Austin Music Hall Demo. Brazos & E 6th St & 7th St: AE Chilled Water - Aloft Hotel Red River, 15th to 19th: STREET CLOSED 111 Congress Ave 2nd St Bridge & Trail Electric Drive W. 3rd St Improvements: West Ave to Shoal Creek Lower Shoal Creek Improvements Waller Creek Tunnel - Tunnel & 4th Street Creek Side Inlet Waller Creek Tunnel - Waterloo Park Site Restoration South Bites lot construction (Parking lot on Driskill) 81.5 Rainey St at Bangers E. 6th St, IH-35 to Comal (2017) The Chicon Corridor Palm Park Mains to Junction 420 Mains to Capitol Complex/AISD Nueces St, N. of 2nd St 3rd St, Phase IV Improvements Guadalupe to Nueces New Theatre at Zach Scott The Catherine Riverside and Lamar Preliminary Plan Texas Faciliites Commsion - Capitol Complex CAPITOL UT CAMPUS Waller Creek Tunnel East Bouldin - One Texas Center Water Quality retrofits First Baptist Church Ministry Center Red River Flats 801 Red River 9th & Red River Hotel: 6th St & Waller 907 E. 6th St 901 E. 6th St & Brushy St Green Water Block 185 10/1/2015 - 3/1/2018 Intake and Utility Buildings 6/1/2017 - 6/1/2019 5th & Brazos Hotel 9/1/2016 - 9/1/2018 Waller Park Place 11/1/2016 - 2/1/2019 1155 Barton Springs 9/1/2015 - 11/1/2016 Saltillo District Redevelopment 721 Congress / The Avenue 5/1/2017 - 5/1/2019 Episcopal Church Block 87 - 8/1/2017 - 10/1/2019 East Austin Hotel 10/1/2015 - 3/1/2017 6th & Nueces Hotel site 6/1/2016 - 11/1/2017 UT System - Block 71 Rainey St. Hotel (formerly Kimber Modern) - 9/1/2016 Kline Hotel 8/1/2016 - 12/1/2017 Downtown MetroRail Station Expansion 48 East 10/1/2016 - 10/1/2018 RBJ Center Redevelopment 4/15/2016 - 11/1/2017 Mexic-Arte Museum 6/1/2017 - 6/1/2019 Waterloo Park Tower Hotel Spire 7/1/2016 - 11/1/2017 Osten Hall 405 Colorado State office building #1 State office building #2 Marriott Hotel at Cesar Chavez Sabine Street Promenade 1/7/2017 - 8/31/2019 Central Health Brackenridge Campus Redevelopment San Marcos Hotel Austin American Statesman waterfront property Texas Association of Counties Sutton Villas site 10/1/2017 - 11/1/2019 East 9th Street Multifamily W. Sixth Micro Project Autograph Collection Hotel and AC Hotel by Marriott 7/1/2017 - 3/1/2019 Austin Energy Substation - 8/31/2016 Seaholm Library 5/30/2013 - 4/1/2017 500 W. 2nd Street (Green Water Block 23) 12/15/2014 - 2/1/2017 Austin Proper Hotel & Residences 9/1/2016 - 4/1/2018 The Independent 3/1/2016 - 5/15/2018 Third + Shoal 9/1/2016 - 9/1/2018 300 E. Riverside 1/2/2015 - 8/1/2016 70 Rainey Street 8/2/2016 - 3/1/2018 801 Barton Springs 9/1/2016 - 3/1/2018 Gables Republic Park / Hotel ZaZa 7/10/2016 - 5/1/2018 The Contemporary Austin Jones Center Renovation 5/1/2016 - 11/1/2016 8th & Nueces 3/1/2015 - 10/1/2016 Fairmont Hotel 11/3/2014 - 6/1/2017 422 at the Lake 10/1/2013 - 5/25/2016 Travis County Ronnie Earle Building 4/1/2016 - 9/1/2017 New UT System Administration Building 4/1/2015 - 7/1/2017 Dell Medical Health . Transformation Building & Garage 7/1/2014 - 6/30/2016 The Riley 7/1/2015 - 12/1/2016 Aloft and Element Hotels 8/24/2015 - 6/1/2017 Tyndall Condos at Robertson Hill 8/1/2016 - 3/1/2018 5th + West 1/15/2015 - 4/1/2017 Dell Seton Medical Center at The University of Texas 7/1/2014 - 4/1/2017 UT Robert B. Rowling Hall 11/7/2014 - 2/1/2017 908 Nueces Condominiums 9/1/2015 - 11/1/2016 Shoal Creek Walk, Building 1 8/28/2015 - 7/1/2017 1306 West Avenue 6/1/2016 - 12/1/2017 Republic Sq, Phase II 6/1/2016 - 3/10/2017 Homewood Suites at East Avenue 2/1/2016 - 12/1/2017 Dell Medical Health Discovery Building 7/1/2014 - 6/30/2016 Hyatt House Hotel 9/1/2015 - 3/1/2017 The Zilker 1155 Barton Springs 9/1/2015 - 11/1/2016 310 Comal Studio East E. 6th & Chicon Hotel 1614 E. 6th St Eastside Village Saltillo Station Chicon Mixed-use PSW E.7th St Mixed-use Building 2025 E. 7th St (former Bois D'Arc Market) 2021 E. 5th St 1615 E.7th St Corazon Hotel Huston-Tillotson University Health & Wellness Center Juniper Townhomes Hotel Eleven Huston Heights The Stonewall (townhomes) 1301 W. 5th St 315 Pressler (Pressler Park) 1010 W. 10th Condos 1000 N. Lamar Cesar Chavez office dgmartin CESAR CHAVEZ RIVER BOWIE ENFIELD 5TH COMAL MEDINA 7TH W E S T L Y N N HOLLY BLANCO M ART IN LUTHER KING J R 12TH RIVERVIEW 15 T H EB T O LAMAR NB CATALPA BUTLER BIERCE NAVASOTA 6TH ROSEWOOD 15TH 2ND GREGORY 11TH BAYLOR 3RD RIO GRANDE LINCOLN 4TH TAYLOR YALE MAPLE ALAMO 17TH SAYERS SAN BERNARD COTTON PEOPLES CASTLE 20TH BARTON SPRINGS SAN GABRIEL HILLMONT 16TH WALSH 8TH WATERSTON P L E AS AN T VA L OLIVE DAWSON PALMA GUADALUPE 14TH 13TH MILL 9TH HALF NEW YORK S L DAVIS 165 PENNSYLVANIA RAINEY MARSHALL 21ST 10TH BRYA BRAZOS CHALMERS JOSEPHINE PEARL SPENCE DRISKILL ELKHART J ESS E E SEGOV IA ANTHONY SABINE CANEY TOYATH LYNN COLORADO ATTAYAC 18TH CONGRESS NECHES 9TH COLETO LEONA BOB HARRISON POQUITO KINNEY CONCHO OLANDER POWER PLANT DR SALINA SHELLEY 10TH HALF LORRAIN HAMILTON COLLEGE TILLOTSON HACKBERRY WHITIS CANTERBURY CORNELL