portfolio asmf

60
URBAN / ARCHITECTONIC PORTFOLIO by Ana Sabrina Martínez 2008 - 2013

description

Architecture and urban portfolio from 2008 - 2013

Transcript of portfolio asmf

  • URBAN / ARCHITECTONIC PORTFOLIOby Ana Sabrina Martnez

    2008 - 2013

  • 2Age 28Nat MexicanT +32-0483-149-187 M [email protected] Jan Stasstraat 5 bus 8 Leuven 3000, BelgiumG Female

  • Architect and Urban designer

  • 4MOTIVATIONMy main inspiration is the people

    I am applying for collaborating with you as an urbanist and architect. My experience as urban designer, small architectural studio cofounder, head of the special projects department in an automotive corporation, and my latest success, the completion of my masters in urbanism and strategic planning, have uniquely prepared me to understand and solve projects for meeting both, our clients (capital) and the final users needs.

    My personal objective is to develop sustainable projects that consider the social agency as an important part of the design process. I believe that the lessons learned during the fieldwork of my master thesis from the slums in Ecatepec de Morelos, Mexico about sustainability, eco-nomy and self-organization, can be a powerful tool to reinterpret the contemporary city and should be taken into consideration when designing urban and architectural projects.

    Moreover, I consider the landscape as the strongest dialectical element in any territory, as it is the environment in which we live the one that shape us, and at the same time, it is us who constantly re-shape the environment. I am convinced that as urbanist, architects and planners, it is our task to make this dialect a virtuous circle instead of a vicious one.

    I am relocating to Brussels and would welcome an opportunity to talk with you about the open positions. I look forward to hearing from you.

    Sincerely,

    Ana Sabrina Martinez Feria

  • 5

  • 6Academic work

    URBAN DESIGN WORKSHOPS PUBLICATIONSURBANISM20

    1320

    1120

    0920

    1220

    1020

    08ARCHITECTURE

    [9] landscapes of inclusion MX

    [17] interplaying densities CN [23] mapping Taihu CN [56] our common risk

    [57] Gran Via Sabadell

    [33] Hercules - La Caada MX

    [27] Gran Via ES

    CONTENTS

  • 7Work experience

    URBAN DESIGN EXERCISES PUBLICATIONSURBANISM ARCHITECTURE

    [37] reconstruction IT

    [49] residential MX

    [51] residential MX

    [52] refurbishment MX

    [41] North Qro MX [47] Mediterraneo MX

    [46] Machorra MX

  • 82013

  • 9LANDSCAPES OF INCLUSION and their moving spaces

    Academic projectMaster thesis

    EMU Programme - KU Leuven

  • 10

    location: Ecatepec de Morelos, State of Mexico, Mexicoarea: 160,17 km2promoter: Bruno De Meulder scope: Master thesisdate: November 2012 - June 2013video: https://vimeo.com/73993110

    LANDSCAPES OF INCLUSION AND THEIR MOVING SPACES

    Ecatepec de Morelos is a mosaic of fragmented realities hosting a multicultural environ-ment. A landscape shaped by religious rituals, social traditions and a strongly rooted co-llective imaginary. It is an unfinished product mostly sculpted by informal urban practices, spaces in constant evolution (Turner, 1963), non-stop moving areas (B. Jacques, 2001) that use and create the landscape as a language of perpetual conflict and compromise be-tween what is stablished by the authority and what the vernacular insists upon preferring. (Jackson 1984:148). It is a territory that demands its own right to the city by reclaiming the streets as a collective democratic element (B. Jacques, 2004) were scenes of [civic] public life and activities of exchange take place.

    Located in the northern part of what used to be part of the Lake of Texcoco. The majestic 260 km2 lake has been reduced to 17 km2 in 100 years. The dramatically shrinking water surface, the risk of flooding events and obsolete drainage system combined with high risk areas of subsidence obliges us to think about new solutions, visions and strategies when approaching this territory.

    I propose to recover what should be the most important resource and identity of the area, the water.The three transversal water structures (A,B and C) and the Grand Canal shown the left map, are projected as carrying structures for purified water distribution while serving as storm water runoff and graywater collectors. Both viaducts and open chanals, discharge todays considered wastewater, into the seven urban lakes along the territory. These basins are designed to create large public parks and water filtering infrastructures for processing this element through constructed wetlands and storing it in some of the rehabilitated Lake of Texcoco reservoir for future domestic and agricultural use.

