
PWC
11 Pipeline ISBT on 10 hect boot Indore Urban 40 Housing & Env IDA
TA Pre-bid on 22
Jun 2010. TA :
Grant Thornton
12 Pipeline Minerals-based SEZ on 250 acres boot Hargarh,
Jabalpur SEZ 200 Industries
AKVN,
Jabalpur
TA : Feedback
Ventures. IIPDF
approved
13 Pipeline Agro-based SEZ on 248 acres boot
Umariya-
Dungariya,
Jabalpur
SEZ 200 Industries AKVN,
Jabalpur
TA : Deloitte. RFQ
being finalised
14 Pipeline Jhabua-Jobat-Zeerpanya-Kukshi 95.50
kms bot Road 162.45 PWD MPRDC
15 Pipeline Betul-Sarni-Parasiya 124.10 kms bot Road 243.24 PWD MPRDC
16 Pipeline Tikamgarh-Maheroni 15.7 kms bot(t+a) Road 29.38 PWD MPRDC SLEC on 13-Dec-
10
17 Pipeline Semaria-Manikpur 16.36 kms bot(t+a) Road 34.83 PWD MPRDC SLEC on 13-Dec-
10
18 Pipeline Mandsaur-Pratapgarh 11.526 kms bot(t+a) Road 19.45 PWD MPRDC SLEC on 13-Dec-
10
19 Pipeline Thandla-Limdi 31.18 kms bot(t+a) Road 56.16 PWD MPRDC SLEC on 13-Dec-10
20 Pipeline Hata-Fatehpur-Rajpura-Solapuir-Bajna-
Dargawon 64.42 kms bot(t+a) Road 100.25 PWD MPRDC
SLEC on 13-Dec-
10
21 Pipeline Deharda-Ishagrah 32.93 kms bot(t+a) Road 50.57 PWD MPRDC SLEC on 13-Dec-
10
22 Pipeline Damoh-Bahtiyargrah-Hirapur 69.60 kms bot Road 125.71 PWD MPRDC
23 Pipeline Sarangpur-Akodia-Shujalpur 39.86 kms bot Road 68.38 PWD MPRDC SLEC on 13-Dec-
10
24 Pipeline Rau-Mhow-Mandleshwar 74.40 kms bot Road 181.5 PWD MPRDC
25 Pipeline Badwani-Palsod-Sendhwa 56.89 kms bot(t+a) Road 103.99 PWD MPRDC SLEC on 13-Dec-
10
26 Pipeline Guna-Ashoknagar-Ishagarh 76.15 kms bot Road 108.5 PWD MPRDC
27 Pipeline Sendhwa-Khetia 57.3 kms bot(t+a) Road 101.19 PWD MPRDC SLEC on 13-Dec-
10
28 Pipeline Bhopal-Berasia-Sironj 106.9 kms bot Road 181.39 PWD MPRDC
29 Pipeline Khandwa-Dehtalai-Burhanpur 127.25
kms bot Road 234.25 PWD MPRDC
SLEC on 13-Dec-
10
30 Pipeline Water-based Tourism activites on Indira
Sagar Dam bot
Vill
Hanvantiya,
Khandwa
Tourism 0 Tourism MPTDC
31 Pipeline MLP at Old Bus Stand Kampoo (731.25
Sq Mts and 2027.96 Sq Mts) boot Gwalior Urban 18.55 UADD GMC
TA : CRISIL.
IIPDF approved
32 Pipeline MLP In front of Nigam Shopping
Complex Daulat Ganj (300.00 Sq Mts) boot Gwalior Urban 8.2 UADD GMC
TA : CRISIL.
IIPDF approved
33 Pipeline Bus Terminals (3) boot Bhopal Urban 43.6 UADD BMC
Feasibility report
submitted. IIPDF
approved. RFP
being prepared
34 Pipeline
Parking Cum Commercial at Gandhi
Mkt, Maharaj Bada for 300 cars, 252 shops relocation. (5,228 Sq. Mt.)
boot Gwalior Urban 50 UADD GMC
5 bidders
shortlisted. HC ordered status quo
35 Pipeline
Hospital Project at Old Nigam Work
Shop, Dholi Bua ka Pull (2330.60 Sq
Mts)
boot Gwalior Health 30.3 UADD GMC
TA : CRISIL.
