HRL Technology Group Pty Ltd ABN 89 609 887 327 [email protected] hrl.com.au
Melbourne Level One Unit 4 677 Springvale Road Mulgrave VIC 3170 Phone +61 3 9565 9888 Fax +61 3 9565 9879
Morwell Tramway Road Morwell VIC 3840
Phone +61 3 5132 1500 Fax +61 3 5132 1580
Queensland Unit 2 33-37 Rosedale Street Coopers Plains QLD 4108 Phone +61 7 3423 4300 Fax +61 7 3345 5937
1
GlassProdu
ction–an
alysisofg
lass,culleta
ndra
wm
aterials
hrl:
PowerSystemDesignandAnalysishrl:hastheexperiencedstaffandsoftwaretoolstodesignpowerandco-generationprojectsquicklyandefficiently.WeusetheThermoflowsuiteofprogramsfortheanalysis,designandcostingofconventionalsteamcycleandgasturbinecombinedcycleplant.Additionalmodellingtoolsareusedtoaddressspecificdesignorperformanceissues.Thiscapabilityissupportedbythefuel,combustion,materialsandenvironmentalspecialistswithinhrl:
SteamPro:SteamPowerPlantDesign
STEAMPROisusedtodesignsteampowerplantswithorwithoutcogeneration.It’sspeed,flexibilityanddetailedoutputenablesustoquicklyinvestigatetheeffectsofdesignchangestoproduceanoptimalplantdesign.STEAMPRO'ssteamturbinemodelcanbeconfiguredwithtendistinctshaft/casinglayoutsincludingsubcriticalandsupercriticalcyclesusingsaturatedHPsteamandsteamreheating. UsingSTEAMPRO,wecan • Evaluatethethermodynamicrequirementsofyourboilertakingintoaccountfactorssuchasfueltype,excessair,the
minimumstacktemperature,etc.• Determinetherequiredratesofheattransferfortheeconomiser,evaporator,superheater(s),reheater(s)andairpreheater.• Determinethefuelflowrate;stacktemperature,boilerefficiency,andforcedandinduceddraughtfanpowerrequirements.• Determinethesizeofheatexchangesurfacesandprovidedetailedspecificationsontubediameter,wallthickness,fin
characteristics,andmaterialsforeachindividualheatexchangesectionintheboiler.
SteamMasterSTEAMMASTERmodelsindetailtheoff-designbehaviouroftheboiler,condensers,feedwaterheatersandpipingpressuredrops.Withthiscapability,wecanquicklyandaccuratelyinvestigatetheeffectofchangestoplantdesignandoperationalconditions.Factorsthatcanbeinvestigatedinclude:• Changesinthedistributionofprimaryairandsecondaryair,fluegasrecirculationandtheintroductionoftemperingair.• Differentarrangementsoffeedwaterheaters,bypassingofindividualorseriesgroupsoffeedwaterheaters,shutoffheating
steamflowtoindividualheaters,andre-routeheaterdrainstootherdestinations.• Pressuredropsofsteamandwaterinsidethetubesofboilerheatexchangersandpressuredropsoffluegasoverthe
outsideofthosetubes.
GTPRO:GasTurbineCombinedCycleandCo-GenerationDesignGTPROisusedtogenerateaccurate,detailedheatbalances,cycleflowschematics,equipmentdesignsandeconomicanalysesforcombinedcycleandco-generationplants.WithGTPRO,wecanmodelabroadvarietyofsteamsystemswithorwithoutsupplementaryfiring,rangingfromsimpleheatrecoveryboilerstomulti-pressuresteaminjectedgasturbinesandreheatcombinedcycleswithnumerousprocesssteamorwaterextractionsoradditions.Additionally,wecanmodelsteamcycleswithfreshairfiringorutilisingahotgasstreamfrom,forexample,ablastfurnaceorotherindustrialprocess.Thegasturbineandsteamcyclearefullyintegratedandprovidesdetailedestimatesontheperformanceofthegasturbinecyclefromtheinlettothecompressor,combustor,turbinedowntothediffuser.Wecanalsoinvestigatetheeffectofusingdifferentfuelsources,abroadrangeofsiteandinstallationconditionsaswellastheeffectsofdesignorcontrolsmodifications,orturbomachinerydegradationduetoagingorfouling.
2
PEACE(PlantEngineeringandConstructionEstimator)Developingacomprehensivecostestimateforallphasesofpowerplantconstructioncanbeatediousprocess.ThePEACEmoduleperformspreliminarysizingcalculationsforallsignificantplantequipment,pipes,foundationsandbuildings.Thisprovidesanaccurateandhighlydetailedcostestimateforpowerplantdesign,engineering,andconstructionincludingequipment,materialsandlabourneededfortheproject.PEACEprovidesaquickestimateofprojectcostsforvariousplantdesignsormodificationsandallowsustooptimisedesigns,consideringindetailthetrade-offbetweencostandperformanceforvariousoptions.Theannualoperationandmaintenancecostsarecombinedwiththecapitalcostestimatetoproduceanannualcashflowthroughoutthelifeoftheproject.Profitabilityindicators,suchasinternalrateofreturn(IRR)andnetpresentvalue(NPV),arealsoprovided.
Programoutputexamples:
3
Contact AlexBlatchford
Telephone+61395659873Mobile+61408319842Emailablatchford@hrl.com.au
Needmoreinformation?Gotohrl.com.au
Thecompany’sNATAAccreditedLaboratories
numberis561.
HRLTechnologyGroup’sISO9001QualityManagementiscertifiedbyBSIundercertificate
FS605116
Ó2016HRLTechnologyGroupPtyLtd