    Mexico City

  • 11

    VISION 2050

    water viaduct

    purified water basin

    street market

    floodable areaslakeside transition

    agroecosystemswoods

    open canals

    storm and gray water recollection

    water centers and communitary gardens

    constructed wetlands

    vaporeto system

    teleferic gondola systemvaporeto station

    teleferic gondola station

    suburban train station

    1

    1

    3

    2

    2

    43

    5topography lines every 10 m

    existing metro system

    topography lines every 2.5 mtopography lines every 0.5 mold lake of texcoco line

    El Caracol water parkLake of Texcoco National Park

    dam - storm runoff collection4

    5

    Grand CanalRemedios River

    buildings on pilesdike building

    0 2

    1 3

    5km

  • 12

    structure a

    structure b

    structure c

    dry season wet season

    proposed section in floodable and subsidence area

    existing section in floodable and subsidence area

    0 2

    1 3

    5

    a

    bZ1

    c

    AA

    km

  • 13

    terraces anti-erosion

    terraces anti-erosion

    community gardenscamping area

    cut and fill tecnique used for dike construction

    constructed wetlands terraces for water purification

    water collector

    proposal of water collection. (mountain system) section A-A

    section proposal B-B

    water collector

    cut

    fill

    camping area

    public baths and gymnasium

    public baths and gymnasium

    tianguis plaza

    terraces for erosion control

    gondola lift system

    dike

    tree nursery for controling urban growth and erosion

    community library

    public baths

    chapel

    filtering wetland terraces

    day-care center

    community gardens

    B

    B

    0 3

    51

    10

    0 5

    102,5

    20

    0 10

    305

    60

    m

    m

    m

  • 14

    public baths and gymnasium

    dwellings reconvertion to mixed use

    civic center

    warehouses reconvertion to mixed use

    purified water basin

    abbandoned rail tracks used for moving market

    C

    C

    existing section

    tianguis taxi rack

    parking

    proposed viaduct (structure b)

    0 10

    305

    60m

  • 15

    VISION 2150?

    0 2

    1 3

    5

    water viaduct

    purified water basin

    street market

    floodable areaslakeside transition

    agroecosystemswoods

    open canals

    storm and gray water recollection

    water centers and communitary gardens

    constructed wetlands

    vaporeto system

    teleferic gondola systemvaporeto station

    teleferic gondola station

    topography lines every 10 mexisting metro system

    topography lines every 2.5 mtopography lines every 0.5 mold lake of texcoco line

    dam - storm runoff collection

    buildings on pilesdike building

    km

  • 16

    2012

  • 17

    INTERPLAYING DENSITIESVision for Taihu 2040

    Academic projectEMU Programme - KU Leuven

  • location: Taihu, Beijing, Chinaprofessor: Kelly Shannon, Viviana dAuriateam: Ana Martinez, Calin Lambrache, Dennis Schowers, Ray Qin, Sam Khabir, Tianlu Chou, Yuvi Chauhan, Jonas Knapenscope: urbanism and urban design proyectdate: February 2012 - June 2012

    INTERPLAYING DENSITIES

    Beijing is booming at an unbelievable speed. In thirty years the city has grown up till its 6th ring road, where the Taihu municipality is located. The massive migration from rural to urban metropolis and the opening of the new high speed train station that connects Tianjin with Beijing, creates a strong trend of urbanizing the area. We believe that the challenge is to create a city that allows growing and shrinking. A dynamic, flexible, multifunctional city that rethinks density as a way of regenerating the urban fabric while creating a void occu-pied by a high-tech productive landscape. As a result, our project focuses on offering three diverse lifestyles - Ciquizhen City, Jin Kuang Villages and the Lian Villa -

    Ciquizhen City is proposed for people wishing to have a healthy and intense outdoor life. The main idea is to create a car-less city were the public realm is completely designed while the private areas can be projected according to the inhabitants dreams.

    In Lian Villa, we have created a sanctuary specially for those who aim to live in balance with nature. We developed a natural-like man-made landscape network that connects the different villas to a series of get-away spaces, designed for their comfort and enjoyment. Moreover, the development gives them the opportunity to produce their own organic food, while living in a first class villa that can be shaped according to their needs.

    The Jin Kuang Villages are multilayered small/medium enterprise networks, that bring pri-vate and public investments to the area providing trading and training facilities along the Xiao Tai Hou River. The project aims to protect the traditional villages, while regenerating the urban tissue. This is archieved by developing new housing typologies that combine work and living units.

