PPP and PFI

114
Funding Infrastructure by Public-Private Partnerships (PPP) and Private Finance Initiatives (PFI): Ghana The Project Company (Ghana) Ltd Tony Hagan BSc MSc CEng MICE

description

PPP and PFI: Infrastructure, Property and Renewables

Transcript of PPP and PFI

Page 1: PPP and PFI

Funding Infrastructure

by Public-Private Partnerships (PPP)

and Private Finance Initiatives (PFI):

Ghana

The Project Company (Ghana) Ltd

Tony Hagan BSc MSc CEng MICE

Page 2: PPP and PFI

Contact: [email protected]

Page 3: PPP and PFI

Issues Considered

• Public-Private Partnerships (PPP)• Ghana: Economic and Social Infrastructure• Ghana: PPP Opportunity Areas• The Benefits of PPP Schemes• The Differences between the Public and Private Sectors• Delivering Infrastructure Projects for Ghana• Financing PPP Schemes and Role of Banks• Keys to Successful PPP Schemes• The Project Company (Ghana) Ltd

Page 4: PPP and PFI

Public-Private Partnerships (PPP)

Page 5: PPP and PFI

What are PPPs?

Key feature of a PPP is that it involves a risk sharing relationship between Public and Private Promoters, based on a shared

commitment to achieve a desired public policy outcome

Page 6: PPP and PFI

What are the aims of a PPP?

• PPPs aim to introduce Private Sector Resources and/or Expertise in order to help provide and deliver Public sector Assets and Services

• The term PPP is used to describe a wide variety of working arrangements from loose, informal and strategic partnerships, to design, build, finance and operate (DBFO) type service contracts and formal joint venture companies

Page 7: PPP and PFI

How are PPPs Structured?

Page 8: PPP and PFI

What are the steps?

Project Preparation

Service Provider Selection

Contract Management

1. Service Need

(Output specs over time)

2. Option Appraisal

(Report on options)

3. Business Case

(affrdblty./public interest)

4. Project Dev.

(team, PSC, plan)

5. Bid Preparation

(EOI/ Short listing, RFP)

6. Bid Evaluation

(prf. bidder, value for $)

7. Final Negotiation

(sign contract, finc. close)

8. Contract Mgmt.

(construction, commissioning,

monitoring,dispute settlement,

continuing communications

Project/ Funding Approval

Bid Doc Approval

Project Finalization Review

What are the Steps in PPPs?

Page 9: PPP and PFI

What characteristics have PPPs got?

Characterised by the Public Sector:

• Entering into contracts to acquire services, rather than procuring an asset

• Specifying the service requirement on the basis of outputs, not inputs

• Linking payments to the private sector to the level and quality services actually delivered

• Often requiring a ‘whole life’ approach to the design, building and operation of project assets

• Seeking optimal risk transfer to the private sector

• Requiring private partner to be responsible for raising some, or all, of investment finance required

• Utilising diverse payment mechanisms, such as market revenue, shadow tolls, capacity availability payments and so on

Page 10: PPP and PFI

What are the ingredients of a good PPP?

Contractual arrangement should be based on:

1. Substantial risk transfer– allocation of risks to parties best able to

manage them 2. Quality of service & output specification

– focus on services associated with procured assets

3. Performance-related rewards– payment only if performance standards met

4. M&E plan over life of contract– achievement of whole-life performance

Page 11: PPP and PFI

PPPs and Value For Money (VFM)

• Key consideration in launching a PPP programme should be ensuring Value For Money (VFM)

• PPPs facilitate and create incentives for On-time and On-budget Projects

• Achieving optimal allocation of risk is the most important factor in structuring a PPP

Page 12: PPP and PFI

What are the Pre-requisites?

Clear policy and legal frameworks– Rationale for use of PPPs & legal powers to contract out services– Dispute resolution procedures– Oversight of fiscal costs

Oversight procedures providing checks & balances1) Project preparation – business case & value-for-money2) Provider selection – guidelines for pre-qualification & tender3) Contract management – M&E, performance-linked payments/penalties

Support functions1) Information dissemination – data, networking, training2) Guidance – model contracts, tools, case studies3) Catalytic functions – political/advisory support, funding

Needed: Transparency, Competition, Monitoring, Empowered Public

Page 13: PPP and PFI

PPPs Need:

• Appropriate selection of projects ( a PPP will never cure a weak project)

• A clear and stable legal framework

• Skilled and experienced people in the public sector

• Experienced and creditworthy private sector partners

Page 14: PPP and PFI

What are the Benefits of PPPs?