IIPDF approved.
RFQ docs prep
36 Pipeline PPP Projects exploration at select MCs
in MP 11 cities Urban 150 UADD Project Utthaan
TA : CRISIL. Feasibility rpt
submitted. (Jbp,
Ujjn, Rat, Khw,
Dws, Bur, Sat, Sag,
Rew, Kat, Sin)
37 Pipeline Multi Level Parking at New Mkt bot Bhopal Urban 51 UADD BMC Feasibility report
under approval
38 Pipeline ADB Pilot - 24x7 and NRW Water omt Bhopal Water 10.96 UADD BMC RFQ shrotlisting
reduction done. RFP last date
02-feb-11
39 Pipeline Commercial Cplx construction and
O&M of Bus terminal boot Rewa Urban 20 UADD RMC
RFP being
finalised
40 Pipeline
Reduction of Non-Revenue Water and
Improvement of Water Supply Services
in Bhopal
bot Bhopal Water 246.15 UADD BMC TA appointed :
CRISIL
41 Pipeline Multi Level Parking at M.P. Nagar bot Bhopal Urban 38.67 UADD BMC
TA appointed.
Feasibility report
submitted
42 Construction Eco-tourism park at Arnia near Sonkatch
(4.5 Hect) bot
Arnia, Distt.
Dewas Tourism 2 Forest MPEDB
C A signed
19/05/2010
43 Construction Parking cum Logistics Hub at
Mandideep for 500 trucks boot
Mandideep,
near Bhopal Industry 35 Industries AKVN, Bhopal
Awarded in Jul 08,
Premium 3 crs
44 Construction Bhind-Mihona-Gopalpur 50.86 kms bot Road 82.89 PWD MPRDC VGF 31.71
45 Construction Jaora-Nayagaon 4-lane 127.81 kms bot Road 425.71 PWD MPRDC
46 Construction Sagar-Damoh 68.81 kms bot Road 116.5 PWD MPRDC VGF 44.28
47 Construction Lebad-Narayanpura-Digthan-Billod-
Manpur Road 34.30 kms bot Road 206.53 PWD MPRDC
C A signed on
04/05/2010
48 Construction Satna-Chitrakoot Road 74.13 kms bot Road 124.25 PWD MPRDC C A signed on
06/05/2010
49 Construction Ujjain-Unhel-Nagda-Ghiloda Road
95.22 kms bot Road 194.79 PWD MPRDC
C A signed on
06/05/2010
50 Construction Indore-Ujjain 4 lane 48.85 kms bot Road 232.94 PWD MPRDC
51 Construction Damoh-Jabalpur 98.90 kms bot Road 212.13 PWD MPRDC VGF 82.71
52 Construction Lebad-Jaora 4 lane 125 kms bot Road 589.31 PWD MPRDC
53 Construction Bina-Khimlasa-Malthon 39.42 kms bot Road 69.11 PWD MPRDC VGF 26.27
54 Construction Bhopal bypass 4 lane 52 kms bot Road 221.62 PWD MPRDC Agreement
Terminated
55 Construction FOBs bot Rau, nr Urban 3 Rau Mun. Rau Mun. Edward (Divn of
Indore Council Council Swiift Intermedia
Convergence,
Indore.
Rs.20,50,000/-
56 Construction
Sports City with Cricket/ Hockey/
Football/Indoor/Aquatic/Admin
Block/Hostel on 50 acres plus Star
Hotel/Golf/Residential/Commercial
(Total 172 acres)
boot Satgadhi Vill,
Bhopal Sports 900
Sports and
Youth Welfare
Sports and
Youth Welfare Premium 18.10 crs
57 Construction Check-Post barriers at entry points of
MP bot Multiple Transport 1094 Transport Transport
TA : MPRDC.