    Beijing

  • VISION 2040

    1

    3

    2

    0 2

    1 3

    5

    rivers

    fish pondsfloodable areasparks

    productive landscapeexisting villages

    open canalsconstructed wetlands

    Jin Kuang Villages

    123

    Ciquizhen CityLian Villa

    new urban tissue

    km

  • Ciquizhen City section A-A

    Taihu train station

    overlooking the productive landscape

    second level of public space

    section B-B

    section C-C

    AC

    BAC

    B

  • Lian Villa

    section A-A

    traditional villages with new typologies and water structures

    Cizumi viewpoint tower

    section B-B

    A

    B

    A

    B

    Z1

    Single house

    ground floor family house

    first floor family house

    0 2

    1 3

    5

    0 2

    1 3

    5

    10

    10

    m

    m

  • Jin Kuang VillagesA

    BAB

    fish village

    dog village

    lotus ponds village

    section A-A

    section B-B

    mts0 200 400

    100 300 500

    Z1

  • 23

    NOMADICSCAPESmapping Taihu

    intensive fieldwork and mapping workshop

    Academic projectEMU Programme - KU Leuven & PKU China

  • 24

  • location: Taihu, Beijing, Chinaprofessor: Kelly Shannon, Viviana dAuria, Bruno De Meulderscope: fieldwork and mapping exercisedate: March 2012

    NOMADICSCAPES

  • 26 201

    1

  • 27

    GRAN VIAThe metropolitan street of Sabadell

    Academic projectEMU Programme - UPC Barcelona

  • location: Sabadell, Barcelona, Mexicoprofessor: Antonio Font and Isabel Castieirateam: Ana Martinez, Ana Neto, Andrea Voigt, Angelica Salazar, Carmen Boyer, Pau Fuster, Sophia Fernndez, Sonia Adamuz,Tomas Castro,Xavier Riberascope: urban planning proyectdate: February 2011 - May 2012

    GRAN VIA, THE METROPOLITAN STREET OF SABADELL

    The Gran Va in Sabadell is today mainly used as the main car connection between the City of Barcelona and its northern metropolitan area, creating a strong barrier between the downtown (north) and the industrial town (south). The proposal re-thinks the highway as a suburban clamp that reintegrates both sides of the city proposing a new cultural spine with public plugge-in programmes for leisure, heath, education and housing. The project is reinforce by a multimodal mobility network plan, which will allow the down-grading of street and therefore, the decrease the amount of vehicles for creating other types of activities.

    avenue as barrier densityintensity of use

    boulevard of inte-gration

    mobility flowsc o n s t r u c t i o n of ringroad for down-grading the boulevard

    Barcelona

    change of paradigm

  • restructuration road hierarchy

    actual situation actual section proposed sectionlocation

    restructuration of bus lines (13 to 8 lines) and waiting time reduction (25 min to 12 min) rising the system capacity (33% to 41%).

    Bike strategy implementation

    mobility strategy

    eco-bicing

    lane Ripoll

    parking bike

    wild routeline 7

    line 3

    line 5

    line 1

    actual bike lane

    proposal for new lanesbike-friendly streets proposalline 8

    line 4

    line 6

    line 2

    0 2,5

    1 5km

    0 2,5

    1 5km

    Value map

    important buildings

    empty plotsparking lotscity doors

    areas of opportunitycommerce

    public facilities

    Carrer Ramon Llul

    Carrer de Barcelona

    Calle Rambla

    Calle Saint Pau

    Calle M. dei Rei

    Calle de Sol i Pardis

    Calle del C. de Raul

  • Gran Via wider typical section

    actual situation

    option A1 (Rambla)