• Risk transfer to private sector – Commercial know-how & managerial skills – Best-practice technologies & innovation

• Enhanced government accountability• Entrepreneurship & local enterprise development• Private finance

– Government payments can be leveraged by citizen user fees and/or government cost savings

Result: Faster deployment of better services

Page 15: PPP and PFI

How have PPPs developed elsewhere?

• New investment in public infrastructure via PPPs has included:

- Airports- Railways- Roads- Bridges- Tunnels- Environmental facilities (waste incinerators and water

treatment plants)- Public Buildings (offices, schools, hospitals and prisons)

Page 16: PPP and PFI

The PPP Outsourcing Path

Infrastructure Provision and ManagementInfrastructure Provision and Management

Iden

tific

atio

n

Inte

ract

ion

CitizenCitizen CompanyCompany LandLand VehicleVehicle LegalLegal

TaxationTaxationProcur.Procur.

OtherOther

PolicyPolicy

Legis.Legis.

Reg.Reg. Enfor.Enfor.

ElectoralElectoral

WebsiteServicesServices

Nat

ural

Out

sou

rcin

g P

ath

Database

Judic.Judic.

Infrastructure Provision and ManagementInfrastructure Provision and Management

Iden

tific

atio

n

Inte

ract

ion

CitizenCitizen CompanyCompany LandLand VehicleVehicle LegalLegal

TaxationTaxationProcur.Procur.

OtherOther

PolicyPolicy

Legis.Legis.

Reg.Reg. Enfor.Enfor.

ElectoralElectoral

WebsiteServicesServices

Nat

ural

Out

sou

rcin

g P

ath

Nat

ural

Out

sou

rcin

g P

ath

Database

Judic.Judic.

Page 17: PPP and PFI

Pattern of PPPs and Experience to Date

• PPPs sectorally concentrated – transport (road, rail, estuarial crossings) as well as Education and Health

• Other sectors (waste, environment, ports, energy and social housing) yet to reach ‘critical mass’ for competitive market to emerge

Page 18: PPP and PFI

Experience to Date

• Most countries commence PPP in the transport sector but develop into other scetors as VFM is proven and PPP expertise established

• PPP structures demonstrate considerable national variations – PPP techniques succeed because they can be adaptable to specific financial, political and socio-economic priorities of each country

Page 19: PPP and PFI

Ghana: Economic and Social Sector Infrastructure

Page 20: PPP and PFI
Page 21: PPP and PFI

Agriculture and Infrastructure: Priority Policies and Targets, 2007 – 2009…1

• Agriculture modernization: The aim is to go beyond subsistence agriculture and increase agricultural productivity

• Close the Infrastructure Gap:– Roads; The target is to have more than 55% of the entire

national road network in good condition by 2009 up from the current (2006) indicator level of 45%

– Energy; The target is (I) to install a total of about 300 Megawatts of additional capacity (approximately 17% of installed capacity) in 2007; (II) To develop and construct new power stations, (II) Explore alternative sources of energy

– ICT; Increase teledensity by at least 27% annually, and increase internet access by an annual rate of not less than 2%.

Page 22: PPP and PFI

Education: Priority Policies and Targets, 2007 – 2009…2

• In Education the objectives are:– increase access to and participation in education and training at all

levels– bridge gender gaps in access to education in all districts– improve the quality of teaching and learning; – improve efficiency in the delivery of education services – promote science and technology education at all levels with

particular attention to increased participation of girls.

Consequently, the target is to: - achieve literacy rate (i.e. proportion of adult population able to read

and write) of about 68.20%; - Gross Enrolment Rate (GER) at the Primary level of 97.80%, JSS of

80.40% and SSS of 31% by 2009. - In doing this, effort will be made at achieving Gender Parity Index

(GPI) for gross enrolment of 1 at all levels (i.e. KG, Primary, JSS and SSS)

Page 23: PPP and PFI

Health: Priority Policies and Targets, 2007 – 2009…3

• Health– Expand and sustain high coverage of quality interventions and

services, particularly malaria, infant & maternal mortality, HIV/AIDS etc

– Target for HIV/AIDS: 50% ARVs coverage from the current 3.2%; – HIV/AIDS prevalence reduced to 2.0% by 2009 from 3.2% now

• Water supply: The target is to increase access to above 60% by 2009.

