PPP Projects at a Glance. Madhya Pradesh

7
PPP Cell, Government of Madhya Pradesh Status-Wise Report of PPP Projects as on 28-12-2010. (All value in Indian Rupee Crores) S. No. Status Project PPP Type Location Sector Cost Department Agency Remarks 1 Pipeline BioTech Park on 181 acres (Common research facilities/ Residential/Commercial) boot Indore Biotech 200 BioTechnology BioTechnology TA : Deloitte. RFQ invited, only 2 offers submitted 2 Pipeline Logistics Park Powerkheda (115 acres) boot Hoshangabad Industry 150 Food & Civ Supp MPWLC RFP invited by Mar. No bids recd 3 Pipeline Van Vihar Ph-II on 350 ha bot Bhopal Tourism 25 Forest Forest RFP for TA submitted to Deptt 4 Pipeline Food Park boot Bhopal Food Park 54.43 Horti & Food Proce MP AGRO TA : E&Y. RFQ done, 4 cos shortlisted. RfP being finalised 5 Pipeline Kalpana Nagar Swimming Pool O&M omt Bhopal Urban 1 Housing & Env CPA RFP floated 6 Pipeline Convention Centre on Airport Road bot Indore industry 0 Housing & Env IDA TA : Deloitte 7 Pipeline Fitness Centre O & M of Prakash Swimming Pool omt Bhopal Urban 1 Housing & Env CPA RFP floated 8 Pipeline Medical Hub at vill Tigaria Badshah on 194.727 hect boot Indore Health 2000 Housing & Env IDA TA Pre-bid on 22 Jun 2010. TA : PWC 9 Pipeline Logistics Hub at Talavali Chanda on 151.845 hect boot Indore Industry 500 Housing & Env IDA TA Pre-bid on 22 Jun 2010. TA : E&Y 10 Pipeline Sports Complex on 42.140 hect spread over 3 locations bot Indore Sports 500 Housing & Env IDA TA Pre-bid on 22 Jun 2010. TA : PWC

Transcript of PPP Projects at a Glance. Madhya Pradesh

Page 1: PPP Projects at a Glance. Madhya Pradesh

PPP Cell, Government of Madhya Pradesh

Status-Wise Report of PPP Projects as on 28-12-2010.

(All value in Indian Rupee Crores)

S.

No. Status Project

PPP

Type Location Sector Cost Department Agency Remarks

1 Pipeline

BioTech Park on 181 acres (Common

research facilities/

Residential/Commercial)

boot Indore Biotech 200 BioTechnology BioTechnology

TA : Deloitte. RFQ

invited, only 2

offers submitted

2 Pipeline Logistics Park Powerkheda (115 acres) boot Hoshangabad Industry 150 Food & Civ

Supp MPWLC

RFP invited by

Mar. No bids recd

3 Pipeline Van Vihar Ph-II on 350 ha bot Bhopal Tourism 25 Forest Forest RFP for TA

submitted to Deptt

4 Pipeline Food Park boot Bhopal Food

Park 54.43

Horti & Food

Proce MP AGRO

TA : E&Y. RFQ

done, 4 cos

shortlisted. RfP

being finalised

5 Pipeline Kalpana Nagar Swimming Pool O&M omt Bhopal Urban 1 Housing & Env CPA RFP floated

6 Pipeline Convention Centre on Airport Road bot Indore industry 0 Housing & Env IDA TA : Deloitte

7 Pipeline Fitness Centre O & M of Prakash

Swimming Pool omt Bhopal Urban 1 Housing & Env CPA RFP floated

8 Pipeline Medical Hub at vill Tigaria Badshah on

194.727 hect boot Indore Health 2000 Housing & Env IDA

TA Pre-bid on 22

Jun 2010. TA : PWC

9 Pipeline Logistics Hub at Talavali Chanda on

151.845 hect boot Indore Industry 500 Housing & Env IDA

TA Pre-bid on 22

Jun 2010. TA :

E&Y

10 Pipeline Sports Complex on 42.140 hect spread

over 3 locations bot Indore Sports 500 Housing & Env IDA

TA Pre-bid on 22 Jun 2010. TA :

