Power Plant Simulation Conference
2011Tampa, Florida
February 16, 2011
James B. FlorenceANS-3.5 Chair
![Page 2: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/2.jpg)
Introduce ANS-3.5 Working Group
ANS-3.5 WebPages
Recent ANS-3.5-2009 Clarifications
ANS-3.5-201X Revised Scope
Focus Areas for ANS-3.5-201X
ANS-3.5 Standards Adoption History
Q&A with ANS-3.5 Working Group
![Page 3: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/3.jpg)
Officers Jim Florence (Cooper) – Chair
Bob Felker (Western Services Corp.) – Vice Chair
Keith Welchel (Oconee) – Secretary
Butch Colby (L3 MAPPS) – Editor
SK Chang (Millstone) – Style Editor
Larry Vick (NRC) - Parliamentarian
![Page 4: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/4.jpg)
Robert Goldman (Grand Gulf) David Goodman (Comanche Peak) Dennis Koutouzis (INPO) Jody Lawter (Summer) George McCullough (GSE) Mac McDade (Harris) Michael Petersen (Monticello/Prairie Island) Pablo Rey (Tecnatom – Spain) James Sale (North Anna) Frank Tarselli (Independent)
![Page 5: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/5.jpg)
![Page 6: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/6.jpg)
The ANS-3.5 WebPages can be accessed via:◦ www.ans.org◦ www.usug.org
Find:◦ Scope Statement◦ Membership Contact Information◦ Meeting Locations◦ Meeting Minutes◦ Link to ANS-3.5 Clarifications◦ How to submit clarification requests
![Page 7: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/7.jpg)
Recent clarifications are posted at: http://www.new.ans.org/standards/clarifications/
![Page 8: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/8.jpg)
Revised Scope (pending approval of ANS-21 & NFSC):
This standard establishes the functional requirements for full scope nuclear power plant control room simulators that are subject to U.S. Nuclear Regulatory Commission (NRC) regulation for use in operator training and examination. The standard also establishes criteria for the scope of simulation, performance, and functional capabilities of nuclear power plant control room simulators.
This standard does not establish criteria for the use of simulators in operator training programs.
![Page 9: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/9.jpg)
Define the Term Training Needs Assessment in such a manner that it is clear in intent to both Training and Simulator staff
Performance Test Program
Review Malfunction List
Define Testing Periodicities◦ Limits of Simulation◦ Steady-State & Normal Evolutions◦ Malfunctions◦ Physical Fidelity & Human Factors◦ Instructor Station◦ Real Time & Repeatability
![Page 10: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/10.jpg)
Non-fully integrated performance testing
Next generation simulators
Configuration Management
Uses of simulators for other than operator training & examination
Consider international community needs
Address experience requirements & reactivity control manipulations
![Page 11: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/11.jpg)
Identify areas in the standard to address DCS
Address other simulation devices derived directly from the full scope control room simulator
Cyber security guidance
Initial Condition development criteria for performance tests
![Page 12: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/12.jpg)
A Full History of Full Scope NuclearPower Plant (NPP) Simulators as relatedto the ANSI/ANS-3.5 Standards
Earliest NPP Simulators were constructed upon specifications only (through the '70s) General Electric (Dresden 2) Babcock and Wilcox (Rancho Seco) Combustion Engineering (Calvert Cliffs) Westinghouse (Zion) Indian Point 2 (Consolidated Edison of New York)
![Page 13: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/13.jpg)
The age of utility-owned Simulators began in the late '70s (ConEd – Indian Point 2)
The '80s was the time of a utility-owned Simulator for every unique reference unit
Simulators for the new Reactor phase are being purchased within the Nuclear Steam Supply System contract (all COLs applications are referenced to ANSI/ANS-3.5-1998)
New Reactor phase of Simulators are scheduled for delivery in order that operators can be trained and licensed before criticality
![Page 14: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/14.jpg)
![Page 15: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/15.jpg)
![Page 16: Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair.](https://reader035.fdocuments.us/reader035/viewer/2022070323/56649d9e5503460f94a886f6/html5/thumbnails/16.jpg)
Questions?