• Good Governance: The focus will be on- Strengthening the process of decentralization - Improve existing institutional capacities including Parliament- Fostering greater civic responsibility

Page 24: PPP and PFI

Challenges to the attainment of the Overall Objective of the Medium Term Development Framework (GPRS II)…1

• One of the key assumptions underlying the attainment of the minimum GDP growth of 8% and per capita GDP of US$686 over the medium term (by 2009) is increased investment in the key sectors of the economy, particularly in the area of infrastructure (i.e. energy, roads and railways, ICT, etc)

• The recent analysis of the investment needs for the key sectors of the economy indicates a total investment requirements of about US$10,555.5 million over the period 2007-2009, of which GOG revenue projections amounts to US$3,115.7 million (about 30% of the estimated requirement).

• This leaves an average financing gap of about US$3,518.5 million per annum.

Page 25: PPP and PFI

Challenges to the attainment of the Overall Objective of the Medium Term Development Framework (GPRS II)…2

This gap is expected to be filled by:• Resource mobilization through grant finance and budget

support. • external loans on concessional terms with a minimum

grant element of 35%. • Non-concessional loans to be limited by specific projects

in any specific year.• The implication of this is that development partners have

to scale up resource support to Ghana which currently stands at about US$1,306.25 million per annum.

Page 26: PPP and PFI

Global Partnership for Development...1

• Strengthening the partnership between Ghana and her Development Partners has been central to the formulation, implementation and monitoring of the GPRS.

• The principles of the partnership are based on the Paris Declaration and include:

• strengthening country’s ownership of the development process, • ensuring the alignment of development partner support on

national priority,• ensuring harmonisation of donor procedures and country

systems • and use information to improve decision making. • ensuring mutual accountability in relation to resource flow and

results achieved through the implementation of national strategy

Page 27: PPP and PFI

Global Partnership for Development...2

• Within this framework GOG expect an increased in the current level of donor support over the next 3 years.

• The GOG expect more loans on concessional terms with a minimum grant element of 35% as against non-concessional loans.

• The GOG expects more budget support instead of projects loans which is difficult to coordinate and manage. This will allow for integration of aid flows into the planning, implementation, monitoring and evaluation phases of the budget cycle.

Page 28: PPP and PFI

Conclusions

• Achieving an accelerated growth, with employment creation and poverty reduction, will require massive investment in priority sectors of the economy.

• The country has come far with the help of its Development Partners and fiscal prudence on the part of Government in the achievement of some remarkable progress which makes the future bright.

• There is the need to maintain the momentum of growth and the achievement of the Millennium Development Goals.

• To do this concerted efforts must be made towards investing in some key areas of the economy.

• This will require scaling up of resources on the part of Government and its Development Partners to make it feasible.

Page 29: PPP and PFI

Ghana: Economic Sector

Page 30: PPP and PFI

Economic Sector Overview...1

• Well endowed with Natural Resources (gold, timber, industrial diamonds, bauxite, manganese, fish, rubber, hydropower, petroleum, silver, salt and limestone)

• Ghana has roughly twice the per capita output of the poorest countries in West Africa

• Heavily dependent on international financial and technical assistance

• Gold and cocoa production, and individual remittances, are major sources of foreign exchange

• The domestic economy continues to revolve around agriculture, which accounts for about 35% of GDP and employs about 55% of the work force, mainly small landholders

• Ghana signed a Millennium Challenge Corporation (MCC) Compact in 2006, which aims to assist in transforming Ghana's agricultural sector

Page 31: PPP and PFI

Economic Sector Overview...2

• Ghana opted for debt relief under the Heavily Indebted Poor Country (HIPC) program in 2002, and is also benefiting from the Multilateral Debt Relief Initiative that took effect in 2006

• Thematic priorities under its current Growth and Poverty Reduction Strategy (GPRS-II), which also provides the framework for development partner assistance, are:

- Macroeconomic stability; - Private sector competitiveness; - Human resource development;

- Good governance and civic responsibility • Sound macro-economic management along with high prices for gold

and cocoa helped sustain GDP growth in 2008

Page 32: PPP and PFI

Economic Sector Overview...3

Industries:• Mining• Lumbering• Light Manufacturing• Aluminium Smelting• Food Processing• Cement• Small Commercial Ship-Building

Page 33: PPP and PFI

Economic Sector Infrastructure

• Energy and Bio-Energies (Power Plants, Hydro-electric Plants, Networks and Renewable Energies)

• Environment (Water Networks, sewage Facilities, Sanitation and De-salination)

• Information and Communications Technologies (Backbones, Regional Inter-connections..)