PWC

Page 2: PPP Projects at a Glance. Madhya Pradesh

11 Pipeline ISBT on 10 hect boot Indore Urban 40 Housing & Env IDA

TA Pre-bid on 22

Jun 2010. TA :

Grant Thornton

12 Pipeline Minerals-based SEZ on 250 acres boot Hargarh,

Jabalpur SEZ 200 Industries

AKVN,

Jabalpur

TA : Feedback

Ventures. IIPDF

approved

13 Pipeline Agro-based SEZ on 248 acres boot

Umariya-

Dungariya,

Jabalpur

SEZ 200 Industries AKVN,

Jabalpur

TA : Deloitte. RFQ

being finalised

14 Pipeline Jhabua-Jobat-Zeerpanya-Kukshi 95.50

kms bot Road 162.45 PWD MPRDC

15 Pipeline Betul-Sarni-Parasiya 124.10 kms bot Road 243.24 PWD MPRDC

16 Pipeline Tikamgarh-Maheroni 15.7 kms bot(t+a) Road 29.38 PWD MPRDC SLEC on 13-Dec-

10

17 Pipeline Semaria-Manikpur 16.36 kms bot(t+a) Road 34.83 PWD MPRDC SLEC on 13-Dec-

10

18 Pipeline Mandsaur-Pratapgarh 11.526 kms bot(t+a) Road 19.45 PWD MPRDC SLEC on 13-Dec-

10

19 Pipeline Thandla-Limdi 31.18 kms bot(t+a) Road 56.16 PWD MPRDC SLEC on 13-Dec-10

20 Pipeline Hata-Fatehpur-Rajpura-Solapuir-Bajna-

Dargawon 64.42 kms bot(t+a) Road 100.25 PWD MPRDC

SLEC on 13-Dec-

10

21 Pipeline Deharda-Ishagrah 32.93 kms bot(t+a) Road 50.57 PWD MPRDC SLEC on 13-Dec-

10

22 Pipeline Damoh-Bahtiyargrah-Hirapur 69.60 kms bot Road 125.71 PWD MPRDC

23 Pipeline Sarangpur-Akodia-Shujalpur 39.86 kms bot Road 68.38 PWD MPRDC SLEC on 13-Dec-

10

24 Pipeline Rau-Mhow-Mandleshwar 74.40 kms bot Road 181.5 PWD MPRDC

25 Pipeline Badwani-Palsod-Sendhwa 56.89 kms bot(t+a) Road 103.99 PWD MPRDC SLEC on 13-Dec-

10

Page 3: PPP Projects at a Glance. Madhya Pradesh

26 Pipeline Guna-Ashoknagar-Ishagarh 76.15 kms bot Road 108.5 PWD MPRDC

27 Pipeline Sendhwa-Khetia 57.3 kms bot(t+a) Road 101.19 PWD MPRDC SLEC on 13-Dec-

10

28 Pipeline Bhopal-Berasia-Sironj 106.9 kms bot Road 181.39 PWD MPRDC

29 Pipeline Khandwa-Dehtalai-Burhanpur 127.25

kms bot Road 234.25 PWD MPRDC

SLEC on 13-Dec-

10

30 Pipeline Water-based Tourism activites on Indira

Sagar Dam bot

Vill

Hanvantiya,

Khandwa

Tourism 0 Tourism MPTDC

31 Pipeline MLP at Old Bus Stand Kampoo (731.25

Sq Mts and 2027.96 Sq Mts) boot Gwalior Urban 18.55 UADD GMC

TA : CRISIL.

IIPDF approved

32 Pipeline MLP In front of Nigam Shopping

Complex Daulat Ganj (300.00 Sq Mts) boot Gwalior Urban 8.2 UADD GMC

TA : CRISIL.