Concessionaire
selected
58 Construction Water supply augmentation and 24x7
supply bot Shivpuri Water 65 UADD
Nagar Palika
Parishad
Shivpuri
Rs. 15.4/KL.
Financial Closure
achieved - IDBI
Bank. Drawings
submitted for
approval
59 Construction Water supply augmentation and 24x7
supply bot Khandwa Water 105 UADD KMC
Rs. 11.95/KL.
Intake Well
construction start -
23/03/10. Clear Water Feeder Main
construction start-
25/03/10.
60 Construction Multi-Level Parking at Indore (7 sites) boot Indore Urban 14 UADD IMC
61 Completed Rewa-Shahdol-Amrakantak 247 kms bot Road 111.27 PWD MPRDC
62 Completed Dewas-Ujjain-Badnagar-Badnawar
98.26 kms bot Road 49.93 PWD MPRDC
63 Completed Satna- Maihar-Umaria 141 kms bot Road 53.29 PWD MPRDC
64 Completed Hoshangabad-Harda-Khandwa 186 kms bot Road 81 PWD MPRDC
65 Completed Bhopal-Dewas 142.6 kms bot Road 426.64 PWD MPRDC
66 Completed Mandsaur-Sitamau (upto Rajasthan
border) 44 kms bot Road 42.34 PWD MPRDC
Toll started on 05
Feb 2009
67 Completed Hoshangabad-Piparia-Pachmarhi 126
kms bot Road 57 PWD MPRDC
68 Completed Indore-Edelabad 203 kms bot Road 124.05 PWD MPRDC
69 Completed Jabalpur-Narsinghpur-Piparia 140 kms bot Road 74.96 PWD MPRDC
70 Completed Ujjain-Jhalawad 134 kms bot Road 66.7 PWD MPRDC
71 Completed Matkuli-Tamia-Chhindwara 112 kms bot Road 98.43 PWD MPRDC
74% completed.
Toll started on 19
March 2010 on
33.38 km
72 Completed Chandrapur-Alirajpur-Kukshi-Badwani
100 kms bot Road 63.02 PWD MPRDC
92% completed.
Toll started on 18
Aug 2009 on 41
km
73 Completed Seoni-Balaghat-Gondia 114 kms bot Road 59.8 PWD MPRDC
74 Completed Raisen-Rahatgarh 101.40 kms bot Road 57.72 PWD MPRDC
75 Completed Bus stops for city service. 200 sq. ft.
advt per stop (100 nos) boot Bhopal Urban 2 UADD BMC
Awarded in Sept
08, Rs. 1.24 crs
premium, 4 equal
annual instalments.
4 months
construction. 5 yr
concession
76 Completed Toilets with advt rights (36) boot Bhopal Urban 3 UADD BMC
Awarded, Premium
7.87 crs. in 14
annual instalments.
77 Bidding Eco-Tourism Park (7 hectares) bot Rewa Tourism 10 Forest MPEDB RFP issued
78 Bidding Bina-Kurwai-Sironj 57.10 kms bot Road 91.72 PWD MPRDC VGF 36.68 crs
79 Bidding Food Park boot Harda Food
Park 57.07
Horti & Food
Proce MPAGRO
TA : E&Y. RFQ
done, 4 cos
shortlisted. RfP
being finalised
80 Bidding Food Park boot Ratlam Food
Park 63.25
Horti & Food
Proce MPAGRO
TA : E&Y. RFQ
done, 4 cos
shortlisted. RfP
being finalised
81 Bidding ADB Pilot - 24x7 and NRW Water
reduction omt Gwalior Water 0 UADD GMC
RFQ shrotlisting
done.
82 Bidding ADB Pilot - 24x7 and NRW Water
reduction omt Indore Water 13.94 UADD IMC
RFQ shrotlisting
done. RFP last date
15-jan-11