WILLOW GARDEN HASKELL HAYWOOD LEE BARTON WOOD EASON MAUFRAIS ELM LAMBIE 11TH HALF SPEEDWAY CASTLE HILL PATTERSON JESSIE W C E S A R CHA V EZ TO N EWF I EL THERESA N I H 3 5 S B T O 1 2 T H NORTHWE HENDERSON SHOAL C R EE K E 1 2 T H T O I H 3 5 N B RIVERSIDE WEST § ¨ ¦ 35 WALLER SAN JACINTO R E D R I V E R CHESTNUT CHICON LAMAR CURVE ANGELINA LYDIA EAST TRINITY ROBERT T MARTINEZ JR LAVACA SAN ANTONIO JESTER NUECES LAWSON 1ST 12TH 13TH 14TH 2ND 3RD 4TH BRAZOS CONGRESS 11TH 5TH 6TH 7TH 8TH 9TH 10TH TOOMEY SAN MARCOS ADAM L. CHAPA SR Reference: Site Plans DOWNTOWN EMERGING PROJECTS Planned Under Construction 1: Proposed; 2: In Review 3: Approved 7: Active 14: Closed CONSTRUCTION PROJECTS 111 Congress Ave 2nd St Bridge & Trail 81.5 Rainey at "Bangers" Austin Music Hall Demolition Brazos & E 6th St & 7th St: AE Chilled Water - Aloft Hotel E. 6th St, IH-35 to Comal (2017) Electric Drive Mains to Capitol Complex/AISD Mains to Junction 420 Nueces St, N. of 2nd St Palm Park Red River, 15th to 19th: STREET CLOSED Republic Square Park Seaholm Library Shoal Creek Improvements South Bites lot construction (Parking lot on Driskill) Texa Faciliites Commsion - Capitol Complex Project The Chicon Corridor W. 3rd St Improvements: West Ave to Shoal Creek W. 3rd St, Guadalupe to Nueces Waller Creek Tunnel - Tunnel & 4th St. Creek Side Inlet Waller Creek Tunnel - Waterloo Park Site Restoration PERMITS LAND PROJECTS RECLAIMED WATER ROADWAY WATER STREET EXCAVATION UTILITY PENDING PERMIT WASTEWATER STORM DRAIN CapMetro: 801 + 803 Rapid Bus Routes CIP Projects: (OCT) - (APR) 2016-17 (DM) IT IS THE RESPONSIBILITY OF THE PROMOTERS AND AFFECTED ASSOCIATES TO CONTACT THE AUSTIN CENTER FOR EVENTS FOR COORDINATION. CONSTRUCTION DATES ARE SUBJECT TO CHANGE WITHOUT NOTICE. THEY ARE REPRESENTED AS KNOW AT DATE OF MAP PRODUCTION. IF AN EVENT OR VENUE LOCATION IS NOT IDENTIFIED ON THE MAP, IT DOES NOT MEAN THAT IT IS NOT AFFECTED BY CONSTRUCTION. This product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surveying purposes. It does not represent an on-the-ground survey and represents only the approximate relative location of property boundaries. This product has been produced by Austin Transportation Department for the sole purpose of geographic reference. No warranty is made by the City of Austin regarding specific accuracy or completeness. 0 1,000 2,000 500 Feet ´ NOV - MAR 2017 Plotted: 12/8/2016 POSSIBLE CONSTRUCTION CONFLICTS dgmartin dgmartin dgmartin