IIPDF approved

33 Pipeline Bus Terminals (3) boot Bhopal Urban 43.6 UADD BMC

Feasibility report

submitted. IIPDF

approved. RFP

being prepared

34 Pipeline

Parking Cum Commercial at Gandhi

Mkt, Maharaj Bada for 300 cars, 252 shops relocation. (5,228 Sq. Mt.)

boot Gwalior Urban 50 UADD GMC

5 bidders

shortlisted. HC ordered status quo

35 Pipeline

Hospital Project at Old Nigam Work

Shop, Dholi Bua ka Pull (2330.60 Sq

Mts)

boot Gwalior Health 30.3 UADD GMC

TA : CRISIL.

IIPDF approved.

RFQ docs prep

36 Pipeline PPP Projects exploration at select MCs

in MP 11 cities Urban 150 UADD Project Utthaan

TA : CRISIL. Feasibility rpt

submitted. (Jbp,

Ujjn, Rat, Khw,

Dws, Bur, Sat, Sag,

Rew, Kat, Sin)

37 Pipeline Multi Level Parking at New Mkt bot Bhopal Urban 51 UADD BMC Feasibility report

under approval

38 Pipeline ADB Pilot - 24x7 and NRW Water omt Bhopal Water 10.96 UADD BMC RFQ shrotlisting

Page 4: PPP Projects at a Glance. Madhya Pradesh

reduction done. RFP last date

02-feb-11

39 Pipeline Commercial Cplx construction and

O&M of Bus terminal boot Rewa Urban 20 UADD RMC

RFP being

finalised

40 Pipeline

Reduction of Non-Revenue Water and

Improvement of Water Supply Services

in Bhopal

bot Bhopal Water 246.15 UADD BMC TA appointed :

CRISIL

41 Pipeline Multi Level Parking at M.P. Nagar bot Bhopal Urban 38.67 UADD BMC

TA appointed.

Feasibility report

submitted

42 Construction Eco-tourism park at Arnia near Sonkatch

(4.5 Hect) bot

Arnia, Distt.

Dewas Tourism 2 Forest MPEDB

C A signed

19/05/2010

43 Construction Parking cum Logistics Hub at

Mandideep for 500 trucks boot

Mandideep,

near Bhopal Industry 35 Industries AKVN, Bhopal

Awarded in Jul 08,

Premium 3 crs

44 Construction Bhind-Mihona-Gopalpur 50.86 kms bot Road 82.89 PWD MPRDC VGF 31.71

45 Construction Jaora-Nayagaon 4-lane 127.81 kms bot Road 425.71 PWD MPRDC

46 Construction Sagar-Damoh 68.81 kms bot Road 116.5 PWD MPRDC VGF 44.28

47 Construction Lebad-Narayanpura-Digthan-Billod-

Manpur Road 34.30 kms bot Road 206.53 PWD MPRDC

C A signed on

04/05/2010

48 Construction Satna-Chitrakoot Road 74.13 kms bot Road 124.25 PWD MPRDC C A signed on

06/05/2010

49 Construction Ujjain-Unhel-Nagda-Ghiloda Road

95.22 kms bot Road 194.79 PWD MPRDC

C A signed on

06/05/2010

50 Construction Indore-Ujjain 4 lane 48.85 kms bot Road 232.94 PWD MPRDC

51 Construction Damoh-Jabalpur 98.90 kms bot Road 212.13 PWD MPRDC VGF 82.71

52 Construction Lebad-Jaora 4 lane 125 kms bot Road 589.31 PWD MPRDC

53 Construction Bina-Khimlasa-Malthon 39.42 kms bot Road 69.11 PWD MPRDC VGF 26.27

54 Construction Bhopal bypass 4 lane 52 kms bot Road 221.62 PWD MPRDC Agreement

Terminated

55 Construction FOBs bot Rau, nr Urban 3 Rau Mun. Rau Mun. Edward (Divn of

Page 5: PPP Projects at a Glance. Madhya Pradesh

Indore Council Council Swiift Intermedia

Convergence,

Indore.

Rs.20,50,000/-

56 Construction

Sports City with Cricket/ Hockey/

Football/Indoor/Aquatic/Admin

Block/Hostel on 50 acres plus Star

Hotel/Golf/Residential/Commercial

(Total 172 acres)

boot Satgadhi Vill,

Bhopal Sports 900

Sports and

Youth Welfare

Sports and

Youth Welfare Premium 18.10 crs

57 Construction Check-Post barriers at entry points of

MP bot Multiple Transport 1094 Transport Transport

TA : MPRDC.

