Post Go-Live Questionnaire
EVO31 Post go-live questionnaire 1
Project Date Project Manager (Pastel) Project Manager (Cust)
Enter customer name
Objective:
The objective of this questionnaire is to document the results and possible issues of the initial Pastel Evolution Go-Live and to determine whether additional services and/or enhancement are desired or recommended to gain additional value from the Pastel Evolution implementation.
This questionnaire should be discussed with the customer about two to three weeks after initial go-live.
Contents
Pastel Evolution Go-Live Results ................................................................................................................... 2
Project Management .................................................................................................................................. 2
System Management ................................................................................................................................. 2
System Availability and Activity Check ....................................................................................................... 3
System Administration ................................................................................................................................ 4
User Acceptance ........................................................................................................................................ 4
Enhancements ............................................................................................................................................... 5
Functions .................................................................................................................................................... 5
Configuration .............................................................................................................................................. 5
Documentation ........................................................................................................................................... 6
Signatures .................................................................................................................................................. 6
-
Post Go-Live Questionnaire
EVO31 Post go-live questionnaire 2
Pastel Evolution Go-Live Results Verify that all components of Pastel Evolution implemented during the initial go-live are functional and have generated the desired results.
Project Management
Is the backup strategy performed on a regular basis? Yes No
Have there been any issues with the backup strategy? Yes No
If yes, please provide additional detail.
Is recovery of the database possible at any time using the current backups?
Yes No
If no, please provide additional detail.
Have there been any issues with the stability of the database? Yes No
If yes, please provide additional detail.
System Management
Has all hardware been installed and operative?
Yes No
If no, please provide additional detail.
Has system performance been satisfactory?
Yes No
If no, please provide additional detail.
Are unique business processes addressed?
Yes No
If no, please provide additional detail.
Are SDK developments and add-ons satisfactory?
Yes No
If no, please provide additional detail.
Other comments:
-
Post Go-Live Questionnaire
EVO31 Post go-live questionnaire 3
System Availability and Activity Check
Are all interfaces operative? Yes No
If no, please provide additional detail.
Is document printing working properly? Yes No
If no, please provide additional detail.
Could all in-scope key business processes be completed properly with the system?
Yes No
If no, please provide additional detail.
Have the following document types been created in the system:
Sales documents Yes No
Purchasing documents Yes No
Accounting documents Yes No
Inventory transactions Yes No
If no, please provide additional information.
Are bank reconciliations performed? Yes No
If no, please provide additional information.
Can customer run all reports as required? Yes No
If no, please provide additional information.
Has period-end closing been successfully completed? Yes No
If no, please provide additional information.
Other comments:
-
Post Go-Live Questionnaire
EVO31 Post go-live questionnaire 4
System Administration
Has customer been able to complete all system administration procedures?
Yes No
If no, please provide additional information.
Has outside support from consulting partner or Pastel been needed? Yes No
If yes, please provide additional information.
Were there any escalations? Yes No
If yes, please provide additional information.
Other comments:
User Acceptance
Do all users know their part of the system and how to operate it? Yes No
If no, please provide additional information.
Is there any need for additional training? Yes No
If yes, please provide additional information.
-
Post Go-Live Questionnaire
EVO31 Post go-live questionnaire 5
Enhancements Additional possibilities with Pastel Evolution to further the return gained from the software investment made by the customer.
Functions
Are there any additional functions/requirements in the areas listed below that customer would like to have addressed?
Functional area Comments
Administration Yes No
Sales Yes No
Purchasing Yes No
Accounting Yes No
Banking Yes No
Inventory Management Yes No
Service Management Yes No
Others, please list:
___________________
Configuration
Which reports are frequently being used by the customer?
List reports needed but currently not available in customer Pastel Evolution implementation?
Is MS Excel being used?
Are alerts needed? If yes, in which areas?
Are additional interfaces needed? If yes, please elaborate.
Are additional queries needed? If yes, where?
Other comments:
-
Post Go-Live Questionnaire
EVO31 Post go-live questionnaire 6
Documentation
Have all business processes been documented?
Yes No
If no, please provide additional information.
Signatures By signing below, the parties agree that the information in this document is correct and that the Pastel Evolution system is ready in production database.
Signature: ______________________________ Signature: __________________________
Name: ______________________________ Name: ______________________________
Position held: ______________________________ Position held: ______________________________