Project overview

A feasibility study has commenced for the objective

of determining whether or not the company should

start a project waste management

Page 3: PP Waste Management Recycling Project2007- Azhee Amin

Project justification

We limited the scope of our analysis to Erbil/Kurdistan

because of no competition at the market.

Page 4: PP Waste Management Recycling Project2007- Azhee Amin

Project objective

The project objective is to establish a high quality

company for waste management recycling in

Erbil/Kurdistan

Page 5: PP Waste Management Recycling Project2007- Azhee Amin

Project benefits

Extension of landfill life-time

cost savings from reduced waste transportation to landfill

cost savings from avoided waste disposal at landfill

Creation of new jobs

Revenue from the sale of compost

Page 6: PP Waste Management Recycling Project2007- Azhee Amin

Strategy

Our company’s strategy for waste management refers to

prevention, re-use and recovery, optimization of final

disposal, and regulation strategic guidelines for the

management of waste in Kurdistan region

Page 7: PP Waste Management Recycling Project2007- Azhee Amin

Strategy “WASTE HIERARCHY”

The best option

The worst option

Page 8: PP Waste Management Recycling Project2007- Azhee Amin

Executive

committee

Company staff

Municipal

government

Project manager

and team

Contractor/

suppliers

Community at

large

Page 9: PP Waste Management Recycling Project2007- Azhee Amin

Environmental feasibility

Our staff has up-to-date knowledge of local, regional and

international environmental regulations and has

participated in the policy formulation process for

national and regional environmental management

standards

Page 10: PP Waste Management Recycling Project2007- Azhee Amin

Marketing Feasibility for Recycling waste

Management

We study marketing for recycling through use in

many different settings, including public health

and national safety.

Page 11: PP Waste Management Recycling Project2007- Azhee Amin

The Marketing Mix: The 4Ps

Page 12: PP Waste Management Recycling Project2007- Azhee Amin

The 3RS of Marketing

Research

Response

Result

Page 13: PP Waste Management Recycling Project2007- Azhee Amin

Quality Management

ACT

Plan

DO

CHECK

Page 14: PP Waste Management Recycling Project2007- Azhee Amin

Social Feasibility

The aim of this part of the Project

Feasibility Study is to analysis

the project’s social data in terms

of social opportunities and risk

associated with achieving t

he project’s overall objectives.

Page 15: PP Waste Management Recycling Project2007- Azhee Amin

Risk management

The aim of this section of the Project Feasibility Study

is to analysis project’s risks and opportunities in terms

of the achieving the project’s overall objectives.

Page 16: PP Waste Management Recycling Project2007- Azhee Amin

Conclusion

As a result of the marketing, social, environmental

and risk management study. therefore it has been

determined that while this project is national in

scope, it is feasible from a all perspective. The

risks have been identified and assessed, which has

been determined the project risk classification is

medium.

We recommend that the project is feasible .