• Transport (Roads, Highways, Railways, Ports and Airports)

Page 34: PPP and PFI

Economic Sector Infrastructure: Energy and Bio-Energies

ELECTRICITYElectricity - production: 8.204 billion kWh (2006 est.)

Electricity - consumption: 6.76 billion kWh (2006 est.)

Electricity - exports: 755 million kWh (2006 est.)

Electricity - imports: 629 million kWh (2006 est.)

WHY EXPORT 755 TO THEN IMPORT 629??????????????

PARTICULARLY AS PRODUCING MORE THAN COMSUME

WHY ARE ELECTRICITY CUTS SO PREVALENT??????????

Page 35: PPP and PFI

Economic Sector Infrastructure: Energy and Bio-Energies

OIL

Oil - production: 7,571 bbl/day (2007 est.)

Oil - consumption: 49,300 bbl/day (2006 est.)

Oil - exports: 5,709 bbl/day (2005)

Oil - imports: 45,520 bbl/day (2005)

Oil - proved reserves: 15 million bbl (1 January 2008 est.)

CONSUME DAILY ABOUT 7 TIMES AS MUCH OIL AS PRODUCE DAILY AND HAVE TO IMPORT MASSIVE AMOUNTS YET HAVE OIL (PROVED

RESERVES) OF 15 MILLION BBL???????????

Page 36: PPP and PFI

Economic Sector Infrastructure: Energy and Bio-Energies

NATURAL GAS

Natural gas - production: 0 cu m (2007 est.)

Natural gas - consumption: 0 cu m (2007 est.)

Natural gas - exports: 0 cu m (2007 est.)

Natural gas - imports: 0 cu m (2007 est.)

Natural gas - proved reserves: 22.65 billion cu m (1 January 2008 est.)

MASSIVE AMOUNT OF NATURAL GAS RESERVES YET ZERO CONSUMPTION AND PRODUCTION????????

Page 37: PPP and PFI

Economic Sector Infrastructure: Energy and Bio-Energies

Comment

• Growth in electricity production averaged 4.2 percent a year between 1980 and 1996. In 1998 electricity production was 6.206 billion kilowatt-hours (kWh), 99.9 percent of which was from hydroelectric sources. In the same year, electricity consumption was 5.437 billion kWh and exports were 400 million kWh, while 65 kWh of electricity were imported. Hydroelectricity is generated at the Akasombo and Kpong power plants, which traditionally supply virtually all of the country's electricity needs, as well as provide exports to Benin and Togo.

• Total dependence on hydroelectricity makes Ghana vulnerable to variations in rainfall, and power shortages reached crisis-point in 1998. This has stiffened resolve to provide alternative sources of electric power, including a recently built oil-and gas-fired power station. There are also plans for a number of gas-fired plants, using imported gas and gas from the Tano fields. The Tama oil refinery was being expanded and prepared for privatization in 1997-99. The U.S. Export-Import Bank is to provide guarantees to cover drilling in the Tano off-shore natural gas fields and construction of pipelines, plus loan financing for operations and maintenance work.