Transcript of POSSIBLE CONSTRUCTION CONFLICTS - Austin, …...Central Health Brackenridge Campus Redevelopment S...

Page 1: POSSIBLE CONSTRUCTION CONFLICTS - Austin, …...Central Health Brackenridge Campus Redevelopment S an M rcos Hotel Austin American Statesman waterfront property Texas Association of

Austin Music Hall Demo.

Brazos & E 6th St &7th St: AE ChilledWater - Aloft Hotel

Red River, 15th to 19th: STREET CLOSED

111 Congress Ave

2nd St Bridge & Trail

Electric Drive

W. 3rd St Improvements: West Ave to Shoal Creek

Lower Shoal Creek Improvements

Waller Creek Tunnel -Tunnel & 4th StreetCreek Side Inlet

Waller Creek Tunnel - Waterloo ParkSite Restoration

South Bites lot construction (Parking lot on Driskill)

81.5 Rainey Stat Bangers

E. 6th St, IH-35 to Comal (2017)

The ChiconCorridor

PalmPark

Mains

to Ju

nctio

n 420

Mains to Capitol Complex/AISD

Nueces St, N. of 2nd St

3rd St, Phase IV Improvements Guadalupe to Nueces

New Theatreat Zach Scott

TheCatherine

Riverside and LamarPreliminary Plan

TexasFaciliitesCommsion - Capitol Complex

CAPITOL

UT CAMPUS

Waller Creek Tunnel

East Bouldin - One Texas Center Water Quality retrofits

First Baptist Church Ministry

Center

RedRiverFlats

801RedRiver

9th &Red

RiverHotel:6th St & Waller

907 E. 6th St901 E. 6th St &Brushy St

Green Water Block 185 10/1/2015 - 3/1/2018

Intake and Utility Buildings6/1/2017 - 6/1/2019

5th & Brazos Hotel9/1/2016 - 9/1/2018

Waller Park Place11/1/2016 - 2/1/2019

1155 Barton Springs9/1/2015 - 11/1/2016

Saltillo DistrictRedevelopment

721 Congress /The Avenue5/1/2017 - 5/1/2019

Episcopal Church Block 87 -8/1/2017 - 10/1/2019

East Austin Hotel

10/1/2015 -3/1/2017

6th & Nueces Hotel site6/1/2016 - 11/1/2017

UT System -Block 71

Rainey St. Hotel(formerly Kimber Modern)- 9/1/2016

Kline Hotel8/1/2016 - 12/1/2017

Downtown MetroRailStation Expansion

48 East10/1/2016 -10/1/2018 RBJ Center

Redevelopment4/15/2016 - 11/1/2017

Mexic-Arte Museum 6/1/2017 - 6/1/2019

WaterlooPark TowerHotel

Spire7/1/2016 - 11/1/2017

OstenHall

405 Colorado

State officebuilding #1

State officebuilding #2

Marriott Hotel atCesar

Chavez

Sabine Street

Promenade1/7/2017 - 8/31/2019

Central Health Brackenridge Campus

Redevelopment

San MarcosHotel

Austin American Statesmanwaterfront property

Texas Associationof Counties

Sutton Villas site10/1/2017 - 11/1/2019

East 9th StreetMultifamilyW. Sixth

MicroProject

Autograph Collection Hotel andAC Hotel by Marriott

7/1/2017 - 3/1/2019

Music Lane Mixed Use5/1/2017

- 5/1/2019

Austin Energy Substation - 8/31/2016

Seaholm Library5/30/2013 - 4/1/2017

500 W. 2nd Street(Green Water Block 23) 12/15/2014 - 2/1/2017

Austin Proper Hotel& Residences9/1/2016 - 4/1/2018

The Independent3/1/2016 - 5/15/2018 Third + Shoal

9/1/2016 -9/1/2018

300 E. Riverside1/2/2015 -8/1/2016

70 Rainey Street8/2/2016 - 3/1/2018

801 Barton Springs9/1/2016 - 3/1/2018

Gables RepublicPark / Hotel ZaZa7/10/2016 - 5/1/2018

The ContemporaryAustin Jones Center Renovation5/1/2016 - 11/1/20168th & Nueces

3/1/2015 - 10/1/2016

Fairmont Hotel11/3/2014 - 6/1/2017

422 at the Lake10/1/2013 - 5/25/2016

Travis County RonnieEarle Building

4/1/2016 - 9/1/2017

New UT SystemAdministration

Building4/1/2015 - 7/1/2017

Dell Medical Health .Transformation

Building & Garage7/1/2014 - 6/30/2016

The Riley7/1/2015 - 12/1/2016

Aloft and Element Hotels

8/24/2015- 6/1/2017

Tyndall Condos at Robertson Hill 8/1/2016 - 3/1/2018

5th + West1/15/2015 - 4/1/2017

Dell Seton Medical Center atThe University of Texas7/1/2014 - 4/1/2017

UT RobertB. Rowling Hall11/7/2014 - 2/1/2017

908 Nueces Condominiums9/1/2015 - 11/1/2016

Shoal CreekWalk, Building 1

8/28/2015 - 7/1/2017

1306 West Avenue6/1/2016

- 12/1/2017

RepublicSq, Phase II

6/1/2016 - 3/10/2017

Homewood Suites at East Avenue 2/1/2016 - 12/1/2017

Dell Medical HealthDiscovery Building7/1/2014 - 6/30/2016

Hyatt House Hotel9/1/2015 - 3/1/2017

The Zilker1155 Barton Springs9/1/2015 - 11/1/2016

310 Comal

StudioEast

E. 6th &Chicon Hotel

1614 E. 6th St

Eastside Village

Saltillo Station ChiconMixed-use

PSW E.7th StMixed-use Building

2025 E. 7th St(former Bois D'ArcMarket)

2021 E. 5th St

1615 E.7th St

CorazonHotel

Huston-TillotsonUniversity Health& Wellness Center

Juniper Townhomes

Hotel Eleven

HustonHeights

The Stonewall(townhomes)