Concessionaire

selected

58 Construction Water supply augmentation and 24x7

supply bot Shivpuri Water 65 UADD

Nagar Palika

Parishad

Shivpuri

Rs. 15.4/KL.

Financial Closure

achieved - IDBI

Bank. Drawings

submitted for

approval

59 Construction Water supply augmentation and 24x7

supply bot Khandwa Water 105 UADD KMC

Rs. 11.95/KL.

Intake Well

construction start -

23/03/10. Clear Water Feeder Main

construction start-

25/03/10.

60 Construction Multi-Level Parking at Indore (7 sites) boot Indore Urban 14 UADD IMC

61 Completed Rewa-Shahdol-Amrakantak 247 kms bot Road 111.27 PWD MPRDC

62 Completed Dewas-Ujjain-Badnagar-Badnawar

98.26 kms bot Road 49.93 PWD MPRDC

63 Completed Satna- Maihar-Umaria 141 kms bot Road 53.29 PWD MPRDC

64 Completed Hoshangabad-Harda-Khandwa 186 kms bot Road 81 PWD MPRDC

65 Completed Bhopal-Dewas 142.6 kms bot Road 426.64 PWD MPRDC

Page 6: PPP Projects at a Glance. Madhya Pradesh

66 Completed Mandsaur-Sitamau (upto Rajasthan

border) 44 kms bot Road 42.34 PWD MPRDC

Toll started on 05

Feb 2009

67 Completed Hoshangabad-Piparia-Pachmarhi 126

kms bot Road 57 PWD MPRDC

68 Completed Indore-Edelabad 203 kms bot Road 124.05 PWD MPRDC

69 Completed Jabalpur-Narsinghpur-Piparia 140 kms bot Road 74.96 PWD MPRDC

70 Completed Ujjain-Jhalawad 134 kms bot Road 66.7 PWD MPRDC

71 Completed Matkuli-Tamia-Chhindwara 112 kms bot Road 98.43 PWD MPRDC

74% completed.

Toll started on 19

March 2010 on

33.38 km

72 Completed Chandrapur-Alirajpur-Kukshi-Badwani

100 kms bot Road 63.02 PWD MPRDC

92% completed.

Toll started on 18

Aug 2009 on 41

km

73 Completed Seoni-Balaghat-Gondia 114 kms bot Road 59.8 PWD MPRDC

74 Completed Raisen-Rahatgarh 101.40 kms bot Road 57.72 PWD MPRDC

75 Completed Bus stops for city service. 200 sq. ft.

advt per stop (100 nos) boot Bhopal Urban 2 UADD BMC

Awarded in Sept

08, Rs. 1.24 crs

premium, 4 equal

annual instalments.

4 months

construction. 5 yr

concession

76 Completed Toilets with advt rights (36) boot Bhopal Urban 3 UADD BMC

Awarded, Premium

7.87 crs. in 14

annual instalments.

77 Bidding Eco-Tourism Park (7 hectares) bot Rewa Tourism 10 Forest MPEDB RFP issued

78 Bidding Bina-Kurwai-Sironj 57.10 kms bot Road 91.72 PWD MPRDC VGF 36.68 crs

79 Bidding Food Park boot Harda Food

Park 57.07

Horti & Food

Proce MPAGRO

TA : E&Y. RFQ

done, 4 cos

Page 7: PPP Projects at a Glance. Madhya Pradesh

shortlisted. RfP

being finalised

80 Bidding Food Park boot Ratlam Food

Park 63.25

Horti & Food

Proce MPAGRO

TA : E&Y. RFQ

done, 4 cos

shortlisted. RfP

being finalised

81 Bidding ADB Pilot - 24x7 and NRW Water

reduction omt Gwalior Water 0 UADD GMC

RFQ shrotlisting

done.

82 Bidding ADB Pilot - 24x7 and NRW Water

reduction omt Indore Water 13.94 UADD IMC

RFQ shrotlisting

done. RFP last date

15-jan-11