    option B1

    option A2

    option B2

    option A3

    option A1

    option A3

    option B2

    sidewalks

    central rambla,bike lane,tram stop, wide sidewalks

    wide sidewalks, bike lane,tram stop

    wide sidewalks, bike lane

    wide sidewalks, bike lane,tram stop

    wide sidewalks, bike lane,tram stop

    space for transportation 60% space for pedestrian 40%

    space for transportation 35% space for pedestrian 65%

    space for transportation 35% space for pedestrian 65%

    space for transportation 40% space for pedestrian 60%

    space for transportation 30% space for pedestrian 70%

    space for transportation 35% space for pedestrian 65%

    space for transportation 70% space for pedestrian 30%

    space for transportation 70% space for pedestrian 30%

    space for transportation 55% space for pedestrian 45%

    space for transportation 70% space for pedestrian 30%

    space for transportation 50% space for pedestrian 50%

    space for transportation 60% space for pedestrian 40%

    bus lines

    tram lane

    tram lane

    tram lane

    tram lane

    tram lane

    2 car lanes in each direction+ side lanes andparking space

    2 car lanes in each direction

    2 car lanes in each direction

    2 car lanes in each direction

    1 car lane in each direction, 1 lane for left turn

    2 car lanes in each direction

    Gran Via narrowertypical section

    typical boulevard section proposal 2

    typical boulevard section proposal 1

    typical boulevard section proposal 3

  • typical promenadesection proposal 1

    pedestrian movements

    cross street

    Gran va - Ctra Prats de Llucanes

    Gran va - C de Caldes

    Gran va - C de les Creus

    Gran va - Sol i Pardis

    Gran va - RamblaGran va - Ctra Barcelona

  • 32

    2009

  • 33

    HERCULES - LA CAADAtowards a policentric city

    Academic projectbachelor architecture- ITESM Queretaro

  • location: La Caada, Queretaro, MexicoProfessor: Alfonso Garduo, Carlos Gmezteam: Ana Martinez, Aurelio Valtierrascope: Urban/Architectonic designdate: August 2009 - December 2009

    HERCULES - LA CAADA

    Santiago de Quertaro is one of the most important cities of Mexico. It is located 178km from Mexico city and forms part of the industrial area called Bajio. As many latin american cities, during the last 30 years Queretaros urban sprawl has grown up to 16 times more, without any fixed plan or design. This undergraduate exercise was done to understand the agents of growth of the city while recovering the identity of the neighborhood Hercules and La Caada. These are the barrios were the indigenous people settled back in the day of the colonization. Moreover, this area is known as the place were the spring-water was collected and transported towards the city center. Today an almost deserted highly polluted river is all that remains. The project aims to recover the river side while regaining the old centrality of the area.

    Current Proposed

    Monocentric city

    Poly-centric city

    Current Proposed

    Monocentric city

    Poly-centric city

    actual situation monocentric city proposed poli-centric city proposed density

    actual density

    Quertaro

    mobility

    levels of pollution

    industry

    16%64.354 ton/yr

    73%286.000 ton/yr

    11%42.902ton/yr

    nature

    moves

  • plots to intervine

    plots to intervine

    T4 without riverfront

    T4 with riverfront

    accessrectorylibrarytheaterperforming artsvisual arts

    T3

    T2

    tram

    bike lane

    river purification

    recovery of river front with public plugged-in facilities

    Z1

    performing arts building ground floor 0 21 3

    5

    10

    10

    m

    mperforming arts building first floor 0 21 3

    5

  • 36

    RECOSTRUCTION OF PALAZZO CAMPONESCHIL Aquila

    Work Experienceinternship - Rizzi Proteco

    2011

  • 37

  • 38

  • location: L Aquila, Italyarchitect: Rizzi Protecoocupation: intership/ modelerscope: projectdate: June 2011 - September 2011

    RECOSTRUCTION OF PALAZZO CAMPONESCHI

    The earthquake of 2009 in the region of Abruzzo affected mostly the city of L Aquila. Today the city looks like what could only be described as a post-disaster abbandoned area. To restablish the economical activities, some organizations decided to begin with the recons-truction of the most imporant monuments. This exercise was done for a competiotion held by the municipality of L aquila during a period of three months summer internship in Veni-ce. at the studio Rizzi Proteco. The main activity I performed was the production of three plaster models for explaining the relation and importance of the Palazzo Camponeschi and the city. One 1:500, 1:25,000 and 1:100,000

    physiognomy of the city and morphology of the place

    Palazzo Camponeschi and La Fontana delle 99 CannelleCity and landscape

  • 40

    NORTH DEVELOPMENTa new way of planning the city

    Work Experienceintership in urban planning - NURBLAT Queretaro

    2008

  • 41

  • location: Santa Rosa Jauregui, Queretaro, Mexicoarchitect: Nuevo Urbanismo Latinoamericanoocupation: designerscope: Urban planning projectdate: September 2008 - April 2009area: 700 ha

    NORTH DEVELOPMENT

    The Development of Santa Rosa, will be the first sustainable project of these dimensions ever built for the Quertaro City. In an hybrid yet fragmented city that has them both, his-torical and industrialized potentials, remains the nostalgia of the down town city center as the place where things happen in contrast to the contemporary city where sprawl has taken place taking away any kind of public space. The development is conceptualized with prin-ciples of New Urbanism, where the idea of a poli-center city linked by urban and suburban system of parks and plazas.