Page 38: PPP and PFI

Economic Sector Infrastructure: Environment

Environment - current issues:• recurrent drought in north severely affects agricultural

activities; • deforestation; • overgrazing; • soil erosion; • poaching and habitat destruction threatens wildlife

populations; • water pollution; • inadequate supplies of potable water

Page 39: PPP and PFI

Economic Sector Infrastructure: Information and Communication Technologies

Telephones - main lines in use: 376,500 (2007)

Telephones - mobile cellular: 7.604 million (2007)

Telephone system:

general assessment:

• outdated and unreliable fixed-line infrastructure heavily concentrated in Accra; competition among multiple mobile-cellular providers has spurred growth with subscribership about 35 per 100 persons and rising

domestic:

• primarily microwave radio relay;

• wireless local loop has been installed

Page 40: PPP and PFI

Economic Sector Infrastructure: Information and Communication Technologies

international: country code - 233;

• landing point for the SAT-3/WASC fibre-optic submarine cable that provides connectivity to Europe and Asia;

• satellite earth stations - 4 Intelsat (Atlantic Ocean);

• microwave radio relay link to Panaftel system connects Ghana to its neighbours (2007)

Radio broadcast stations: AM 0, FM 86, shortwave 3 (2007)

Television broadcast stations: 7 (2007)

Internet country code: .gh

Internet hosts: 24,018 (2008)

Page 41: PPP and PFI

Economic Sector Infrastructure: Transport...1

Airports: 11 (2008)

Airports - with paved runways:

• total: 7 over 3,047 m: 1 2,438 to 3,047 m: 1 1,524 to 2,437 m: 3 914 to 1,523 m: 2 (2008)

Airports - with unpaved runways:

• total: 4 914 to 1,523 m: 3 under 914 m: 1 (2008)

Pipelines:

• oil 5 km; refined products 309 km (2008)

Page 42: PPP and PFI

Economic Sector Infrastructure: Transport...2

Railways:• total: 953 km

narrow gauge: 953 km 1.067-m gauge (2006)

Roadways:• total: 62,221 km

paved: 9,955 km unpaved: 52,266 km (2006)

Waterways:• 1,293 km

note: 168 km for launches and lighters on Volta, Ankobra, and Tano rivers; 1,125 km of arterial and feeder waterways on Lake Volta (2008)

Merchant marine:• total: 4

by type: petroleum tanker 1, refrigerated cargo 3 foreign-owned: 1 (Brazil 1) (2008)

Ports and terminals:• Tema

Page 43: PPP and PFI

Ghana National Transport Policy

Page 44: PPP and PFI
Page 45: PPP and PFI

Economic Sector Infrastructure: Transport

Comment

• There are 39,409 kilometres (24,490 miles) of roads, of which 11,653 kilometres (7,241 miles) were paved in 1997. In 1997 there was a 953-kilometer (592-mile) railway network (currently undergoing major rehabilitation) of narrow gauge. The railway connects Accra, Kumasi, and Takoradi, the major mining areas, to the sea ports. The railway network also provides passenger services from the interior of Ghana to the main sea ports at Tema (near Accra) and Takoradi.

• The main waterways include the Volta, Ankobra, and Tano Rivers, which provide 168 kilometers (104 miles) of year-round navigation, and Lake Volta, which provides 1,125 kilometres (699 miles) of arterial and feeder waterways. The main ports are at Takoradi and Tema. There were 12

airports in 1999, 6 of which had paved runways.

Page 46: PPP and PFI

Ghana: Social Sector

Page 47: PPP and PFI

Social Sector Infrastructure

• Health (Urban and Rural Hospitals)

• Education (Schools, High Schools and Universities, Cultural centres, Libraries..)

• Social Housing

• Leisure and Sport (Stadiums..)

Page 48: PPP and PFI

Social Sector Infrastructure: Health

Page 49: PPP and PFI

Social Sector Infrastructure: Education

Page 50: PPP and PFI

Social Sector Infrastructure: Social Housing

Page 51: PPP and PFI

Social Sector Infrastructure: Leisure and Sport

Page 52: PPP and PFI

Ghana: Economic and Social Stimulus Plan...1

This plan is suggesting aims to stimulate employment, certain critical economic sectors, and government spending in Ghana •"You've got to look at the whole picture" •Focus stimulus spending on infrastructure development •Front-end investments for longer-term benefits•Job creation and tax cuts in the country•Stimulate vital sectors of the economy such as energy and health care•Make consumption easier/cheaper for everybody•Infrastructure investments could help make the economy and Ghanaian more competitive internationally.

