Post globe 2010 alfred hambsch

16
ISO 9001 : 2000 FM 63264 ISO 14001 : 2004 EMS 64705 E Waste Management Alfred Hambsch New Opportunities

description

Post Globe 2010 presentation

Transcript of Post globe 2010 alfred hambsch

Page 1: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

E Waste Management

Alfred Hambsch

What is Electric and Electronic Waste? Or e-Waste New Opportunities

Page 2: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

2007

1995

2009

1984

Barrie Metals

opens in Barrie

Ontario

3 employees

Barrie

Metals/CRI

expands to

220 John Street

650k sq ft

facility

New head office

30 employees

GEEP

12 LOCATIONS

3 USA

6 Canada

1 Central America

1 Europe

570 employees

GEEP

Deployed first ERP I + II

Nano fuel is developed

150 employees

Corporate History

2010+

GEEP

•Glass Plant

•Plastic Plant

•4 New USA JV’s

•4 New EU JV’s

• South American JV

• Asian JV

Page 3: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

E waste streams

1.TV-CRT = Glass

2.Low Grade Cu Bearing = Fax-Photocopier-Printer

3.High Grade = Precious Metal Bearing

E Waste FundamentalsNorth American Model

Page 4: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

Commodity Needed Mining Source

required

E Waste source

required

1 MT STEEL 2 MT Refined ore 2 MT E WASTE

1 MT COPPER 200 MT COPPER ORE 14 MT E WASTE

1 MT GOLD 200,000 MT ORE 70,000 MT E WASTE

The Value of E waste Recycling

Page 5: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

OMCEquipment

Manufacturer

WEEE

Closed Loop or Cradle to Cradle

IBM

Dell

HP

Sony

Acer

Lenovo

Apple

Samsung

Foxcom

Selectron

Jabil

Wistron

EuropeSIMS

Stena

Remondis

R-Plus

Vieola

GEEP

ASIASIMS

Li Tong

Cemilia

Tes-Amm

Centillion

GEEP

USASIMS

GEEP

ECS

CreativeIntecra

Electronic R.I

Redemtech

Metech

Global Solutions

----------- -----------

Military

Hospitals

Insurance

Banks

Education

Government

Value Added

Resellers

Page 6: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

GEEP: Global Technology Advantage

Software – TechProtect International

Global logistic inventory and commodity tracking system

Refurbishing – EBAN

Secure information and data destruction for computers and mobile devices

Remarketing

Through wholesale, retail, and Web-based sales globally

End of Life Destruction

Environmentally friendly, cost effective, proprietary equipment turning e waste to commodities with a zero landfill objective

Assay and Analysis

Assessing different precious metal contents before refining and recovery / R&D for development and testing of new Equipment

Nano Fuel Technology

Turning mixed waste plastic into diesel fuel

Page 7: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

Our Processes

Electronic Recycling Plant I (ERP I)

‘Heavy’ WEEE Processing

Page 8: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

GEEP Processing ERP I System

100% MIXED E WASTE IN

Up to 50% Ferrous Out

Imager

Mixed Plastic and Metal

50% Imager output

Chain Shredder

Automatic

50%

20%

30% = 100% Imager FeedMIX

50% Imager output

Clean Plastic

85% Recovered and 15% to ERP II

CU ALU

MIX

Page 9: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

Our Processes

Electronic Recycling Plant II (ERP II)

‘Light’ WEEE Processing

Page 10: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

ERPII + Centrifuge = Metal Separation

Hammer mill Centrifuge Screening Aluminum (delamitation) (sorting size) Separation

Mixed Red Metals and Precious Metals

Clean Aluminum

LOW GRADE CIRCUIT BOARD

100%IN

IN

Fiberglass

Page 11: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

Recycling of TV/Monitors

GLASS TO GLASS

Processing

Page 12: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

ABSPE

PVC

PP

ABS Fr BlendsPOM

PC

PC/ABS

PBT/PETPMMA

Mixed Plastics are 30 % of all Mixed E- Waste Output

Principle of FLOAT - SINK separation

End Result is: •Clean ABS•Clean PS•Clean PP

Mixed Plasticto Nano Fuel

Mixed plastics: ABS, PS, PE, PP, metals etc.

Sinking Fraction• PS, ABS, metals

Tank #2

Tank #1 Tank

#3

Page 13: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

NanoFuels

The NanoFuels process converts 2 parts of mixed plastic waste and 1 part of waste oil (e.g. used engine oils) to yield about 80% diesel fuel and 20% coke as a by-product.

Page 14: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

GEEP PROCESSING ERP I & II

GEEP ASSET MANAGEMENT CENTRES

Barrie, EdmontonBC, AB, ON, PQ, SK

24 NATIONAL TRANSFER STATION LOCATOINS

3

2

12

4

3

GEEP CANADA

Page 15: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

ERP I ERP I & II &III

Glass Plant Plastic Plant PM Refining

SEATLE SAN FRANCISCO LOS ANGELES LAS VEGAS PHEONIX DALLAS KANSAS CITY DENVER COLUMBUS DETROIT MINNEAPOLIS CHICAGO DETROIT ATLANTA RALEIGH NEW YORK NEWARK TAMPA OTHERS

Page 16: Post globe 2010 alfred hambsch

ISO 9001 : 2000

FM 63264

ISO 14001 : 2004

EMS 64705

The Responsible Alternative

Thank You