    Quertaro

    green structures districts and densitiesneighborhoods facing

    1

    7

    2

    5

    3

    6

    4

    1.Green corridors 5.Hopitals district 9. Mall2. Principal Avenue 6.Civic/Commercial district 10.Lake 3.Educational facilities 7.University district 11.Urban Park4.Ecoindustrial district 8.Club 12.Ecological reserve

  • masterplan streets and main avenues0 21 3

    km

  • 44

    TRAINING PROJECTSre-thinking the industrial city

    Work Experienceintership in urban planning - NURBLAT Queretaro

    2008

  • 45

  • location: Queretaro, Mexicoarchitect: Nuevo Urbanismo Latinoamericano (NURBLAT)ocupation: designerscope: projectdate: September 2008 - April 2009

    LA MACHORRA DEVELOPMENT

    La Machorra was a rapid exercise for creating a new neighborhood next to an industrial development. The challenge of this project was to create a housing neighborhood that allowed mixed use and at the same time, create a public space network with low founds.

  • location: Queretaro, Mexicoarchitect: Nuevo Urbanismo Latinoamericano (NURBLAT)ocupation: designerscope: projectdate: September 2008 - April 2009

    MEDITERRANEO DEVELOPMENT

    The first project I had during my intern was to take the Fraccionamiento Mediterraneo in Corregidora Quertaro (made by another firm) and redesign it with more economical and spatial values. The original design functions as a cluster with 129 houses without any kind of public space or commerce area. The redesign project archived 120 dwellings plus 22 spots for commerce and a small community park keeping the sizes of the housing plot of the original plan.

  • 48

    ARCHITECTONIC PROJECTS private clients - residential houses

    Work Experiencedesigner - Laboratorio Siete Arquitectura

    Queretaro

    NOTE: For privacy reasons the clients requested not to reveal the plans of the houses

    2010

    2009

  • 49

  • location: Nuevo Len, Mexicoarchitect: Laboratorio Siete Arquitecturaocupation: designerscope: architectonic projectdate: January 2010 - June 2010

    CASA SANCHEZ CASTILLO

    This project arrived to us after finishing the Casa Snchez Carrillo. Our former client was happy with the results and recommended us to her brother in Monterrey, Nuevo Len. The challenge of this project was to merge the interest of a recently married couple. They wan-ted a dynamic house where their family could grow.

    main entrance living room and staircase

    backside facade

  • location: Quertaro, Mexicoarchitect: Laboratorio Siete Arquitecturaocupation: designerscope: architectonic project date: August 2009 - October 2009

    CASA SANCHEZ CARRILLO

    First single family house design made by Laboratorio Siete Arquitectura. The challenge was to propose an interesting and at the same time economical project. The clients were a couple in their late 40s with two teenage children.

    dinning room kitchen

    public area perspective

  • location: State of Mexico, Mexicoarchitect: Laboratorio Siete Arquitecturaocupation: designerscope: refurbishment and expansion project and constructiondate: June 2009 - April 2010

    CABAA XACH

    The Cabaa Xach was a project taken when half of the house was already built. The clients had several problems with the former architects and decided to change firms. The challenge in this project was to reinterpret the shell of the house and reshuffle the inte-riors to better fulfill the clients needs. Moreover, a third body was requested projected and approved by the clients.

    House re-oriented towards the landscape. Interventions: the main facade was practically deniying the landscape. We redirected the central body by proposing a glass facade due to its public function

    re-distribution of Master room

    ground floor: chimney, living and dinning room in central body. First floor: Reading area chidrens room proposal

  • 53

  • 54

    2012

    2011

  • 55

    PUBLICATIONS

    Academic projectsIUAV - EMUUPC - EMU

  • The booklet Our Common Risk Scenarios for the diffused city is published. It collects the results of the fall semester 2011/2012 of the EMU (IUAV University of Venice) produced by the Master students and profes sors together with Latitude, in the frame of the 5th International Architecture Biennale of Rotterdam (2012)

  • The booklet La reforma de la Gran Via Un projecte de futur is published. It collects the re-sults of the spring semester 2011/2012 of the EMU (Universidad Politcnica de Catalua) produced by the Master students and professors.

  • 58

  • 59

    Thanks for your consideration

    For more information, videos, photographs and projects please visit my webpage:http://annies-002.wix.com/urbanandarchitectonicprojects#!__pm-ingles