PROJECT AUSTIN RULZ! Discover Austin! Share Austin! ESOL Department ACC.
POSSIBLE CONSTRUCTION CONFLICTS - Austin, …...Central Health Brackenridge Campus Redevelopment S...
Transcript of POSSIBLE CONSTRUCTION CONFLICTS - Austin, …...Central Health Brackenridge Campus Redevelopment S...
Austin Music Hall Demo.
Brazos & E 6th St &7th St: AE ChilledWater - Aloft Hotel
Red River, 15th to 19th: STREET CLOSED
111 Congress Ave
2nd St Bridge & Trail
Electric Drive
W. 3rd St Improvements: West Ave to Shoal Creek
Lower Shoal Creek Improvements
Waller Creek Tunnel -Tunnel & 4th StreetCreek Side Inlet
Waller Creek Tunnel - Waterloo ParkSite Restoration
South Bites lot construction (Parking lot on Driskill)
81.5 Rainey Stat Bangers
E. 6th St, IH-35 to Comal (2017)
The ChiconCorridor
PalmPark
Mains
to Ju
nctio
n 420
Mains to Capitol Complex/AISD
Nueces St, N. of 2nd St
3rd St, Phase IV Improvements Guadalupe to Nueces
New Theatreat Zach Scott
TheCatherine
Riverside and LamarPreliminary Plan
TexasFaciliitesCommsion - Capitol Complex
CAPITOL
UT CAMPUS
Waller Creek Tunnel
East Bouldin - One Texas Center Water Quality retrofits
First Baptist Church Ministry
Center
RedRiverFlats
801RedRiver
9th &Red
RiverHotel:6th St & Waller
907 E. 6th St901 E. 6th St &Brushy St
Green Water Block 185 10/1/2015 - 3/1/2018
Intake and Utility Buildings6/1/2017 - 6/1/2019
5th & Brazos Hotel9/1/2016 - 9/1/2018
Waller Park Place11/1/2016 - 2/1/2019
1155 Barton Springs9/1/2015 - 11/1/2016
Saltillo DistrictRedevelopment
721 Congress /The Avenue5/1/2017 - 5/1/2019
Episcopal Church Block 87 -8/1/2017 - 10/1/2019
East Austin Hotel
10/1/2015 -3/1/2017
6th & Nueces Hotel site6/1/2016 - 11/1/2017
UT System -Block 71
Rainey St. Hotel(formerly Kimber Modern)- 9/1/2016
Kline Hotel8/1/2016 - 12/1/2017
Downtown MetroRailStation Expansion
48 East10/1/2016 -10/1/2018 RBJ Center
Redevelopment4/15/2016 - 11/1/2017
Mexic-Arte Museum 6/1/2017 - 6/1/2019
WaterlooPark TowerHotel
Spire7/1/2016 - 11/1/2017
OstenHall
405 Colorado
State officebuilding #1
State officebuilding #2
Marriott Hotel atCesar
Chavez
Sabine Street
Promenade1/7/2017 - 8/31/2019
Central Health Brackenridge Campus
Redevelopment
San MarcosHotel
Austin American Statesmanwaterfront property
Texas Associationof Counties
Sutton Villas site10/1/2017 - 11/1/2019
East 9th StreetMultifamilyW. Sixth
MicroProject
Autograph Collection Hotel andAC Hotel by Marriott
7/1/2017 - 3/1/2019
Music Lane Mixed Use5/1/2017
- 5/1/2019
Austin Energy Substation - 8/31/2016
Seaholm Library5/30/2013 - 4/1/2017
