PPL25 Bayou La Loutre RC MC RPT Presentation 1_28_16

7
PPL 26 Regional Planning Team January 28, 2016 Region 1 Pontchartrain/Breton Basin Bayou La Loutre Ridge Restoration and Marsh Creation

Transcript of PPL25 Bayou La Loutre RC MC RPT Presentation 1_28_16

Page 1: PPL25 Bayou La Loutre RC MC RPT Presentation 1_28_16

PPL 26 Regional Planning Team

January 28, 2016

Region 1Pontchartrain/Breton Basin

Bayou La Loutre Ridge Restoration and Marsh

Creation

Page 2: PPL25 Bayou La Loutre RC MC RPT Presentation 1_28_16

This project was conceived in the St. Bernard Coastal Zone board meetings

Ridge restoration was identified as our community’s first priority

Page 3: PPL25 Bayou La Loutre RC MC RPT Presentation 1_28_16

Problems:

•Loss of Ridge habitat due to subsidence and increased boat traffic

•Loss of this structural landmass would cause significant salinity increases

6.83 Avg. Annual ppt

15.12 Avg. Annual ppt

Page 4: PPL25 Bayou La Loutre RC MC RPT Presentation 1_28_16
Page 5: PPL25 Bayou La Loutre RC MC RPT Presentation 1_28_16

Bayou La Loutre RC, Lena Lagoon MC synergy with the Master Plan

Page 6: PPL25 Bayou La Loutre RC MC RPT Presentation 1_28_16

• 5.46 miles of Ridge• 10 acres of S1/S2 Live Oak

Hackberry Forest Habitat

Lena Lagoon Shoreline Marsh Creation

Bayou La Loutre Ridge Creation

• 129 acres of marsh creation• 254 acres of marsh nourishment

Page 7: PPL25 Bayou La Loutre RC MC RPT Presentation 1_28_16

Any questions?

Blaise Pezold, LDAF-CRVP, 985-447-3871 ext. 3, [email protected]