1301 W. 5th St315 Pressler(Pressler Park)

1010 W. 10th Condos1000 N. Lamar

CesarChavezoffice

dgmartin

CESAR CHAVEZ

RIVER

BOWI

E

ENFIELD

5TH

COMA

L

MEDIN

A

7TH

WEST

LYNN

HOLLY

BLANC

O

MARTIN LUTHER KING JR

12TH

RIVERVIEW

15TH EB TOLAMAR NB

CATALPA

BUTLER

BIERC

E

NAVA

SOTA

6TH

ROSEWOOD

15TH

2ND

GREGORY11TH

BAYLO

R

3RD

RIO GR

ANDE

LINCO

LN

4TH

TAYLOR

YALE

MAPLE

ALAMO

17TH

SAYERS

SAN BERNARDCOTTON

PEOPLES

CASTL

E

20TH

BARTON SPRINGS

SAN G

ABRIE

L

HILLMONT

16TH

WALSH

8TH

WATERSTON

PLEASANT VALLEY

OLIVE

DAWSON

PALMA

GUAD

ALUPE

14TH

13TH

MILL

9TH HALF

NEW YORK

S L DAVIS

165

PENNSYLVANIA

RAINE

Y

MARSH

ALL

21ST

10TH

BRYAN

BRAZ

OS

CHALM

ERS

JOSEPHIN

E

PEARL

SPENCE

DRISKILL

ELKHA

RT

JESSE E SEGOVIA

ANTH

ONY

SABIN

E

CANE

Y

TOYAT

H

LYNN

COLO

RADO

ATTAYA

C

18TH

CONG

RESS

NECH

ES

9TH

COLETO

LEONABOB HARRISON

POQUITO

KINNE

Y

CONCHO

OLANDER

POWER PLANT DR

SALIN

A

SHELL

EY

10TH HALF

LORR

AIN HAMILTON

COLLEGE

TILLOTSON

HACKBERRY

WHITISCANTERBURY

CORNELL

WILLOW

GARDEN

HASKELL

HAYW

OOD

LEE BA

RTON

WOOD

EASO

N

MAUF

RAIS

ELM

LAMBIE

11TH HALF

SPEEDWAY

CASTL

E HILL

PATTER

SON

JESSIE

WCES

ARCH

AVEZ

TONE

WFIEL

THER

ESA

N IH 3

5 SB T

O 12TH NORTHWESTERN

HEND

ERSON

SHOALCREEK

E12THTOIH35 NB

RIVERSIDE

WEST

§̈¦35

WALLE

R

SAN J

ACINT

O

R EDR

IVER

CHESTNUT

CHICO

N

LAMAR

CURVE

ANGELINA

LYDIA

EAST

TRINI

TY

ROBE

RT T M

ARTIN

EZ JR

LAVAC

A

SAN A

NTON

IO

JESTER

NUECE

S

LAWSO

N

1ST

12TH

13TH

14TH

2ND

3RD

4TH

BRAZ

OS

CONG

RESS 11TH

5TH

6TH

7TH

8TH

9TH

10TH

TOOMEY

SAN

MARC

OS

ADAM

L. CH

APA SR

Reference: Site PlansDOWNTOWN EMERGING PROJECTS

PlannedUnder Construction1: Proposed; 2: In Review3: Approved7: Active14: Closed

CONSTRUCTION PROJECTS111 Congress Ave2nd St Bridge & Trail81.5 Rainey at "Bangers"Austin Music Hall DemolitionBrazos & E 6th St & 7th St: AE Chilled Water - Aloft HotelE. 6th St, IH-35 to Comal (2017)Electric Drive Mains to Capitol Complex/AISDMains to Junction 420Nueces St, N. of 2nd StPalm ParkRed River, 15th to 19th: STREET CLOSEDRepublic Square Park Seaholm LibraryShoal Creek ImprovementsSouth Bites lot construction (Parking lot on Driskill)Texa Faciliites Commsion - Capitol Complex ProjectThe Chicon Corridor W. 3rd St Improvements: West Ave to Shoal CreekW. 3rd St, Guadalupe to NuecesWaller Creek Tunnel - Tunnel & 4th St. Creek Side InletWaller Creek Tunnel - Waterloo Park Site Restoration

PERMITSLAND PROJECTSRECLAIMED WATERROADWAYWATERSTREET EXCAVATIONUTILITY PENDING PERMITWASTEWATERSTORM DRAINCapMetro: 801 + 803 Rapid Bus RoutesCIP Projects: (OCT) - (APR) 2016-17 (DM)

IT IS THE RESPONSIBILITY OF THE PROMOTERS AND AFFECTED ASSOCIATES

TO CONTACT THE AUSTIN CENTER FOR EVENTS FOR COORDINATION.CONSTRUCTION DATES ARE SUBJECT TO CHANGE WITHOUT NOTICE.

THEY ARE REPRESENTED AS KNOWAT DATE OF MAP PRODUCTION.

IF AN EVENT OR VENUE LOCATION IS NOT IDENTIFIED ON THE MAP,IT DOES NOT MEAN THAT IT IS NOT AFFECTED BY CONSTRUCTION.

This product is for informational purposes and may not have been prepared for or be suitable forlegal, engineering, or surveying purposes. It does not represent an on-the-ground survey and represents only the approximate relative location of property boundaries.This product has been produced by Austin Transportation Department for the sole purposeof geographic reference. No warranty is made by the City of Austin regarding specific accuracyor completeness.

0 1,000 2,000500Feet ´ NOV - MAR 2017

Plotted: 12/8/2016

POSSIBLE CONSTRUCTION CONFLICTS

dgmartindgmartin

dgmartin