500 W. 2nd Street(Green Water Block 23) 12/15/2014 - 2/1/2017
Austin Proper Hotel& Residences9/1/2016 - 4/1/2018
The Independent3/1/2016 - 5/15/2018 Third + Shoal
9/1/2016 -9/1/2018
300 E. Riverside1/2/2015 -8/1/2016
70 Rainey Street8/2/2016 - 3/1/2018
801 Barton Springs9/1/2016 - 3/1/2018
Gables RepublicPark / Hotel ZaZa7/10/2016 - 5/1/2018
The ContemporaryAustin Jones Center Renovation5/1/2016 - 11/1/20168th & Nueces
3/1/2015 - 10/1/2016
Fairmont Hotel11/3/2014 - 6/1/2017
422 at the Lake10/1/2013 - 5/25/2016
Travis County RonnieEarle Building
4/1/2016 - 9/1/2017
New UT SystemAdministration
Building4/1/2015 - 7/1/2017
Dell Medical Health .Transformation
Building & Garage7/1/2014 - 6/30/2016
The Riley7/1/2015 - 12/1/2016
Aloft and Element Hotels
8/24/2015- 6/1/2017
Tyndall Condos at Robertson Hill 8/1/2016 - 3/1/2018
5th + West1/15/2015 - 4/1/2017
Dell Seton Medical Center atThe University of Texas7/1/2014 - 4/1/2017
UT RobertB. Rowling Hall11/7/2014 - 2/1/2017
908 Nueces Condominiums9/1/2015 - 11/1/2016
Shoal CreekWalk, Building 1
8/28/2015 - 7/1/2017
1306 West Avenue6/1/2016
- 12/1/2017
RepublicSq, Phase II
6/1/2016 - 3/10/2017
Homewood Suites at East Avenue 2/1/2016 - 12/1/2017
Dell Medical HealthDiscovery Building7/1/2014 - 6/30/2016
Hyatt House Hotel9/1/2015 - 3/1/2017
The Zilker1155 Barton Springs9/1/2015 - 11/1/2016
310 Comal
StudioEast
E. 6th &Chicon Hotel
1614 E. 6th St
Eastside Village
Saltillo Station ChiconMixed-use
PSW E.7th StMixed-use Building
2025 E. 7th St(former Bois D'ArcMarket)
2021 E. 5th St
1615 E.7th St
CorazonHotel
Huston-TillotsonUniversity Health& Wellness Center
Juniper Townhomes
Hotel Eleven
HustonHeights
The Stonewall(townhomes)
1301 W. 5th St315 Pressler(Pressler Park)
1010 W. 10th Condos1000 N. Lamar
CesarChavezoffice
dgmartin
CESAR CHAVEZ
RIVER
BOWI
E
ENFIELD
5TH
COMA
L
MEDIN
A
7TH
WEST
LYNN
HOLLY
BLANC
O
MARTIN LUTHER KING JR
12TH
RIVERVIEW
15TH EB TOLAMAR NB
CATALPA
BUTLER
BIERC
E
NAVA
SOTA
6TH
ROSEWOOD
15TH
2ND
GREGORY11TH
BAYLO
R
3RD
RIO GR
ANDE
LINCO
LN
4TH
TAYLOR
YALE
MAPLE
ALAMO
17TH
SAYERS
SAN BERNARDCOTTON
PEOPLES
CASTL
E
20TH
BARTON SPRINGS
SAN G
ABRIE
L
HILLMONT
16TH
WALSH
8TH
WATERSTON
PLEASANT VALLEY
OLIVE
DAWSON
PALMA
GUAD
ALUPE
14TH
13TH
MILL
9TH HALF
NEW YORK
S L DAVIS
165
PENNSYLVANIA
RAINE
Y
MARSH
ALL
21ST
10TH
BRYAN
BRAZ
OS
CHALM
ERS
JOSEPHIN
E
PEARL
SPENCE
DRISKILL
ELKHA
RT
JESSE E SEGOVIA
ANTH
ONY
SABIN
E
CANE
Y
TOYAT
H
LYNN
COLO
RADO
ATTAYA
C
18TH
CONG
RESS
NECH
ES
9TH
COLETO
LEONABOB HARRISON
POQUITO
KINNE
Y
CONCHO
OLANDER
POWER PLANT DR
SALIN
A
SHELL
EY
10TH HALF
