MADHYA PRADESHRENEWABLE ENERGY SECTOR
TABLE OF CONTENTS
About MADHYA PRADESH1
Advantage MADHYA PRADESH2
Investment Facilitation & Incentives3
Key Investment Opportunities 4
Contact Details5
MP: Power Scenario TODAY
Source-wise capacity composition (%)
Growth in total installed capacity(MW)
Mar/05
Mar/06
Mar/07
Mar/08
Mar/09
Mar/10
Mar/11
Jul/12
0
2000
4000
6000
8000
10000
56.20%
3.01%
35.48%
5.31%
Thermal Nuclear Hydro Renewables
2007-08
2008-09
2009-10
2010-11
2011-12
April 2012- July 2012
0
5
10
15
20
25 Energy Deficit (%)
RENEWABLE ENERGY MADHYA PRADESHCURRENT OUTPUT - FACTS
WINDSOLARBIOMASSSMALL HYDRO
70%2%9%
19%
314 MW
7 MW
40 MW
86 MWValues rounded to nearest Integer
ADVANTAGE MADHYA PRADESHWHAT HAS MP GOT?
WINDHYDRO
SOLAR
BIOMASSBiomass opportunities are present at most districts in the state
with a potential of APPROX. 1400 MW
Large rivers such As Tawa, Narmada, Chambal, Tapi give ample potential for HYDEL POWER GENERATION
Estimated Small Hydro Potential is 410 MW
MP has a Gross Wind Potential of almost 3000 MW
High solar radiation with more than 300 days of clear sun & solar potential up to 6.2 KWh/Sq.m./day
MP HAS RANGE OF POWER GENERATION SOURCES FROM SUSTAINABLE & RENEWABLE
POLICY & INCENTIVES MADHYA PRADESHFISCAL & NON-FISCAL
SOLAR
Exemption in electricity cess and duty
Benefits of Industry StatusWheeling chargeContract demand reduction in case of third party/ captive use of power with in the State.
Entry tax exemptionSingle window clearanceThird party saleSale of Power to outside StateBankingStamp duty exemption on purchase of private land
Promotion of Solar parksWater Rate
HYDRO
BIOMASS
WIND
AND OTHERS AS PER INDIVIDUAL POLICIES
OVERVIEW
OPPORTUNITY MADHYA PRADESHSOLAR
CURRENT CAPACITY 7.25 MWIN PIPELINE 270 MWADDITIONAL CUMULATIVE CAPACITY EXPECTED BY 2014 870 MWINVESTMENT EXPECTED INR 10000 Cr.LAND IDENTIFIED
NEEMUCH, SHAHJAPUR, MANDSAUR, SHEOPUR, REWA
MANDSAURNEEMUCH
REWASHEOPUR
SOLAR PARKS
Park : 2 Hours from Bhopal, Spread over 140.79 HectaresLand allotted for 55.25 MW project capacity
5.25 MW capacity commissioned.Work on 50 MW NTPC project has started.
Nation’s 1st Solar project registered under REC mode installed
EXISTING IN RAJGARH PROPOSED
OPPORTUNITY MADHYA PRADESHWIND POWER
CURRENT CAPACITY 314.25 MW IN PIPELINE 1422.35 MW ADDITIONAL CUMULATIVE CAPACITY EXPECTED BY 2014 2100 MW INVESTMENT EXPECTED INR 12600 Cr.
LAND IDENTIFIEDDEWASBADWANIBETULRATLAM
SHAHJAPURMANDSAURCHHINDWARAWEST NIWARDHAR
Wind Projects—Future Potential
Significant potential exists for setting wind projects on tribal land in Madhya Pradesh.
GoMP to notify Policy for setting wind projects on tribal land for facilitating the developers (protecting tribal interest)
THE STATE HAS DECIDED TO FORMULATE A POLICY TO MAKE LAND OF TRIBAL AREAS AVAILABLE ON MUTUAL CONSENT FOR WIND POWER PROJECTS.
THE INVESTOR WILL HAVE TO PAY THE PREMIUM FOR THE LAND AND ALSO 20 DAYS NREGA WAGES EVERY MONTH TO THE OWNER
THE TRIBAL WILL BE ALLOWED TO USE THE VACANT LAND
THE INVESTOR WILL BE ALLOWED LAND FOR WTG AND FOR ROW
Largest Project for Repowering of Wind Park THE LARGEST
PROJECT FOR REPOWERING OF A WIND FARM IS BEING TAKEN UP IN DEWAS, NEAR INDORE.
THIS PROJECT WILL REPOWER A 13 MW WIND FARM TO MORE THAN 45 MW
THE PROJECT IS EXPECTED TO BE OPEN FOR OFFERS IN THREE MONTHS
OPPORTUNITY MADHYA PRADESHBIOMASS
CURRENT CAPACITY 40 MW IN PIPELINE 296 MW ADDITIONAL CUMULATIVE CAPACITY EXPECTED BY 2014 296 MW INVESTMENT EXPECTED INR 1500 Cr.
LAND IDENTIFIED KHANDWADHARKHARGONE
BARWANIDEWASJHABUA
OPPORTUNITY MADHYA PRADESHHYDRO
CURRENT CAPACITY SMALL HYDRO PLANT 86.25 MW IN PIPELINE 218.7 MW
ADDITIONALCUMULATIVE CAPACITY EXPECTED BY 2014 304.95 MW INVESTMENT EXPECTED INR 1300 Cr.
AREAS IDENTIFIED THANWAR (700 KW) RAJGHAT LBC (600 KW)SONE (1900 KW)
ASAN FALL (2700 KW)SINDH PHASE-II (1700 KW)HALALI (800 KW) SINHAAL-I (650 KW)
+ OTHERS
Projected Installed Capacity by June 2014
Grid Interactive RE installed capacity (MW)
Wind Solar Small Hydro Biomass0
200
400
600
800
1000
1200
14001200
800
300 300
2600 MEGAWATT
83%
17%
95%
5%
2012
2014
CONTACT DETAILS
POLICY
CONTACTSMr. Sudhi Ranjan Mohanty
Secretary, New & Renewable Energy Department, Government of Madhya PradeshPhone: 0755-4251330
Email: [email protected]
Mr. Mridul KhareDeputy Commissioner, New & Renewable Energy Department, Government of Madhya
PradeshPhone: +91 9425003666
Email: [email protected]
www.mptrifac.orgwww.mpnred.com