Page 53: PPP and PFI

Ghana: Economic and Social Stimulus Plan...2

The Implementation of the Stimulus Plan•The stimulus plan again would again boast the country's Infrastructure, including the highways; •Need to modernize government buildings and other public infrastructure; •Need to provide clean water, flood control, and other environmental investments; there would also be public transit and rail infrastructure improvement.•Local school districts would be increased to prevent educational service cutbacks and also to help modernize higher education programs•Need to transform the Ghanaian energy by pumping money into the sector to make it more efficient•Need to repair public housing and make it affordable for the low income earners

Page 54: PPP and PFI

PPP Opportunity Areas

Page 55: PPP and PFI

PPP Sector Highlights around the World

Page 56: PPP and PFI

PPP Infrastructure Projects in Africa 1996-2006

Page 57: PPP and PFI

Infrastructure Development in Africa…1

Page 58: PPP and PFI
Page 59: PPP and PFI

Infrastructure Development in Africa…2

Page 60: PPP and PFI

Infrastructure Development in Africa…3

Page 61: PPP and PFI

The Benefits of PPP Schemes

Page 62: PPP and PFI

The Benefits of PPP Schemes

Page 63: PPP and PFI

Opportunity Sectors in Ghana

Page 64: PPP and PFI

PPP Opportunity Sectors in Ghana

Page 65: PPP and PFI

Concessive and Non-Concessive PPPs

Page 66: PPP and PFI

Ghana: Possible Infrastructure Sectors for PPP

Page 67: PPP and PFI

Infrastructure Meets Business

Page 68: PPP and PFI

Ghana: Possible Infrastructure Sectors for PPP

Page 69: PPP and PFI

Asset Procurement Options under PPP

Page 70: PPP and PFI

The Differences between

The Public and Private Sectors

Page 71: PPP and PFI

Differences between the Public Sector and Private Sector

Page 72: PPP and PFI

PPPs and PFI

Delivering Infrastructure Projects to Ghana

Page 73: PPP and PFI
Page 74: PPP and PFI

Selecting an Appropriate PPP / PFI Model

Page 75: PPP and PFI

Government / Public Sector Authority and The Project Company (Ghana) Ltd

Page 76: PPP and PFI

Parties Involved in PPP Projects

Page 77: PPP and PFI

Key Phases of the PPP Project Process

Page 78: PPP and PFI
Page 79: PPP and PFI

Outline of the Procurement Process

Page 80: PPP and PFI

Contractual Structure of The PPP

Page 81: PPP and PFI

Contract Management Structure

Page 82: PPP and PFI

Structure of Project Governance

Page 83: PPP and PFI

Financing Infrastructure Projects

Page 84: PPP and PFI

Stages of Project Selection

Page 85: PPP and PFI
Page 86: PPP and PFI
Page 87: PPP and PFI
Page 88: PPP and PFI
Page 89: PPP and PFI

Financing PPP Schemes

Page 90: PPP and PFI
Page 91: PPP and PFI

Public versus Private Contract Costs

Page 92: PPP and PFI

Public Sector Costs vs. Private Sector Costs

Page 93: PPP and PFI

Breakdown of Total Costs

Page 94: PPP and PFI

Different PFI Cost Structures

Page 95: PPP and PFI

Comparing Costs of PPP and Government Debt Finance

Page 96: PPP and PFI

Typical PPP / PFI Bidding Process Costs

Page 97: PPP and PFI

Cashflows to Shareholders

Page 98: PPP and PFI

Role of Banks in PPP....1

Page 99: PPP and PFI

Role of Banks...2

Page 100: PPP and PFI

Role of Banks...3

Page 101: PPP and PFI

Role of Banks...4

Page 102: PPP and PFI

Keys to Successful PPP Schemes

Page 103: PPP and PFI

Key to Successful PPP Schemes...1

Page 104: PPP and PFI

Key to Successful PPP Schemes...2

Page 105: PPP and PFI

The Project Company (Ghana) Ltd

Page 106: PPP and PFI

The Project Company (Ghana) Ltd

The Private Finance Initiative (PFI) Model

Page 107: PPP and PFI

Decision Tree for PPP

Page 108: PPP and PFI

The Project Company (Ghana) Ltd

PPP Structure

Page 109: PPP and PFI

The Project Company (Ghana) Ltd

Services We Deliver

Page 110: PPP and PFI

Our Company Aims

Page 111: PPP and PFI
Page 112: PPP and PFI

Our Business Profile

Page 113: PPP and PFI

We Look Forward to Working with You

The Project Company (Ghana) Ltd

Page 114: PPP and PFI

End of Presentation

Thank You