LORR
AIN HAMILTON
COLLEGE
TILLOTSON
HACKBERRY
WHITISCANTERBURY
CORNELL
WILLOW
GARDEN
HASKELL
HAYW
OOD
LEE BA
RTON
WOOD
EASO
N
MAUF
RAIS
ELM
LAMBIE
11TH HALF
SPEEDWAY
CASTL
E HILL
PATTER
SON
JESSIE
WCES
ARCH
AVEZ
TONE
WFIEL
THER
ESA
N IH 3
5 SB T
O 12TH NORTHWESTERN
HEND
ERSON
SHOALCREEK
E12THTOIH35 NB
RIVERSIDE
WEST
§̈¦35
WALLE
R
SAN J
ACINT
O
R EDR
IVER
CHESTNUT
CHICO
N
LAMAR
CURVE
ANGELINA
LYDIA
EAST
TRINI
TY
ROBE
RT T M
ARTIN
EZ JR
LAVAC
A
SAN A
NTON
IO
JESTER
NUECE
S
LAWSO
N
1ST
12TH
13TH
14TH
2ND
3RD
4TH
BRAZ
OS
CONG
RESS 11TH
5TH
6TH
7TH
8TH
9TH
10TH
TOOMEY
SAN
MARC
OS
ADAM
L. CH
APA SR
Reference: Site PlansDOWNTOWN EMERGING PROJECTS
PlannedUnder Construction1: Proposed; 2: In Review3: Approved7: Active14: Closed
CONSTRUCTION PROJECTS111 Congress Ave2nd St Bridge & Trail81.5 Rainey at "Bangers"Austin Music Hall DemolitionBrazos & E 6th St & 7th St: AE Chilled Water - Aloft HotelE. 6th St, IH-35 to Comal (2017)Electric Drive Mains to Capitol Complex/AISDMains to Junction 420Nueces St, N. of 2nd StPalm ParkRed River, 15th to 19th: STREET CLOSEDRepublic Square Park Seaholm LibraryShoal Creek ImprovementsSouth Bites lot construction (Parking lot on Driskill)Texa Faciliites Commsion - Capitol Complex ProjectThe Chicon Corridor W. 3rd St Improvements: West Ave to Shoal CreekW. 3rd St, Guadalupe to NuecesWaller Creek Tunnel - Tunnel & 4th St. Creek Side InletWaller Creek Tunnel - Waterloo Park Site Restoration
PERMITSLAND PROJECTSRECLAIMED WATERROADWAYWATERSTREET EXCAVATIONUTILITY PENDING PERMITWASTEWATERSTORM DRAINCapMetro: 801 + 803 Rapid Bus RoutesCIP Projects: (OCT) - (APR) 2016-17 (DM)
IT IS THE RESPONSIBILITY OF THE PROMOTERS AND AFFECTED ASSOCIATES
TO CONTACT THE AUSTIN CENTER FOR EVENTS FOR COORDINATION.CONSTRUCTION DATES ARE SUBJECT TO CHANGE WITHOUT NOTICE.
THEY ARE REPRESENTED AS KNOWAT DATE OF MAP PRODUCTION.
IF AN EVENT OR VENUE LOCATION IS NOT IDENTIFIED ON THE MAP,IT DOES NOT MEAN THAT IT IS NOT AFFECTED BY CONSTRUCTION.
This product is for informational purposes and may not have been prepared for or be suitable forlegal, engineering, or surveying purposes. It does not represent an on-the-ground survey and represents only the approximate relative location of property boundaries.This product has been produced by Austin Transportation Department for the sole purposeof geographic reference. No warranty is made by the City of Austin regarding specific accuracyor completeness.
0 1,000 2,000500Feet ´ NOV - MAR 2017
Plotted: 12/8/2016
POSSIBLE CONSTRUCTION CONFLICTS
dgmartindgmartin
dgmartin